TWI718657B - Low-duty-type power generation abnormality detection method and system for photovoltaic panels - Google Patents

Low-duty-type power generation abnormality detection method and system for photovoltaic panels Download PDF

Info

Publication number
TWI718657B
TWI718657B TW108132308A TW108132308A TWI718657B TW I718657 B TWI718657 B TW I718657B TW 108132308 A TW108132308 A TW 108132308A TW 108132308 A TW108132308 A TW 108132308A TW I718657 B TWI718657 B TW I718657B
Authority
TW
Taiwan
Prior art keywords
point
power generation
reference point
solar panel
power
Prior art date
Application number
TW108132308A
Other languages
Chinese (zh)
Other versions
TW202112055A (en
Inventor
張耀仁
馮雅聰
蔣文榮
李家閎
Original Assignee
盈正豫順電子股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 盈正豫順電子股份有限公司 filed Critical 盈正豫順電子股份有限公司
Priority to TW108132308A priority Critical patent/TWI718657B/en
Application granted granted Critical
Publication of TWI718657B publication Critical patent/TWI718657B/en
Publication of TW202112055A publication Critical patent/TW202112055A/en

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Abstract

A low-duty-type power generation abnormality detection method includes: operating a power converter to measure a first reference voltage and a first reference current between a first near-MPP point and a near-Isc point of a solar cell module which are calculated to obtain a first reference power to compare with first abnormal PV-curve features; alternatively, operating the power converter to measure a second reference voltage and a second reference current between a second near-MPP point and a near-Voc point of the solar cell module which are calculated to obtain a second reference power to compare with second abnormal PV-curve features.

Description

輕量型太陽能板發電異常測試方法及其系統 Lightweight solar panel power generation abnormal test method and system

本發明係關於一種輕量型〔low-duty-type〕太陽能板發電異常測試方法及其系統;特別是關於一種輕量型或簡化型太陽能板發電異常〔故障、老化或受遮蔽〕初步測試方法及其系統,並後續結合執行一太陽能板發電異常進階測試方法及其系統;更特別是關於一種適用於利用一電能轉換器〔power converter〕或一逆變器〔inverter〕執行資料輕量型或資料簡化型太陽能板發電異常測試方法及其系統。 The present invention relates to a light-weight (low-duty-type) solar panel power generation abnormality test method and system thereof; in particular, it relates to a lightweight or simplified solar panel power generation abnormality [failure, aging or obscuration] preliminary test method And its system, and subsequently combined with the implementation of an advanced test method and system for solar panel power generation abnormalities; more particularly, it relates to a lightweight type suitable for using a power converter (power converter) or an inverter (inverter) to execute data Or data-simplified solar panel power generation abnormal test method and system.

另一習用太陽能板發電異常偵測方法及其系統,例如:中華民國專利公告第TW-I630790號〝太陽能發電系統與太陽能模組發電異常檢測方法〞之發明專利,其揭示太陽能發電系統與太陽能模組發電異常檢測方法,該檢測方法包含步驟:A、經由電連接於一太陽能模組串列之一逆變器,並將一音頻訊號輸入至該太陽能模組串列之一電力迴路;B、一耦合接收器用以感應接收在該電力迴路傳送之音頻訊號,且該耦合接收器沿該電力迴路位移;及C、利用該耦合接收器根據該音頻訊號的感測結果對應輸出一提示訊息,且人體能感知該提示訊息。 Another conventional solar panel power generation anomaly detection method and system, such as the invention patent of the Republic of China Patent Publication No. TW-I630790 "Solar Power Generation System and Solar Module Power Generation Abnormality Detection Method", which discloses the solar power generation system and the solar module Group power generation abnormality detection method, the detection method includes the steps: A. It is electrically connected to an inverter of a solar module string, and an audio signal is input to a power circuit of the solar module string; B. A coupled receiver is used to sense and receive the audio signal transmitted in the power loop, and the coupled receiver is displaced along the power loop; and C. Use the coupled receiver to correspondingly output a prompt message according to the sensing result of the audio signal, and The human body can perceive the prompt message.

承上,依前述第TW-I630790號之該太陽能模組發電異常檢測方法設計,可根據該耦合接收器輸出之該提示訊息之內容,立即判斷出該耦合接收器是否通過該電 力迴路之斷路故障點,能快速檢測尋找出該太陽能模組串列之斷路故障點位置。 In addition, according to the design of the solar module power generation abnormality detection method of No. TW-I630790, it is possible to immediately determine whether the coupling receiver passes the electricity according to the content of the prompt message output by the coupling receiver. The open circuit fault point of the force circuit can be quickly detected to find the open circuit fault point position of the solar module string.

然而,前述第TW-I630790號之該太陽能模組發電異常檢測方法僅適用於一般以判斷該耦合接收器是否通過該電力迴路之斷路故障點方式,檢測尋找該太陽能模組串列之斷路故障點位置,但其無法提供簡化型太陽能板發電特性曲線異常測試方法及其系統,以提供適用於初步異常測試作業。 However, the aforementioned solar module power generation abnormality detection method of No. TW-I630790 is only applicable to generally determine whether the coupled receiver has passed the open fault point of the power circuit, and detect and find the open fault point of the solar module string Location, but it cannot provide a simplified solar panel power generation characteristic curve abnormality test method and system to provide it suitable for preliminary abnormal test operations.

另一習用太陽能板發電異常偵測方法及其系統,例如:中華民國專利公告第TW-I499887號〝太陽能發電系統與其異常檢測方法〞之發明專利,其揭示一種太陽能發電系統與其異常檢測方法。該太陽能發電系統包含一最大功率追蹤控制器及數組太陽能發電單元。該太陽能發電系統之異常檢測方法包含:一標準責任週期值建立階段及一供電階段。 Another conventional solar panel power generation abnormality detection method and system, such as the invention patent of the Republic of China Patent Publication No. TW-I499887 "Solar Power Generation System and Its Abnormality Detection Method", which discloses a solar power generation system and its abnormality detection method. The solar power generation system includes a maximum power tracking controller and an array of solar power generation units. The abnormality detection method of the solar power generation system includes: a standard duty cycle value establishment phase and a power supply phase.

承上,前述第TW-I499887號之該太陽能發電系統之異常檢測方法在該標準責任週期值建立階段中,首先檢查該太陽能發電單元,以確保該太陽能發電單元是否正常發電。接著,利用該最大功率追蹤控制器輸出一控制訊號至該太陽能發電單元,使該太陽能發電系統輸出一最大功率,並計算該太陽能發電單元之一標準責任週期範圍。 In addition, in the aforementioned method for detecting abnormality of the solar power generation system of No. TW-I499887, during the establishment of the standard duty cycle value, the solar power generation unit is first checked to ensure that the solar power generation unit is normally generating electricity. Then, the maximum power tracking controller is used to output a control signal to the solar power generation unit, so that the solar power generation system outputs a maximum power, and a standard duty cycle range of the solar power generation unit is calculated.

承上,前述第TW-I499887號之該太陽能發電系統之異常檢測方法另在該供電階段中,不定期判斷於該太陽能發電單元之責任週期值是否位於其相對應之該標準責任週期範圍內,以便判斷確定該太陽能發電單元是否發生發電異常。 Continuing with the above, the abnormal detection method of the solar power generation system of No. TW-I499887 mentioned above is also in the power supply phase, irregularly judging whether the responsibility period value of the solar power unit is within the corresponding standard responsibility period range, In order to determine whether the solar power generation unit has abnormal power generation.

然而,前述第TW-I499887號之該太陽能發電系統之異常檢測方法僅適用於一般在該供電階段中判斷於該太陽能發電單元之責任週期值是否位於其相對應之該標 準責任週期範圍內,但其無法提供簡化型太陽能板發電特性曲線異常測試方法及其系統,以提供適用於初步異常測試作業。 However, the aforementioned abnormality detection method for the solar power generation system of No. TW-I499887 is only applicable to generally determine whether the solar power generation unit’s duty cycle value is within its corresponding standard during the power supply phase. Within the scope of the quasi-responsibility period, it is unable to provide a simplified solar panel power generation characteristic curve abnormality test method and system to provide a preliminary abnormal test operation.

另一習用太陽能板發電異常偵測方法及其系統,例如:美國專利公開第US-20160019323號〝Solar Power Generation System,Abnormality Determination Processing Device,Abnormality Determination Processing Method,and Program〞之專利申請案,其揭示一種太陽能板發電異常偵測系統。一太陽能發電系統包含一太陽能發電模組〔solar power generation module〕、一電力量測單元〔power measurement unit〕、一逆變器〔inverter〕、一太陽照度計〔abnormality determination unit〕及一發電異常偵測單元〔power measurement unit〕。 Another conventional solar panel power generation abnormality detection method and system, for example: US Patent Publication No. US-20160019323 "Solar Power Generation System, Abnormality Determination Processing Device, Abnormality Determination Processing Method, and Program" patent application, which discloses A solar panel power generation abnormality detection system. A solar power generation system includes a solar power generation module (solar power generation module), a power measurement unit (power measurement unit), an inverter (inverter), a solar illuminance meter (abnormality determination unit), and a power generation abnormality detection unit. Power measurement unit [power measurement unit].

然而,前述第US-20160019323號之該太陽能板發電異常偵測系統必需採用該太陽照度計及發電異常偵測單元,且該發電異常偵測單元連接至該電力量測單元,以便讀取該電力量測單元之電力資料。因此,該太陽能板發電異常偵測系統及其方法具有系統結構及其偵測作業複雜的缺點。 However, the aforementioned solar panel power generation abnormality detection system of US-20160019323 must use the solar illuminance meter and the generation abnormality detection unit, and the generation abnormality detection unit is connected to the power measurement unit in order to read the power Power data of the measurement unit. Therefore, the solar panel power generation anomaly detection system and method have the disadvantage of complicated system structure and its detection operation.

另一習用太陽能板發電異常偵測方法及其系統,例如:美國專利公開第US-20130300449號〝Solar Power Generation System,Abnormality Detection Method,and Abnormality Detection System〞之專利申請案,其揭示另一種太陽能板發電異常偵測系統。該太陽能板發電異常偵測系統連接至一太陽能電池〔solar battery〕,且該太陽能電池包含一電流偵測單元〔current detection unit〕及一電壓偵測單元〔voltage detection unit〕。該太陽能板發電異常偵測系統包含一特性計算單元〔characteristic calculation unit〕、一異常偵測單元〔abnormality detection unit〕及一 環境量測單元〔environment measurement unit〕。 Another conventional solar panel power generation abnormality detection method and system, for example: US Patent Publication No. US-20130300449 "Solar Power Generation System, Abnormality Detection Method, and Abnormality Detection System" patent application, which discloses another solar panel Power generation anomaly detection system. The solar panel power generation abnormality detection system is connected to a solar battery [solar battery], and the solar battery includes a current detection unit [current detection unit] and a voltage detection unit [voltage detection unit]. The solar panel power generation abnormality detection system includes a characteristic calculation unit (characteristic calculation unit), an abnormality detection unit (abnormality detection unit) and an Environmental measurement unit [environment measurement unit].

