- JP4294346B2 JP4294346B2 JP2003067599A JP2003067599A JP4294346B2 JP 4294346 B2 JP4294346 B2 JP 4294346B2 JP 2003067599 A JP2003067599 A JP 2003067599A JP 2003067599 A JP2003067599 A JP 2003067599A JP 4294346 B2 JP4294346 B2 JP 4294346B2
- Authority
- JP
- Japan
- Prior art keywords
- solar cell
- current
- voltage
- inductor
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Description
【0001】
【発明の属する技術分野】
本発明は、太陽電池の出力電力を電力変換回路で所望の電力に変換して負荷側に供給する太陽光発電システムに係り、特に、最大電力点追跡(MPPT:Maximum Power Point Tracking)制御方式を採用した太陽光発電システムおよびその最大電力点追従制御方法に関するものである。
【0002】
【従来の技術】
太陽電池は、日射強度や温度、または負荷条件によって最大電力動作点が大きく変動することから、高効率で使用するためには、最大電力点追跡(以下、MPPTという)制御が必要となる。
【0003】
系統連系型太陽光発電システムにおいては、いわゆる山登り法を用いたMPPT制御が提案され(たとえば、特許文献1参照)、実用化されている。
【0004】
図1は、従来の山登り法を採用した太陽光発電システムの構成例を示す図である。
【0005】
この太陽光発電システム1は、図1に示すように、太陽電池パネル(PV)2、電力変換回路3、および制御回路4を有している。
電力変換回路3は、電圧検出センサ部31、電流検出センサ部32、スイッチング素子としてのMOSFET33、インダクタ(チョークコイル)L1、ダイオードD1、キャパシタC1,C2を有している。また、VBはバッテリ電圧を示している。MOSFET33、インダクタ(チョークコイル)L1、ダイオードD1、キャパシタC2により降圧型DC−DCコンバータが構成される。
また、制御回路4は、インタフェース回路(I/F)41、マイクロプロセッサ(μPRO)41、MOSFETドライバ(DRV)43、EPROM44、およびSRAM45を有している。
【0006】
この太陽光発電システム1の動作原理について、図2に関連付けて説明する。なお、図2において、横軸がPWM制御信号のデューティサイクル(DutyCycle)、縦軸が太陽電池パネル2の出力電力をそれぞれ表している。
また、図2中、STP1,STP2は開