然而,前述第US-20130300449號之該太陽能板發電異常偵測系統必需採用該電流偵測單元、電壓偵測單元、特性計算單元、異常偵測單元及環境量測單元,且該電流偵測單元及電壓偵測單元連接至該太陽能電池,以便讀取該太陽能電池之電流及電壓資料。因此,該太陽能板發電異常偵測系統及其方法具有系統結構及其偵測作業複雜的缺點。 However, the aforementioned solar panel power generation anomaly detection system of US-20130300449 must use the current detection unit, voltage detection unit, characteristic calculation unit, anomaly detection unit, and environmental measurement unit, and the current detection unit And the voltage detection unit is connected to the solar cell so as to read the current and voltage data of the solar cell. Therefore, the solar panel power generation anomaly detection system and method have the disadvantage of complicated system structure and its detection operation.

另一習用太陽能板發電異常偵測方法及其系統,例如:中華民國專利公告第TW-I595744號〝太陽能板發電異常測試方法及其系統〞之發明專利,其揭示一種太陽能板發電異常測試方法。 Another conventional solar panel power generation abnormality detection method and system, such as the invention patent of the Republic of China Patent Publication No. TW-I595744 "Solar panel power generation abnormality test method and system", which discloses a solar panel power generation abnormality test method.

承上,前述第TW-I595744號之該方法包含:利用一電能轉換器直接控制一太陽能電池模組而操作於數個預定電壓點,並利用該數個預定電壓點量測獲得數個量測電流;利用該數個預定電壓點及數個量測電流計算數個第一功率資料;及利用該數個第一功率資料與一第一發電特性曲線進行比對;或,利用該電能轉換器直接控制該太陽能電池模組而操作於數個預定電流點,並利用該數個預定電流點量測獲得數個量測電壓;利用該數個預定電流點及數個量測電壓計算數個第二功率資料;及利用該數個第二功率資料與一第二發電特性曲線進行比對,以測試該太陽能電池模組是否發電異常。 Continuing, the method of No. TW-I595744 mentioned above includes: using a power converter to directly control a solar cell module to operate at a number of predetermined voltage points, and using the predetermined voltage point measurements to obtain a number of measurements Current; use the plurality of predetermined voltage points and the plurality of measured currents to calculate a plurality of first power data; and use the plurality of first power data to compare with a first power generation characteristic curve; or, use the power converter Directly control the solar cell module to operate at a number of predetermined current points, and use the predetermined current points to measure to obtain a number of measured voltages; use the predetermined current points and the number of measured voltages to calculate the number of Two power data; and comparing the plurality of second power data with a second power generation characteristic curve to test whether the solar cell module generates abnormally.

然而,前述第TW-I595744號之該太陽能板發電異常測試方法為需要計算較多筆數量之數個該第一功率資料或數個該第二功率資料,但其仍存在提供簡化型太陽能板發電特性或其曲線異常測試方法及其系統之需求,以提供適用於初步異常測試作業。 However, the aforementioned solar panel power generation abnormality test method No. TW-I595744 requires to calculate a large number of the first power data or the second power data, but it still provides a simplified solar panel power generation Characteristic or its curve abnormality test method and system requirements are provided for preliminary abnormality test operations.

顯然,習用太陽能板發電異常偵測方法及其系 統必然存在進一步如何簡化其發電異常偵測系統結構及其方法之需求。前述專利申請案僅為本發明技術背景之參考及說明目前技術發展狀態而已,其並非用以限制本發明之範圍。 Obviously, the conventional solar panel power generation anomaly detection method and its system There must be a need to further simplify the structure and method of its power generation anomaly detection system. The aforementioned patent application is only a reference for the technical background of the present invention and an explanation of the current state of technology development, and is not intended to limit the scope of the present invention.

有鑑於此,本發明為了滿足上述技術問題及需求,其提供一種資料輕量型或資料簡化型太陽能板發電異常測試方法及其系統,其利用一電能轉換器〔或逆變器〕於一太陽能電池模組之一第一近最大功率點及一近短路電流點之間量測至少一第一參考點電壓及至少一第一參考點電流,並利用該第一參考點電壓及第一參考點電流計算至少一第一參考點功率,且利用該第一參考點功率與一第一發電曲線異常特性進行比對;或,利用該電能轉換器於一太陽能電池模組之一第二近最大功率點及一近開路電壓點之間量測至少一第二參考點電壓及至少一第二參考點電流,並利用該第二參考點電壓及第二參考點電流計算至少一第二參考點功率,且利用該第二參考點功率與一第二發電曲線異常特性進行比對,以測試該太陽能電池模組是否發電異常,因此相對於習用太陽能板發電異常偵測系統及其方法可確實大幅減少發電異常測試傳輸通訊資料數量〔僅採用少量測量點〕、進一步簡化發電異常測試作業程序及降低發電異常測試成本。 In view of this, in order to meet the above technical problems and needs, the present invention provides a light-weight or data-simplified solar panel power generation abnormality test method and system, which utilizes a power converter (or inverter) in a solar panel. Measure at least one first reference point voltage and at least one first reference point current between a first near maximum power point and a near short circuit current point of the battery module, and use the first reference point voltage and the first reference point Calculate the power of at least one first reference point by current, and compare the power at the first reference point with an abnormal characteristic of a first power generation curve; or, use the electric energy converter in a solar cell module with a second near-maximum power Measure at least one second reference point voltage and at least one second reference point current between a point and a near-open circuit voltage point, and use the second reference point voltage and the second reference point current to calculate at least one second reference point power, The power of the second reference point is compared with the abnormal characteristics of a second power generation curve to test whether the solar cell module generates abnormal power. Therefore, compared with the conventional solar panel power generation abnormality detection system and method, the power generation can be greatly reduced. Abnormal test transmission communication data amount (only a few measuring points are used), further simplify the power generation abnormality test operation procedure and reduce the power generation abnormality test cost.

本發明較佳實施例之主要目的係提供一種資料輕量型或資料簡化型太陽能板發電異常測試方法及其系統,其利用一電能轉換器〔或逆變器〕於一太陽能電池模組之一第一近最大功率點及一近短路電流點之間量測至少一第一參考點電壓及至少一第一參考點電流,並利用該第一參考點電壓及第一參考點電流計算至少一第一參考點功率,且利用該第一參考點功率與一第一發電曲線異常特性 進行比對,以達成大幅減少發電異常測試傳輸通訊資料數量〔僅採用少量測量點〕、簡化發電異常測試作業程序及降低發電異常測試成本之目的。 The main purpose of the preferred embodiment of the present invention is to provide a light-weight or data-simplified solar panel power generation abnormality test method and system, which utilizes a power converter (or inverter) in one of the solar cell modules Measure at least one first reference point voltage and at least one first reference point current between the first near maximum power point and a near short-circuit current point, and use the first reference point voltage and the first reference point current to calculate at least one second A reference point power, and using the first reference point power and a first power generation curve abnormal characteristic The comparison is carried out to achieve the purpose of greatly reducing the amount of communication data transmitted for abnormal power generation tests (only a few measurement points are used), simplifying the operating procedures of abnormal power generation tests and reducing the cost of abnormal power generation tests.

本發明較佳實施例之另一目的係提供一種資料輕量型或資料簡化型太陽能板發電異常測試方法及其系統,其利用一電能轉換器〔或逆變器〕於一太陽能電池模組之一第二近最大功率點及一近開路電壓點之間量測至少一第二參考點電壓及至少一第二參考點電流,並利用該第二參考點電壓及第二參考點電流計算至少一第二參考點功率,且利用該第二參考點功率與一第二發電曲線異常特性進行比對,以測試該太陽能電池模組是否發電異常,以達成大幅減少發電異常測試傳輸通訊資料數量〔僅採用少量測量點〕、簡化發電異常測試作業程序及降低發電異常測試成本之目的。 Another object of the preferred embodiment of the present invention is to provide a light-weight or data-simplified solar panel power generation abnormality test method and system, which utilizes a power converter (or inverter) in a solar cell module Measure at least one second reference point voltage and at least one second reference point current between a second near maximum power point and a near open circuit voltage point, and use the second reference point voltage and the second reference point current to calculate at least one The second reference point power, and the second reference point power is compared with the abnormal characteristics of a second power generation curve to test whether the solar cell module generates abnormal power, so as to achieve a significant reduction in the amount of communication data transmitted during the abnormal power generation test (only The purpose of adopting a small number of measuring points], simplifying the operation procedure of abnormal power generation test and reducing the cost of abnormal power generation test.

為了達成上述目的,本發明較佳實施例之資料輕量型或資料簡化型太陽能板發電異常測試方法包含:利用一電能轉換器〔或逆變器〕控制一太陽能電池模組,並將該太陽能電池模組操作於一第一發電曲線區間;利用該電能轉換器〔或逆變器〕控制該太陽能電池模組而分別操作於一第一近最大功率點及一近短路電流點;於該第一近最大功率點及近短路電流點之間選擇至少一第一參考點,且於該第一參考點量測至少一第一參考點電壓及至少一第一參考點電流;利用該第一參考點電壓及第一參考點電流計算至少一第一參考點功率;及利用該第一參考點功率與一第一發電曲線異常特性進行比對是否異常。 In order to achieve the above objective, the data-lightweight or data-simplified solar panel power generation abnormality test method of the preferred embodiment of the present invention includes: using a power converter (or inverter) to control a solar cell module, and combining the solar The battery module is operated in a first power generation curve section; the solar battery module is controlled by the electric energy converter (or inverter) to operate at a first near maximum power point and a near short-circuit current point, respectively; At least one first reference point is selected between a near maximum power point and a near short-circuit current point, and at least one first reference point voltage and at least one first reference point current are measured at the first reference point; using the first reference The point voltage and the first reference point current are used to calculate at least one first reference point power; and the first reference point power is used to compare with an abnormal characteristic of a first power generation curve to see if it is abnormal.

本發明較佳實施例之該第一近最大功率點包含一第一最大功率點。 The first near maximum power point in the preferred embodiment of the present invention includes a first maximum power point.

本發明較佳實施例之該第一近最大功率點或第一最大功率點用以計算一填充因數特性〔最大輸出功率與短路電流和開路電壓之積的比值〕。 The first near maximum power point or the first maximum power point in the preferred embodiment of the present invention is used to calculate a fill factor characteristic (the ratio of the maximum output power to the product of the short circuit current and the open circuit voltage).

本發明較佳實施例之該近短路電流點包含一短路電流點。 The near short-circuit current point in the preferred embodiment of the present invention includes a short-circuit current point.

本發明較佳實施例之該近短路電流點或短路電流點與第一近最大功率點或第一最大功率點之電流用以計算一電流比率特性。 The currents between the near short-circuit current point or short-circuit current point and the first near maximum power point or the first maximum power point in the preferred embodiment of the present invention are used to calculate a current ratio characteristic.

本發明較佳實施例之該第一參考點位於一第一最大功率點及一短路電流點之間。 In the preferred embodiment of the present invention, the first reference point is located between a first maximum power point and a short-circuit current point.

本發明較佳實施例將一測試單元選擇配置連接於該電能轉換器,或將該測試單元選擇配置連接於一近端裝置或一遠端裝置,且該近端裝置或遠端裝置連接通訊於該電能轉換器。 In the preferred embodiment of the present invention, a test unit selection configuration is connected to the power converter, or the test unit selection configuration is connected to a near-end device or a remote device, and the near-end device or the remote device is connected to communicate with The power converter.

本發明較佳實施例之該近端裝置或遠端裝置用以執行一發電異常進階測試作業。 The near-end device or the remote device in the preferred embodiment of the present invention is used to perform an advanced test operation for abnormal power generation.

為了達成上述目的,本發明較佳實施例之資料輕量型或資料簡化型太陽能板發電異常測試方法包含:利用一電能轉換器〔或逆變器〕控制一太陽能電池模組,並將該太陽能電池模組操作於一第二發電曲線區間;利用該電能轉換器〔或逆變器〕控制該太陽能電池模組而分別操作於一第二近最大功率點及一近開路電壓點;於該第二近最大功率點及近開路電壓點之間選擇至少一第二參考點,且於該第二參考點量測至少一第二參考點電壓及至少一第二參考點電流; 利用該第二參考點電壓及第二參考點電流計算至少一第二參考點功率;及利用該第二參考點功率與一第二發電曲線異常特性進行比對是否異常。 In order to achieve the above objective, the data-lightweight or data-simplified solar panel power generation abnormality test method of the preferred embodiment of the present invention includes: using a power converter (or inverter) to control a solar cell module, and combining the solar The battery module is operated in a second power generation curve section; the solar battery module is controlled by the electric energy converter (or inverter) to operate at a second near maximum power point and a near open circuit voltage point, respectively; At least one second reference point is selected between two near maximum power points and near open circuit voltage points, and at least one second reference point voltage and at least one second reference point current are measured at the second reference point; The second reference point voltage and the second reference point current are used to calculate at least one second reference point power; and the second reference point power is used to compare with an abnormal characteristic of a second power generation curve for abnormality.

本發明較佳實施例之該第二近最大功率點包含一第二最大功率點。 The second near maximum power point in the preferred embodiment of the present invention includes a second maximum power point.

本發明較佳實施例之該第二近最大功率點或第二最大功率點用以計算一填充因數特性〔最大輸出功率與短路電流和開路電壓之積的比值〕。 The second near maximum power point or the second maximum power point in the preferred embodiment of the present invention is used to calculate a fill factor characteristic (the ratio of the maximum output power to the product of the short-circuit current and the open-circuit voltage).

本發明較佳實施例之該近開路電壓點包含一開路電壓點。 The near-open-circuit voltage point in the preferred embodiment of the present invention includes an open-circuit voltage point.

本發明較佳實施例之該近開路電壓點或開路電壓與第二近最大功率點或第二最大功率點之電壓用以計算一電壓比率特性。 The near-open-circuit voltage point or open-circuit voltage and the voltage at the second near-maximum power point or the second maximum power point in the preferred embodiment of the present invention are used to calculate a voltage ratio characteristic.

本發明較佳實施例之該第二參考點位於一第二最大功率點及一開路電壓點之間。 The second reference point in the preferred embodiment of the present invention is located between a second maximum power point and an open circuit voltage point.

本發明較佳實施例將一測試單元選擇配置連接於該電能轉換器,或將該測試單元選擇配置連接於一近端裝置或一遠端裝置,且該近端裝置或遠端裝置連接通訊於該電能轉換器。 In the preferred embodiment of the present invention, a test unit selection configuration is connected to the power converter, or the test unit selection configuration is connected to a near-end device or a remote device, and the near-end device or the remote device is connected to communicate with The power converter.

本發明較佳實施例之該近端裝置或遠端裝置用以執行一發電異常進階測試作業。 The near-end device or the remote device in the preferred embodiment of the present invention is used to perform an advanced test operation for abnormal power generation.

為了達成上述目的,本發明較佳實施例之資料輕量型或資料簡化型太陽能板發電異常測試系統包含:至少一太陽能電池模組,其包含數個子模組;至少一電能轉換器,其連接於該太陽能電池模組;及一測試單元,其選擇配置連接於該電能轉換器,或將該測試單元選擇配置連接於一近端裝置或一遠端 裝置,且該近端裝置或遠端裝置連接通訊於該電能轉換器;其中在一第一發電曲線區間中經由該測試單元控制操作該電能轉換器,將該太陽能電池模組分別操作於一第一近最大功率點及一近短路電流點,並於該第一近最大功率點及近短路電流點之間選擇至少一第一參考點,且於該第一參考點量測至少一第一參考點電壓及至少一第一參考點電流,並利用該第一參考點電壓及第一參考點電流計算至少一第一參考點功率,且利用該第一參考點功率與一第一發電曲線異常特性進行比對是否異常;或其中在一第二發電曲線區間中經由該測試單元控制操作該電能轉換器,將該太陽能電池模組分別操作於一第二近最大功率點及一近開路電壓點,並於該第二近最大功率點及近開路電壓點之間選擇至少一第二參考點,且於該第二參考點量測至少一第二參考點電壓及至少一第二參考點電流,並利用該第二參考點電壓及第二參考點電流計算至少一第二參考點功率,且利用該第二參考點功率與一第二發電曲線異常特性進行比對是否異常。 In order to achieve the above object, the data lightweight or data-simplified solar panel power generation abnormality test system of the preferred embodiment of the present invention includes: at least one solar cell module, which includes several sub-modules; and at least one power converter connected to it In the solar cell module; and a test unit, which is selectively configured to be connected to the power converter, or the test unit is selectively configured to be connected to a near-end device or a remote Device, and the near-end device or the remote device is connected to the electric energy converter; wherein the electric energy converter is controlled and operated by the test unit in a first power generation curve interval, and the solar cell modules are operated in a first A near-maximum power point and a near-short-circuit current point, and at least one first reference point is selected between the first near-maximum power point and the near-short-circuit current point, and at least one first reference is measured at the first reference point Point voltage and at least one first reference point current, and use the first reference point voltage and first reference point current to calculate at least one first reference point power, and use the first reference point power and a first power generation curve abnormal characteristic Compare whether it is abnormal; or wherein in a second power generation curve interval, the power converter is controlled by the test unit to operate the solar cell module at a second near maximum power point and a near open circuit voltage point, respectively, At least one second reference point is selected between the second near maximum power point and near open circuit voltage point, and at least one second reference point voltage and at least one second reference point current are measured at the second reference point, and The second reference point voltage and the second reference point current are used to calculate at least one second reference point power, and the second reference point power is used to compare with an abnormal characteristic of a second power generation curve for abnormality.

本發明較佳實施例之該第一近最大功率點包含一第一最大功率點。 The first near maximum power point in the preferred embodiment of the present invention includes a first maximum power point.

本發明較佳實施例之該第一近最大功率點或第一最大功率點用以計算一填充因數特性〔最大輸出功率與短路電流和開路電壓之積的比值〕。 The first near maximum power point or the first maximum power point in the preferred embodiment of the present invention is used to calculate a fill factor characteristic (the ratio of the maximum output power to the product of the short circuit current and the open circuit voltage).

本發明較佳實施例之該近短路電流點包含一短路電流點。 The near short-circuit current point in the preferred embodiment of the present invention includes a short-circuit current point.

本發明較佳實施例之該近短路電流點或短路電流點與第一近最大功率點或第一最大功率點之電流用以計算一電流比率特性。 The currents between the near short-circuit current point or short-circuit current point and the first near maximum power point or the first maximum power point in the preferred embodiment of the present invention are used to calculate a current ratio characteristic.

本發明較佳實施例之該第一參考點位於一第一最大功率點及一短路電流點之間。 In the preferred embodiment of the present invention, the first reference point is located between a first maximum power point and a short-circuit current point.

本發明較佳實施例之該第二近最大功率點包含一第二最大功率點。 The second near maximum power point in the preferred embodiment of the present invention includes a second maximum power point.

本發明較佳實施例之該第二近最大功率點或第二最大功率點用以計算一填充因數特性〔最大輸出功率與短路電流和開路電壓之積的比值〕。 The second near maximum power point or the second maximum power point in the preferred embodiment of the present invention is used to calculate a fill factor characteristic (the ratio of the maximum output power to the product of the short-circuit current and the open-circuit voltage).

本發明較佳實施例之該近開路電壓點包含一開路電壓點。 The near-open-circuit voltage point in the preferred embodiment of the present invention includes an open-circuit voltage point.

本發明較佳實施例之該近開路電壓點或開路電壓與第二近最大功率點或第二最大功率點之電壓用以計算一電壓比率特性。 The near-open-circuit voltage point or open-circuit voltage and the voltage at the second near-maximum power point or the second maximum power point in the preferred embodiment of the present invention are used to calculate a voltage ratio characteristic.

本發明較佳實施例之該第二參考點位於一第二最大功率點及一開路電壓點之間。 The second reference point in the preferred embodiment of the present invention is located between a second maximum power point and an open circuit voltage point.

本發明較佳實施例之該近端裝置或遠端裝置用以執行一發電異常進階測試作業。 The near-end device or the remote device in the preferred embodiment of the present invention is used to perform an advanced test operation for abnormal power generation.

1‧‧‧太陽能電池模組 1‧‧‧Solar battery module

10‧‧‧子模組 10‧‧‧Submodule

11‧‧‧太陽能電池單元 11‧‧‧Solar battery unit

12‧‧‧旁路二極體 12‧‧‧Bypass diode

2‧‧‧電能轉換器 2‧‧‧Electric energy converter

2a‧‧‧測試單元 2a‧‧‧Test unit

20‧‧‧逆變器 20‧‧‧Inverter

21‧‧‧直流-直流升壓式電能轉換器 21‧‧‧DC-DC step-up power converter

22‧‧‧傳輸模組 22‧‧‧Transmission Module

3‧‧‧測試系統 3‧‧‧Test System

30‧‧‧操作面板 30‧‧‧Operation Panel

4‧‧‧雲端伺服器 4‧‧‧Cloud Server

40‧‧‧遠端測試系統 40‧‧‧Remote Test System

第1圖:本發明較佳實施例採用太陽能電池模組之架構示意圖。 Figure 1: A schematic diagram of the structure of a solar cell module in a preferred embodiment of the present invention.

第2圖:本發明第一較佳實施例之輕量型太陽能板發電異常測試系統之架構示意圖。 Figure 2: A schematic diagram of the structure of the light-weight solar panel power generation abnormality test system according to the first preferred embodiment of the present invention.

第3圖:本發明較佳實施例採用太陽能電池模組發生各種發電異常狀態之曲線示意圖。 Figure 3: A schematic diagram of the curves of various abnormal power generation states using solar cell modules in a preferred embodiment of the present invention.

第4圖:本發明較佳實施例之輕量型太陽能板發電異常測試方法之流程示意圖。 Figure 4: A schematic flow diagram of a method for testing abnormal power generation of a lightweight solar panel according to a preferred embodiment of the present invention.

第4A圖:本發明較佳實施例之輕量型太陽能板發電異常測試方法選擇於第一發電曲線區間選擇第一參考點執行測試作業之示意圖。 Fig. 4A: A schematic diagram of the light-weight solar panel power generation abnormality test method of the preferred embodiment of the present invention selecting the first reference point to perform the test operation in the first power generation curve section.

第5圖:本發明另一較佳實施例之輕量型太陽能板發電異常測試方法之流程示意圖。 Figure 5: A schematic flow diagram of a method for testing abnormal power generation of a lightweight solar panel according to another preferred embodiment of the present invention.

第5A圖:本發明另一較佳實施例之輕量型太陽能板發電異常測試方法選擇於第二發電曲線區間選擇第二參考點執行測試作業之示意圖。 Fig. 5A: A schematic diagram of a light-weight solar panel power generation abnormality test method according to another preferred embodiment of the present invention selecting a second reference point in the second power generation curve section to perform the test operation.

第6圖:本發明第二較佳實施例之輕量型太陽能板發電異常測試系統之架構示意圖。 Fig. 6: A schematic diagram of the structure of the light-weight solar panel power generation abnormality test system according to the second preferred embodiment of the present invention.

第7圖:本發明第三較佳實施例之輕量型太陽能板發電異常測試系統之架構示意圖。 Fig. 7: A schematic diagram of the structure of the light-weight solar panel power generation abnormality test system according to the third preferred embodiment of the present invention.

為了充分瞭解本發明,於下文將舉例較佳實施例並配合所附圖式作詳細說明,且其並非用以限定本發明。 In order to fully understand the present invention, preferred embodiments are exemplified below and described in detail with the accompanying drawings, and they are not intended to limit the present invention.

本發明較佳實施例之資料輕量型或資料簡化型太陽能板發電異常〔發電特性異常〕測試方法及其系統適用於各種太陽能電池模組型式,其包含基板式太陽能電池或薄膜式太陽能電池,且其亦適用於各種太陽能電池模組材料,其包含單晶矽〔monocrystalline silicon〕太陽能電池、多晶矽〔polycrystalline silicon〕太陽能電池或非晶矽〔amorphous silicon〕太陽能電池,但其並非用以限定本發明之範圍。 The light-weight data or data-simplified solar panel power generation abnormality (abnormal power generation characteristics) test method and system of the preferred embodiment of the present invention are applicable to various types of solar cell modules, including substrate solar cells or thin-film solar cells, And it is also applicable to various solar cell module materials, including monocrystalline silicon (monocrystalline silicon) solar cells, polycrystalline silicon (polycrystalline silicon) solar cells or amorphous silicon (amorphous silicon) solar cells, but it is not intended to limit the present invention The scope.

舉例而言,本發明較佳實施例之資料輕量型或資料簡化型太陽能板發電異常測試方法及其系統採用〝輕量型〞、〝資料輕量型〞、〝簡化型〞或〝資料簡化型〞技術名詞,其定義為太陽能板發電異常測試資料之傳輸通訊量達成輕量化、減少或簡化之目的,但其並非用以限定本發明之範圍。 For example, the data-light or data-simplified solar panel power generation abnormality test method and system of the preferred embodiment of the present invention adopts "light-weight", "data-light-weight", "simplified" or "data-simplified" The technical term "type" is defined as the purpose of lightening, reducing or simplifying the transmission communication volume of abnormal solar panel power generation test data, but it is not used to limit the scope of the present invention.

舉例而言,本發明較佳實施例之資料輕量型或資料簡化型太陽能板發電異常測試方法及其系統採用〝發電曲線異常特性〞技術名詞,其定義為包含曲線階梯〔step〕或凹陷〔notch〕特性、低電流〔low current〕特性、低電壓〔low voltage〕特性、曲膝〔rounder knee〕特 性、垂直區淺斜率〔shallower slope in vertical leg〕特性、水平區深斜率〔steeper slope in horizontal leg〕特性或其它各種發電異常特性,但其並非用以限定本發明之範圍。 For example, the data-lightweight or data-simplified solar panel power generation abnormality test method and system of the preferred embodiment of the present invention adopts the technical term "power generation curve abnormal characteristics", which is defined as including curve steps (steps) or depressions. notch] characteristics, low current characteristics, low voltage characteristics, rounder knee characteristics Characteristics, shallower slope in vertical leg characteristics, steeper slope in horizontal leg characteristics, or other abnormal power generation characteristics, but they are not intended to limit the scope of the present invention.

舉例而言,本發明較佳實施例之資料輕量型或資料簡化型太陽能板發電異常測試方法及其系統採用〝發電特性〞技術名詞,其定義為包含填充因數特性〔最大輸出功率與短路電流和開路電壓之積的比值〕、電流比率特性、電壓比率特性或其它各種太陽能板發電特性或其任意組合,以便進行一系列比對,但其並非用以限定本發明之範圍。 For example, the data-lightweight or data-simplified solar panel power generation abnormality test method and system of the preferred embodiment of the present invention adopts the technical term "power generation characteristics", which is defined as including fill factor characteristics (maximum output power and short-circuit current) The ratio of the product to the open circuit voltage], current ratio characteristics, voltage ratio characteristics, or other various solar panel power generation characteristics or any combination thereof for a series of comparisons, but they are not intended to limit the scope of the present invention.

第1圖揭示本發明較佳實施例採用太陽能電池模組之架構示意圖。請參照第1圖所示,一太陽能電池模組1包含數個子模組〔串接體〕10及數個旁路〔bypass〕二極體12,而每個該子模組10包含數個太陽能電池單元〔solar cell〕11,且該數個太陽能電池單元11形成串接。該數個太陽能電池模組1之子模組10並聯連接一個或數個該旁路二極體12。 FIG. 1 shows a schematic diagram of the structure of a solar cell module used in a preferred embodiment of the present invention. Please refer to Figure 1, a solar cell module 1 includes a number of sub-modules [serial connection body] 10 and a number of bypass [bypass] diodes 12, and each sub-module 10 includes a number of solar energy Solar cell 11, and the solar battery cells 11 are connected in series. The sub-modules 10 of the plurality of solar cell modules 1 are connected to one or more of the bypass diodes 12 in parallel.

請再參照第1圖所示,舉例而言,在環境溫度固定及無遮蔽情況下,且在該太陽能電池模組1可正常發電時,依不同的太陽照度該太陽能電池模組1可產生不同的輸出電壓-電流曲線〔V-I curve〕,如此其輸出可產生不同的電壓-功率曲線〔V-P curve〕。同樣的,在太陽照度固定及無遮蔽情況下,且在該太陽能電池模組1可正常發電時,依不同的環境溫度該太陽能電池模組1亦可產生不同的輸出電壓-電流曲線,如此其亦輸出可產生不同的電壓-功率曲線。 Please refer to Figure 1 again. For example, when the ambient temperature is fixed and there is no shade, and when the solar cell module 1 can generate electricity normally, the solar cell module 1 can produce different solar illuminances according to different solar illuminances. The output voltage-current curve [VI curve], so its output can produce different voltage-power curves [VP curve]. Similarly, under the condition of fixed solar illuminance and no shade, and when the solar cell module 1 can generate power normally, the solar cell module 1 can also generate different output voltage-current curves according to different ambient temperatures. Also output can generate different voltage-power curves.

請再參照第1圖所示,該太陽能電池模組1電性連接於一電能轉換器〔例如:全橋式電能轉換器〕2,並將一測試單元2a〔或測試系統〕選擇配置連接於該電能轉 換器2,如第1圖之左下方所示,且該電能轉換器2為一逆變器〔PV inverter〕或一微逆變器,以便將該太陽能電池模組1產生的電能進行轉換輸出。舉例而言,在該電能轉換器2運轉時,通常依太陽照度的變化適當執行最大功率追蹤〔MPPT〕作業。如此,在不同太陽照度下選擇控制該太陽能電池模組1之輸出電壓或輸出電流,以達成控制在其最大功率運轉點。 Please refer to Figure 1 again, the solar cell module 1 is electrically connected to a power converter (for example: a full-bridge power converter) 2, and a test unit 2a [or test system] is selectively connected to The electrical energy turns Inverter 2, as shown in the bottom left of Figure 1, and the power converter 2 is an inverter [PV inverter] or a micro-inverter to convert and output the electrical energy generated by the solar cell module 1 . For example, when the electrical energy converter 2 is operating, the maximum power tracking (MPPT) operation is usually performed appropriately according to the change of solar illuminance. In this way, the output voltage or output current of the solar cell module 1 is selectively controlled under different solar illuminances to achieve control at its maximum power operating point.

請再參照第1圖所示,本發明另一較佳實施例將該測試單元2a〔或測試系統〕選擇配置連接於一近端裝置〔或後端測試系統〕,且該近端裝置連接通訊於該電能轉換器2。或,本發明另一較佳實施例將該測試單元2a〔或測試系統〕選擇配置連接於一遠端裝置〔或遠端測試系統〕,且該遠端裝置連接通訊於該電能轉換器2。 Please refer to Figure 1 again, another preferred embodiment of the present invention selects and configures the test unit 2a (or test system) to be connected to a near-end device (or back-end test system), and the near-end device is connected to communication于此electric power converter2. Or, in another preferred embodiment of the present invention, the test unit 2a (or test system) is selectively configured to be connected to a remote device (or remote test system), and the remote device is connected to the power converter 2 for communication.

第2圖揭示本發明第一較佳實施例之輕量型太陽能板發電異常測試系統之架構示意圖。請參照第1及2圖所示,本發明第一較佳實施例之輕量型太陽能板發電異常測試系統包含一測試系統3電性連接於數個逆變器20〔如第1圖之電能轉換器2〕,以便經由數個該逆變器20進行控制測試數個該太陽能電池模組1之發電。此時,該逆變器20或電能轉換器2預先停止執行最大功率追蹤作業一預定時間。該太陽能電池模組1為單一個太陽能電池模組、一串太陽能電池模組或數串太陽能電池模組,而該電能轉換器2為一串接模組之逆變器、一微逆變器或具類似逆變器功能之設備。 FIG. 2 shows a schematic diagram of the structure of the light-weight solar panel power generation abnormality test system according to the first preferred embodiment of the present invention. Please refer to Figures 1 and 2, the light-weight solar panel power generation abnormality test system according to the first preferred embodiment of the present invention includes a test system 3 electrically connected to several inverters 20 (such as the electrical energy in Figure 1 The converter 2] is used to control and test the power generation of the solar cell modules 1 through the inverters 20. At this time, the inverter 20 or the electric energy converter 2 stops performing the maximum power tracking operation in advance for a predetermined time. The solar battery module 1 is a single solar battery module, a string of solar battery modules or several strings of solar battery modules, and the power converter 2 is an inverter connected to a series of modules, and a micro inverter Or equipment with functions similar to inverters.

請再參照第2圖所示,數個該太陽能電池模組1經由數個該逆變器20連接至一市電系統,如第2圖之右側所示。在經由數個該逆變器20進行控制測試數個該太陽能電池模組1時,數個該太陽能電池模組1之測試發電仍回收輸出至該市電系統,以提升其發電使用率。本發明另 一較佳實施例之輕量型太陽能板發電異常測試系統之該測試系統3選擇併入一體設置於該逆變器20上,即該逆變器20具有一發電異常測試功能及其它功能〔例如:最大功率追蹤功能〕,以提供多重操作功能。 Please refer to FIG. 2 again, a plurality of the solar cell modules 1 are connected to a mains power system via a plurality of the inverters 20, as shown on the right side of the second diagram. When a plurality of the solar cell modules 1 are controlled and tested through the plurality of the inverters 20, the test power generation of the plurality of the solar cell modules 1 is still recycled and output to the utility power system to increase its power generation utilization rate. The present invention also The test system 3 of the light-weight solar panel power generation abnormality test system of a preferred embodiment is selected and integrated on the inverter 20, that is, the inverter 20 has a power generation abnormality test function and other functions (for example, : Maximum power tracking function] to provide multiple operation functions.

請再參照第2圖所示,本發明另一較佳實施例之輕量型太陽能板發電異常測試系統之該測試系統3選擇分離設置於該逆變器20,而單一個該測試系統3分離設置於一測試裝置〔例如:近端裝置〕,且該測試裝置包含一操作面板30,以便供現場人員操作設定該測試系統3。本發明另一較佳實施例之輕量型太陽能板發電異常測試系統之該測試系統3連接單一個或數個該逆變器20,且可利用該操作面板30進行操作設定該測試系統3。 Please refer to FIG. 2 again, the test system 3 of the light-weight solar panel power generation abnormality test system of another preferred embodiment of the present invention is selectively installed in the inverter 20, and the test system 3 is separated. It is installed in a test device (for example, a near-end device), and the test device includes an operation panel 30 for field personnel to operate and set the test system 3. The test system 3 of the light-weight solar panel power generation abnormality test system of another preferred embodiment of the present invention is connected to a single or several inverters 20, and the test system 3 can be operated and set by the operation panel 30.

第3圖揭示本發明較佳實施例採用太陽能電池模組發生各種發電異常狀態之曲線示意圖。請參照第3圖所示,太陽能電池模組發生各種發電異常狀態包含:A、曲線階梯或凹陷〔第3圖之中間彎曲虛線所示〕;B、低電流〔第3圖之左上方虛線箭頭所示〕;C、低電壓〔第3圖之右下方虛線箭頭所示〕;D、曲膝〔第3圖之右上方虛線所示〕;E、垂直區淺斜率〔第3圖之右方虛線所示〕;F、水平區深斜率〔第3圖之上方虛線所示〕。 Fig. 3 shows a schematic diagram of various power generation abnormalities occurring in a solar cell module according to a preferred embodiment of the present invention. Please refer to Figure 3, the various abnormal power generation states of the solar cell module include: A, curved steps or depressions (shown by the curved dotted line in the middle of Figure 3); B, low current (dashed arrow on the upper left of Figure 3) Shown]; C, low voltage (shown by the dashed arrow at the bottom right of Figure 3); D, bent knees (shown by the dashed line on the upper right of Figure 3); E, shallow slope of the vertical zone [right of Figure 3 Shown by the dashed line]; F, the deep slope of the horizontal zone [shown by the upper dashed line in Figure 3].

第4圖揭示本發明較佳實施例之輕量型太陽能板發電異常測試方法之流程示意圖。請參照第4圖所示,本發明較佳實施例之輕量型太陽能板發電異常測試方法選擇採用一發電特性曲線,其包含一電壓-功率〔V-P〕曲線或一電壓-電流〔V-I〕曲線,且電壓-功率〔V-P〕曲線或電壓-電流〔V-I〕曲線具有一最大功率點〔MPP,maximum power point〕。 FIG. 4 shows a schematic flow diagram of a method for testing abnormal power generation of a lightweight solar panel according to a preferred embodiment of the present invention. Please refer to Figure 4, the light-weight solar panel power generation abnormality test method of the preferred embodiment of the present invention selects a power generation characteristic curve, which includes a voltage-power [VP] curve or a voltage-current [VI] curve , And the voltage-power [VP] curve or the voltage-current [VI] curve has a maximum power point [MPP, maximum power point].

第4A圖揭示本發明較佳實施例之輕量型太陽能板發電異常測試方法選擇於第一發電曲線區間選擇第一 參考點執行測試作業之示意圖,其對應於第4圖之輕量型太陽能板發電異常測試方法。請參照第4A圖所示,本發明較佳實施例之輕量型太陽能板發電異常測試方法選擇執行於一第一發電曲線區間,且該第一發電曲線區間具有一短路電流點Isc,如第4A圖之左側所示。 Figure 4A shows that the light-weight solar panel power generation abnormality test method of the preferred embodiment of the present invention is selected in the first power generation curve interval, and the first is selected. A schematic diagram of the test operation performed at the reference point, which corresponds to the light-weight solar panel power generation abnormality test method in Figure 4. Please refer to Figure 4A, the light-weight solar panel power generation abnormality test method of the preferred embodiment of the present invention is selected to be executed in a first power generation curve section, and the first power generation curve section has a short-circuit current point Isc, such as As shown on the left side of Figure 4A.

請參照第1、2、3、4及4A圖所示,本發明較佳實施例之輕量型太陽能板發電異常測試方法包含步驟S1:舉例而言,首先,利用該電能轉換器2或逆變器20控制該太陽能電池模組1,並將該太陽能電池模組1操作於該第一發電曲線區間,如第4A圖之左側所示。 Please refer to Figures 1, 2, 3, 4, and 4A. The light-weight solar panel power generation abnormality test method of the preferred embodiment of the present invention includes step S1: For example, first, use the power converter 2 or reverse The inverter 20 controls the solar cell module 1 and operates the solar cell module 1 in the first power generation curve section, as shown on the left side of FIG. 4A.

請再參照第1、2、3、4及4A圖所示,本發明較佳實施例之輕量型太陽能板發電異常測試方法包含步驟S2:舉例而言,接著,利用該電能轉換器2或逆變器20控制該太陽能電池模組1而分別操作於一第一近最大功率點及一近短路電流點。 Please refer to Figures 1, 2, 3, 4, and 4A again. The light-weight solar panel power generation abnormality test method of the preferred embodiment of the present invention includes step S2: For example, then, using the power converter 2 or The inverter 20 controls the solar cell module 1 to operate at a first near maximum power point and a near short-circuit current point, respectively.

請再參照第1、2、3、4及4A圖所示,本發明較佳實施例之輕量型太陽能板發電異常測試方法包含步驟S3:舉例而言,接著,以適當技術手段〔例如:自動或手動方式〕於該第一近最大功率點〔或最大功率點〕及近短路電流點〔或短路電流點〕之間選擇至少一第一參考點,且於該第一參考點量測至少一第一參考點電壓V(a)及至少一第一參考點電流I(a),如第4A圖之左側及中間位置所示。 Please refer to Figures 1, 2, 3, 4 and 4A again. The light-weight solar panel power generation abnormality test method of the preferred embodiment of the present invention includes step S3: For example, then, appropriate technical means are used (for example: Automatic or manual mode] Select at least one first reference point between the first near maximum power point (or maximum power point) and near short-circuit current point (or short-circuit current point), and measure at least at the first reference point A first reference point voltage V(a) and at least one first reference point current I(a) are shown in the left and middle positions of Fig. 4A.

請再參照第1、2、3、4及4A圖所示,本發明較佳實施例之輕量型太陽能板發電異常測試方法包含步驟S4:舉例而言,接著,以適當技術手段於該測試單元2a或測試系統3利用該第一參考點電壓V(a)及第一參考點電流I(a)計算至少一第一參考點功率P(a),如第4A圖之左側及中間位置所示。 Please refer to Figures 1, 2, 3, 4, and 4A again. The method for testing abnormal light-weight solar panel power generation according to a preferred embodiment of the present invention includes step S4: For example, then, appropriate technical means are used for the test The unit 2a or the test system 3 uses the first reference point voltage V(a) and the first reference point current I(a) to calculate at least one first reference point power P(a), as shown in the left and middle positions of Fig. 4A Show.

請再參照第1、2、3、4及4A圖所示,本發明 較佳實施例之輕量型太陽能板發電異常測試方法包含步驟S5:舉例而言,接著,以適當技術手段於該測試單元2a或測試系統3〔或後端測試系統、雲端測試系統或其它測試系統〕利用該第一參考點功率P(a)與一第一發電曲線異常特性〔如第3圖所示〕進行比對是否異常,以達成減少發電異常測試資料處理數量及大幅減少發電異常測試傳輸通訊資料數量。 Please refer to Figures 1, 2, 3, 4 and 4A again, the present invention The light-weight solar panel power generation abnormality test method of the preferred embodiment includes step S5: For example, then, the test unit 2a or the test system 3 (or back-end test system, cloud test system or other test) is performed by appropriate technical means. The system] uses the first reference point power P(a) and a first power generation curve abnormal characteristic (as shown in Figure 3) to compare whether it is abnormal, so as to reduce the amount of abnormal power generation test data processing and greatly reduce the abnormal power generation test The number of communication data to be transmitted.

請再參照第1、2、4及4A圖所示,舉例而言,本發明較佳實施例之輕量型太陽能板發電異常測試方法於該測試單元2a或測試系統3另選擇執行該第一近最大功率點或第一最大功率點用以計算一填充因數特性〔最大輸出功率與短路電流和開路電壓之積的比值〕;或,該近短路電流點或短路電流點與第一近最大功率點或第一最大功率點之電流用以計算一電流比率特性,以便於近端或遠端與一標準值進行比對,以判斷該太陽能電池模組1是否發電異常。 Please refer to Figures 1, 2, 4, and 4A again. For example, the light-weight solar panel power generation abnormality test method of the preferred embodiment of the present invention may alternatively execute the first test method in the test unit 2a or the test system 3 The near maximum power point or the first maximum power point is used to calculate a fill factor characteristic (the ratio of the maximum output power to the product of the short-circuit current and the open-circuit voltage); or, the short-circuit current point or the short-circuit current point and the first near-maximum power The current at the first point or the first maximum power point is used to calculate a current ratio characteristic, so that the near end or the far end can be compared with a standard value to determine whether the solar cell module 1 is generating abnormally.

請再參照第1、2、3、4及4A圖所示,本發明較佳實施例之輕量型太陽能板發電異常測試方法於近端之該測試單元2a或測試系統3初步以簡化型判斷方式判斷發電異常〔如第3圖所示〕後,在後續上另結合執行一遠端太陽能板發電異常進階測試方法及其系統〔如第7圖所示〕或類似發電異常測試方法及其系統,例如:太陽能板發電特性曲線之多點檢測掃描,以確實判斷該太陽能電池模組1是否發電異常。 Please refer to Figures 1, 2, 3, 4, and 4A again. The test method for abnormal light-weight solar panel power generation according to the preferred embodiment of the present invention is based on the test unit 2a or the test system 3 at the proximal end to make preliminary judgments After judging the abnormal power generation (as shown in Figure 3), it is combined to execute a remote solar panel power generation abnormality advanced test method and its system (as shown in Figure 7) or similar power generation abnormality test methods and methods. The system, for example: multi-point detection and scanning of the solar panel power generation characteristic curve, to determine whether the solar cell module 1 is abnormal in power generation.

第5圖揭示本發明另一較佳實施例之輕量型太陽能板發電異常測試方法之流程示意圖。第5A圖揭示本發明另一較佳實施例之輕量型太陽能板發電異常測試方法選擇於第二發電曲線區間選擇第二參考點執行測試作業之示意圖,其對應於第5圖之簡化型太陽能板發電異常測試 方法。請參照第5A圖所示,本發明另一較佳實施例之輕量型太陽能板發電異常測試方法選擇執行於一第二發電曲線區間,且該第二發電曲線區間具有一開路電壓點Voc,如第5A圖之右側所示。 FIG. 5 shows a schematic flow diagram of a method for testing abnormal power generation of a lightweight solar panel according to another preferred embodiment of the present invention. Fig. 5A shows a schematic diagram of a light-weight solar panel power generation abnormality test method according to another preferred embodiment of the present invention. The second reference point is selected in the second power generation curve section to perform the test operation, which corresponds to the simplified solar panel in Fig. 5 Abnormal power generation test method. Please refer to FIG. 5A, the light-weight solar panel power generation abnormality test method of another preferred embodiment of the present invention is selected to be executed in a second power generation curve section, and the second power generation curve section has an open circuit voltage point Voc. As shown on the right side of Figure 5A.

請參照第1、2、3、5及5A圖所示,本發明另一較佳實施例之輕量型太陽能板發電異常測試方法包含步驟S1A:舉例而言,首先,利用該電能轉換器2或逆變器20控制該太陽能電池模組1,並將該太陽能電池模組1操作於該第二發電曲線區間,如第5A圖之右側所示。 Please refer to Figures 1, 2, 3, 5, and 5A. Another preferred embodiment of the present invention is a method for testing abnormal power generation of a lightweight solar panel including step S1A: For example, first, use the power converter 2 Or the inverter 20 controls the solar cell module 1 and operates the solar cell module 1 in the second power generation curve section, as shown on the right side of FIG. 5A.

請再參照第1、2、3、5及5A圖所示,本發明另一較佳實施例之輕量型太陽能板發電異常測試方法包含步驟S2A:舉例而言,接著,利用該電能轉換器2或逆變器20控制該太陽能電池模組1而分別操作於一第二近最大功率點及一近開路電壓點。 Please refer to Figures 1, 2, 3, 5, and 5A. Another preferred embodiment of the present invention is to test the abnormal power generation of a lightweight solar panel. The method includes step S2A: For example, then, the power converter is used 2 or the inverter 20 controls the solar cell module 1 to operate at a second near maximum power point and a near open circuit voltage point, respectively.

請再參照第1、2、3、5及5A圖所示,本發明另一較佳實施例之輕量型太陽能板發電異常測試方法包含步驟S3A:舉例而言,接著,以適當技術手段〔例如:自動或手動方式〕於該第二近最大功率點〔或最大功率點〕及近開路電壓點〔或開路電壓點〕之間選擇至少一第二參考點,且於該第二參考點量測至少一第二參考點電壓V(b)及至少一第二參考點電流I(b),如第5A圖之右側所示。 Please refer to Figures 1, 2, 3, 5 and 5A again. Another preferred embodiment of the present invention is a method for testing abnormality of light-weight solar panel power generation including step S3A: For example, then, by appropriate technical means [ For example: automatic or manual mode) select at least one second reference point between the second near maximum power point (or maximum power point) and near open circuit voltage point (or open circuit voltage point), and measure at the second reference point Measure at least one second reference point voltage V(b) and at least one second reference point current I(b), as shown on the right side of Figure 5A.

請再參照第1、2、3、5及5A圖所示,本發明另一較佳實施例之輕量型太陽能板發電異常測試方法包含步驟S4A:舉例而言,接著,以適當技術手段於該測試單元2a或測試系統3利用該第二參考點電壓V(b)及第二參考點電流I(b)計算至少一第二參考點功率P(b),如第5A圖之右側所示。 Please refer to Figures 1, 2, 3, 5, and 5A again. Another preferred embodiment of the present invention is a method for testing abnormality of light-weight solar panel power generation including step S4A: For example, then, using appropriate technical means The test unit 2a or the test system 3 uses the second reference point voltage V(b) and the second reference point current I(b) to calculate at least one second reference point power P(b), as shown on the right side of Figure 5A .

請再參照第1、2、3、5及5A圖所示,本發明另一較佳實施例之輕量型太陽能板發電異常測試方法包含 步驟S5A:舉例而言,接著,以適當技術手段於該測試單元2a或測試系統3〔或後端測試系統、雲端測試系統或其它測試系統〕利用該第二參考點功率P(b)與一第二發電曲線異常特性〔如第3圖所示〕進行比對是否異常,以達成減少發電異常測試資料處理數量及大幅減少發電異常測試傳輸通訊資料數量。 Please refer to Figures 1, 2, 3, 5, and 5A again. Another preferred embodiment of the present invention is a method for testing abnormality of light-weight solar panel power generation. Step S5A: For example, then, the test unit 2a or the test system 3 (or back-end test system, cloud test system, or other test system) is used by appropriate technical means to use the second reference point power P(b) and a The abnormal characteristics of the second power generation curve (as shown in Figure 3) are compared for abnormality, so as to reduce the amount of abnormal power generation test data processing and greatly reduce the amount of communication data transmitted during abnormal power generation test.

請再參照第1、2、5及5A圖所示,舉例而言,本發明另一較佳實施例之輕量型太陽能板發電異常測試方法於該測試單元2a或測試系統3〔或後端測試系統、雲端測試系統或其它測試系統〕另選擇執行該第二近最大功率點或第二最大功率點用以計算一填充因數特性〔最大輸出功率與短路電流和開路電壓之積的比值〕;或,該近開路電壓點或開路電壓點與第二近最大功率點或第二最大功率點之電流用以計算一電壓比率特性,以便於近端或遠端與一標準值進行比對,以判斷該太陽能電池模組1是否發電異常。 Please refer to Figures 1, 2, 5, and 5A again. For example, the light-weight solar panel power generation abnormality test method of another preferred embodiment of the present invention is used in the test unit 2a or the test system 3 [or back-end Test system, cloud test system, or other test system] Optionally execute the second near maximum power point or the second maximum power point to calculate a fill factor characteristic (the ratio of the maximum output power to the product of the short-circuit current and the open-circuit voltage); Or, the current between the near open circuit voltage point or the open circuit voltage point and the second near maximum power point or the second maximum power point is used to calculate a voltage ratio characteristic, so that the near end or the far end can be compared with a standard value to It is determined whether the solar cell module 1 has abnormal power generation.

請再參照第4A及5A圖所示,本發明另一較佳實施例之輕量型太陽能板發電異常測試方法選擇執行於該第一發電曲線區間〔如第4A圖所示〕及第二發電曲線區間〔如第5A圖所示〕,或同時或同步選擇執行於該第一發電曲線區間及第二發電曲線區間。 Please refer to Figures 4A and 5A again, the light-weight solar panel power generation abnormality test method of another preferred embodiment of the present invention is selected to be executed in the first power generation curve interval (as shown in Figure 4A) and the second power generation The curve interval (as shown in Fig. 5A), or simultaneously or simultaneously can be selected and executed in the first power generation curve interval and the second power generation curve interval.

第6圖揭示本發明第二較佳實施例之輕量型太陽能板發電異常測試系統之架構示意圖。請參照第6圖所示,本發明第二較佳實施例之該測試系統3〔例如:近端測試系統或遠端測試系統或其它測試系統〕電性連接於該逆變器20,且該太陽能電池模組1及逆變器20之間設置一直流-直流升壓式電能轉換器21。 FIG. 6 shows a schematic diagram of the structure of the light-weight solar panel power generation abnormality test system according to the second preferred embodiment of the present invention. Please refer to Figure 6, the test system 3 of the second preferred embodiment of the present invention (for example: a near-end test system or a remote test system or other test system) is electrically connected to the inverter 20, and the A DC-DC boost type electric energy converter 21 is arranged between the solar cell module 1 and the inverter 20.

第7圖揭示本發明第三較佳實施例之輕量型太陽能板發電異常測試系統之架構示意圖。請參照第7圖所 示,本發明第三較佳實施例之該測試系統3另連接至一雲端伺服器4或一遠端監控系統,以便該雲端伺服器4或遠端監控系統自動判別該太陽能電池模組1是否發電異常。該雲端伺服器4或遠端監控系統包含一遠端測試系統40,且該逆變器20另連接一傳輸模組22或一無線傳輸模組,以便該遠端測試系統40以有線或無線方式連接操作該逆變器20,以執行數個該太陽能電池模組1之發電異常測試作業或發電異常進階〔整個發電曲線特性〕測試作業。 FIG. 7 shows a schematic diagram of the structure of the light-weight solar panel power generation abnormality test system according to the third preferred embodiment of the present invention. Please refer to Figure 7 As shown, the test system 3 of the third preferred embodiment of the present invention is further connected to a cloud server 4 or a remote monitoring system, so that the cloud server 4 or remote monitoring system can automatically determine whether the solar cell module 1 is Abnormal power generation. The cloud server 4 or remote monitoring system includes a remote testing system 40, and the inverter 20 is also connected to a transmission module 22 or a wireless transmission module, so that the remote testing system 40 can be wired or wirelessly The inverter 20 is connected and operated to perform a number of abnormal power generation test operations or advanced generation abnormality (entire power generation curve characteristics) test operations of the solar cell module 1.

請再參照第7圖所示,本發明另一較佳實施例之該測試系統3可選擇結合於該傳輸模組22,以形成一近端測試單元或一近端測試系統,並可直接進行發電異常初步〔簡化型〕測試作業,且該近端測試單元或近端測試系統另連接至該雲端伺服器4或遠端監控系統,以便該雲端伺服器4、遠端測試系統40或遠端監控系統自動判別該太陽能電池模組1執行是否發電異常之發電異常進階測試作業。 Please refer to Figure 7 again, the test system 3 of another preferred embodiment of the present invention can be optionally combined with the transmission module 22 to form a near-end test unit or a near-end test system, which can be directly performed Initial [simplified] test operation for abnormal power generation, and the near-end test unit or near-end test system is additionally connected to the cloud server 4 or remote monitoring system, so that the cloud server 4, the remote test system 40 or the remote The monitoring system automatically judges whether the solar cell module 1 performs the advanced test operation of abnormal power generation.

前述較佳實施例僅舉例說明本發明及其技術特徵,該實施例之技術仍可適當進行各種實質等效修飾及/或替換方式予以實施;因此,本發明之權利範圍須視後附申請專利範圍所界定之範圍為準。本案著作權限制使用於中華民國專利申請用途。 The foregoing preferred embodiments only illustrate the present invention and its technical features. The technology of this embodiment can still be implemented with various substantially equivalent modifications and/or alternatives; therefore, the scope of rights of the present invention shall be subject to a patent application. The scope defined by the scope shall prevail. The copyright in this case is restricted to the use of patent applications in the Republic of China.

1‧‧‧太陽能電池模組 1‧‧‧Solar battery module

20‧‧‧逆變器 20‧‧‧Inverter

3‧‧‧測試系統 3‧‧‧Test System

30‧‧‧操作面板 30‧‧‧Operation Panel

Claims (28)

一種輕量型太陽能板發電異常測試方法,其包含:利用一電能轉換器控制一太陽能電池模組,並將該太陽能電池模組操作於一第一發電曲線區間;利用該電能轉換器控制該太陽能電池模組而分別操作於一第一近最大功率點及一近短路電流點;於該第一近最大功率點及近短路電流點之間選擇至少一第一參考點,且於該第一參考點量測至少一第一參考點電壓及至少一第一參考點電流;利用該第一參考點電壓及第一參考點電流計算至少一第一參考點功率;及利用該第一參考點功率與一第一發電曲線異常特性進行比對是否異常。 A light-weight solar panel power generation abnormality test method, which includes: using a power converter to control a solar cell module, and operating the solar cell module in a first power generation curve section; using the power converter to control the solar cell The battery module is operated at a first near maximum power point and a near short-circuit current point respectively; at least one first reference point is selected between the first near maximum power point and the near short-circuit current point, and the first reference point Measure at least one first reference point voltage and at least one first reference point current; use the first reference point voltage and the first reference point current to calculate at least one first reference point power; and use the first reference point power and The abnormal characteristic of the first power generation curve is compared to see if it is abnormal. 依申請專利範圍第1項所述之輕量型太陽能板發電異常測試方法,其中該第一近最大功率點包含一第一最大功率點。 According to the light-weight solar panel power generation abnormality test method described in item 1 of the scope of patent application, the first near maximum power point includes a first maximum power point. 依申請專利範圍第2項所述之輕量型太陽能板發電異常測試方法,其中該第一近最大功率點或第一最大功率點用以計算一填充因數特性。 According to the light-weight solar panel power generation abnormality test method described in item 2 of the scope of patent application, the first near maximum power point or the first maximum power point is used to calculate a fill factor characteristic. 依申請專利範圍第1項所述之輕量型太陽能板發電異常測試方法,其中該近短路電流點包含一短路電流點。 According to the light-weight solar panel power generation abnormality test method described in item 1 of the scope of patent application, the near-short-circuit current point includes a short-circuit current point. 依申請專利範圍第1項所述之輕量型太陽能板發電異常測試方法,其中該近短路電流點或一短路電流點與第一近最大功率點或一第一最大功率點之電流用以計算一電流比率特性。 According to the light-weight solar panel power generation abnormality test method described in item 1 of the scope of patent application, the current between the near short-circuit current point or a short-circuit current point and the first near maximum power point or the first maximum power point is used for calculation A current ratio characteristic. 依申請專利範圍第1項所述之輕量型太陽能板發電異常測試方法,其中該第一參考點位於一第一最大功率點及一短路電流點之間。 According to the light-weight solar panel power generation abnormality test method described in item 1 of the scope of patent application, the first reference point is located between a first maximum power point and a short-circuit current point. 依申請專利範圍第1項所述之輕量型太陽能板發電異常測試方法,其中將一測試單元選擇配置連接於該電能轉 換器,或將該測試單元選擇配置連接於一近端裝置或一遠端裝置,且該近端裝置或遠端裝置連接通訊於該電能轉換器。 According to the light-weight solar panel power generation abnormality test method described in item 1 of the scope of patent application, a test unit is selectively configured and connected to the power conversion Converter, or select and configure the test unit to be connected to a near-end device or a remote device, and the near-end device or remote device is connected to communicate with the power converter. 依申請專利範圍第7項所述之輕量型太陽能板發電異常測試方法,其中該近端裝置或遠端裝置用以執行一發電異常進階測試作業。 According to the light-weight solar panel power generation abnormality test method described in item 7 of the scope of patent application, the near-end device or the remote device is used to perform an advanced power generation abnormality test operation. 一種輕量型太陽能板發電異常測試方法,其包含:利用一電能轉換器控制一太陽能電池模組,並將該太陽能電池模組操作於一第二發電曲線區間;利用該電能轉換器控制該太陽能電池模組而分別操作於一第二近最大功率點及一近開路電壓點;於該第二近最大功率點及近開路電壓點之間選擇至少一第二參考點,且於該第二參考點量測至少一第二參考點電壓及至少一第二參考點電流;利用該第二參考點電壓及第二參考點電流計算至少一第二參考點功率;及利用該第二參考點功率與一第二發電曲線異常特性進行比對是否異常。 A light-weight solar panel power generation abnormality test method, which includes: using an electrical energy converter to control a solar cell module, and operating the solar cell module in a second power generation curve section; using the electrical energy converter to control the solar energy The battery module is operated at a second near maximum power point and a near open circuit voltage point; at least one second reference point is selected between the second near maximum power point and near open circuit voltage point, and the second reference point Measure at least one second reference point voltage and at least one second reference point current; use the second reference point voltage and the second reference point current to calculate at least one second reference point power; and use the second reference point power and 1. The abnormal characteristics of the second power generation curve are compared to see if they are abnormal. 依申請專利範圍第9項所述之輕量型太陽能板發電異常測試方法,其中該第二近最大功率點包含一第二最大功率點。 According to the light-weight solar panel power generation abnormality test method described in item 9 of the scope of patent application, the second near maximum power point includes a second maximum power point. 依申請專利範圍第10項所述之輕量型太陽能板發電異常測試方法,其中該第二近最大功率點或第二最大功率點用以計算一填充因數特性。 According to the light-weight solar panel power generation abnormality test method described in item 10 of the scope of patent application, the second near maximum power point or the second maximum power point is used to calculate a fill factor characteristic. 依申請專利範圍第9項所述之輕量型太陽能板發電異常測試方法,其中該近開路電壓點包含一開路電壓點。 According to the light-weight solar panel power generation abnormality test method described in item 9 of the scope of patent application, the near-open-circuit voltage point includes an open-circuit voltage point. 依申請專利範圍第9項所述之輕量型太陽能板發電異常測試方法,其中該近開路電壓點或一開路電壓與第二近最大功率點或一第二最大功率點之電壓用以計算一電壓比率特性。 According to the light-weight solar panel power generation abnormality test method described in item 9 of the scope of patent application, the voltage of the near open circuit voltage point or an open circuit voltage and the second near maximum power point or the voltage of the second maximum power point are used to calculate a Voltage ratio characteristics. 依申請專利範圍第9項所述之輕量型太陽能板發電異常測試方法,其中該第二參考點位於一第二最大功率點及一開路電壓點之間。 According to the light-weight solar panel power generation abnormality test method described in item 9 of the scope of patent application, the second reference point is located between a second maximum power point and an open circuit voltage point. 依申請專利範圍第9項所述之輕量型太陽能板發電異常測試方法,其中將一測試單元選擇配置連接於該電能轉換器,或將該測試單元選擇配置連接於一近端裝置或一遠端裝置,且該近端裝置或遠端裝置連接通訊於該電能轉換器。 According to the light-weight solar panel power generation abnormality test method described in item 9 of the scope of patent application, a test unit is selectively configured to be connected to the power converter, or the test unit is selectively configured to be connected to a near-end device or a remote device. End device, and the near-end device or the remote device is connected to the power converter for communication. 依申請專利範圍第15項所述之輕量型太陽能板發電異常測試方法,其中該近端裝置或遠端裝置用以執行一發電異常進階測試作業。 According to the light-weight solar panel power generation abnormality test method described in item 15 of the scope of patent application, the near-end device or the remote device is used to perform an advanced power generation abnormality test operation. 一種輕量型太陽能板發電異常測試系統,其包含:至少一太陽能電池模組,其包含數個子模組;至少一電能轉換器,其連接於該太陽能電池模組;及一測試單元,其選擇配置連接於該電能轉換器,或將該測試單元選擇配置連接於一近端裝置或一遠端裝置,且該近端裝置或遠端裝置連接通訊於該電能轉換器;其中在一第一發電曲線區間中經由該測試單元控制操作該電能轉換器,將該太陽能電池模組分別操作於一第一近最大功率點及一近短路電流點,並於該第一近最大功率點及近短路電流點之間選擇至少一第一參考點,且於該第一參考點量測至少一第一參考點電壓及至少一第一參考點電流,並利用該第一參考點電壓及第一參考點電流計算至少一第一參考點功率,且利用該第一參考點功率與一第一發電曲線異常特性進行比對是否異常;或其中在一第二發電曲線區間中經由該測試單元控制操作該電能轉換器,將該太陽能電池模組分別操作於一第二近最大功率點及一近開路電壓點,並於該第二近最大功率點及近開路電壓點之間選擇至少一第二參考點,且於該第二參考點量測至少一第二參考點電壓及至少一第二參考點 電流,並利用該第二參考點電壓及第二參考點電流計算至少一第二參考點功率,且利用該第二參考點功率與一第二階段發電異常特性進行比對是否異常。 A light-weight solar panel power generation abnormality test system, which includes: at least one solar cell module, which includes several sub-modules; at least one electric energy converter, which is connected to the solar cell module; and a test unit, which can be selected The configuration is connected to the power converter, or the test unit is selectively configured to be connected to a near-end device or a remote device, and the near-end device or the remote device is connected to the power converter; wherein a first power generation In the curve section, the power converter is controlled by the test unit to operate the solar cell module at a first near maximum power point and a near short-circuit current point, respectively, and at the first near maximum power point and near short-circuit current point. At least one first reference point is selected among points, and at least one first reference point voltage and at least one first reference point current are measured at the first reference point, and the first reference point voltage and the first reference point current are used Calculate the power of at least one first reference point, and compare the power of the first reference point with an abnormal characteristic of a first power generation curve to see if it is abnormal; or wherein the power conversion is controlled by the test unit in a second power generation curve section The solar cell module is operated at a second near maximum power point and a near open circuit voltage point respectively, and at least a second reference point is selected between the second near maximum power point and near open circuit voltage point, and Measure at least one second reference point voltage and at least one second reference point at the second reference point The second reference point voltage and the second reference point current are used to calculate at least one second reference point power, and the second reference point power is used to compare whether the second-stage power generation abnormality characteristic is abnormal. 依申請專利範圍第17項所述之輕量型太陽能板發電異常測試系統,其中該第一近最大功率點包含一第一最大功率點。 According to the light-weight solar panel power generation abnormality test system described in item 17 of the scope of patent application, the first near maximum power point includes a first maximum power point. 依申請專利範圍第18項所述之輕量型太陽能板發電異常測試系統,其中該第一近最大功率點或第一最大功率點用以計算一填充因數特性。 According to the light-weight solar panel power generation abnormality test system described in item 18 of the scope of patent application, the first near maximum power point or the first maximum power point is used to calculate a fill factor characteristic. 依申請專利範圍第17項所述之輕量型太陽能板發電異常測試系統,其中該近短路電流點包含一短路電流點。 According to the light-weight solar panel power generation abnormality test system described in item 17 of the scope of patent application, the near-short-circuit current point includes a short-circuit current point. 依申請專利範圍第17項所述之輕量型太陽能板發電異常測試系統,其中該近短路電流點或一短路電流點與第一近最大功率點或一第一最大功率點之電流用以計算一電流比率特性。 According to the light-weight solar panel power generation abnormality test system described in item 17 of the scope of patent application, the current between the near short-circuit current point or a short-circuit current point and the first near maximum power point or the first maximum power point is used for calculation A current ratio characteristic. 依申請專利範圍第17項所述之輕量型太陽能板發電異常測試系統,其中該第一參考點位於一第一最大功率點及一短路電流點之間。 According to the light-weight solar panel power generation abnormality test system described in item 17 of the scope of patent application, the first reference point is located between a first maximum power point and a short-circuit current point. 依申請專利範圍第17項所述之輕量型太陽能板發電異常測試系統,其中該第二近最大功率點包含一第二最大功率點。 According to the light-weight solar panel power generation abnormality test system described in item 17 of the scope of patent application, the second near maximum power point includes a second maximum power point. 依申請專利範圍第23項所述之輕量型太陽能板發電異常測試系統,其中該第二近最大功率點或第二最大功率點用以計算一填充因數特性。 According to the light-weight solar panel power generation abnormality test system described in item 23 of the scope of patent application, the second near maximum power point or the second maximum power point is used to calculate a fill factor characteristic. 依申請專利範圍第17項所述之輕量型太陽能板發電異常測試系統,其中該近開路電壓點包含一開路電壓點。 According to the light-weight solar panel power generation abnormality test system described in item 17 of the scope of patent application, the near-open-circuit voltage point includes an open-circuit voltage point. 依申請專利範圍第17項所述之輕量型太陽能板發電異常測試系統,其中該近開路電壓點或一開路電壓與第二近最大功率點或一第二最大功率點之電壓用以計算一電壓比率特性。 According to the light-weight solar panel power generation abnormality test system described in item 17 of the patent application, the voltage between the near open circuit voltage point or an open circuit voltage and the second near maximum power point or the second maximum power point is used to calculate a Voltage ratio characteristics. 依申請專利範圍第17項所述之輕量型太陽能板發電異常測試系統,其中該第二參考點位於一第二最大功率點及一開路電壓點之間。 According to the light-weight solar panel power generation abnormality test system described in item 17 of the scope of patent application, the second reference point is located between a second maximum power point and an open circuit voltage point. 依申請專利範圍第17項所述之輕量型太陽能板發電異常測試系統,其中該近端裝置或遠端裝置用以執行一發電異常進階測試作業。 According to the light-weight solar panel power generation abnormality test system described in item 17 of the scope of patent application, the near-end device or the remote device is used to perform an advanced power generation abnormality test operation.
TW108132308A 2019-09-06 2019-09-06 Low-duty-type power generation abnormality detection method and system for photovoltaic panels TWI718657B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW108132308A TWI718657B (en) 2019-09-06 2019-09-06 Low-duty-type power generation abnormality detection method and system for photovoltaic panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW108132308A TWI718657B (en) 2019-09-06 2019-09-06 Low-duty-type power generation abnormality detection method and system for photovoltaic panels

Publications (2)

Publication Number Publication Date
TWI718657B true TWI718657B (en) 2021-02-11
TW202112055A TW202112055A (en) 2021-03-16

Family

ID=75745845

Family Applications (1)

Application Number Title Priority Date Filing Date
TW108132308A TWI718657B (en) 2019-09-06 2019-09-06 Low-duty-type power generation abnormality detection method and system for photovoltaic panels

Country Status (1)

Country Link
TW (1) TWI718657B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW200939505A (en) * 2008-03-12 2009-09-16 Ind Tech Res Inst Method for forming optimal characteristic curves of solar cell and system thereof
US20130181736A1 (en) * 2009-11-30 2013-07-18 Atonometrics, Inc. I-v measurement system for photovoltaic modules
CN107102588A (en) * 2017-05-25 2017-08-29 哈尔滨工业大学深圳研究生院 Solar array simulator controls the realization method and system of outer shroud
CN109004903A (en) * 2018-08-14 2018-12-14 中国计量大学 Fault detection system and method suitable for photovoltaic array
CN109613841A (en) * 2018-12-05 2019-04-12 中国计量大学 A kind of solar photovoltaic assembly parameter identification method under malfunction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW200939505A (en) * 2008-03-12 2009-09-16 Ind Tech Res Inst Method for forming optimal characteristic curves of solar cell and system thereof
US20130181736A1 (en) * 2009-11-30 2013-07-18 Atonometrics, Inc. I-v measurement system for photovoltaic modules
CN107102588A (en) * 2017-05-25 2017-08-29 哈尔滨工业大学深圳研究生院 Solar array simulator controls the realization method and system of outer shroud
CN109004903A (en) * 2018-08-14 2018-12-14 中国计量大学 Fault detection system and method suitable for photovoltaic array
CN109613841A (en) * 2018-12-05 2019-04-12 中国计量大学 A kind of solar photovoltaic assembly parameter identification method under malfunction

Also Published As

Publication number Publication date
TW202112055A (en) 2021-03-16

Similar Documents

Publication Publication Date Title
US8461718B2 (en) Photovoltaic array systems, methods, and devices with bidirectional converter
TWI595744B (en) Power generation abnormality detection method and system for photovoltaic panels
US10389300B2 (en) Photovoltaic system having fault diagnosis apparatus, and fault diagnosis method for photovoltaic system
JP5403608B2 (en) Solar cell array diagnostic method and power conditioner
US20160011246A1 (en) Automatic generation and analysis of solar cell iv curves
JP5888724B2 (en) SOLAR CELL ARRAY DIAGNOSIS DEVICE, POWER CONDITIONER, SOLAR CELL ARRAY DIAGNOSIS METHOD, AND PROGRAM
Dhimish et al. Novel open-circuit photovoltaic bypass diode fault detection algorithm
JP3258862B2 (en) Interconnected inverter with solar cell output inspection function
Jianeng et al. Fault diagnosis method and simulation analysis for photovoltaic array
TWI718779B (en) Adaptive low-duty-type power generation abnormality detection method and system for photovoltaic panels
TWI718657B (en) Low-duty-type power generation abnormality detection method and system for photovoltaic panels
TWI747423B (en) Near open-circuit point power generation abnormality detection method and system for photovoltaic modules or module strings
KR101448990B1 (en) Method and apparatus for prviding inverter fault detecting in solar power generation system
JP2004078911A (en) System interconnection type solar power generator
TWI727513B (en) Power generation abnormality detection method and system suitable for offline photovoltaic panels
KR101987269B1 (en) Simulator for pv module power hardware-in-loop
TWI730634B (en) Simplified power generation abnormality detection method and system for photovoltaic panels
KR100955584B1 (en) Portable tester for potovoltaic array
TWI750647B (en) Maintenance abnormality detection method and system for photovoltaic modules or module strings
TWI709758B (en) Method of performance detection of photovoltaic device
TWM638576U (en) Photovoltaic power generation system
Sánchez et al. MPPT implementation for the outdoor characterization of CPV modules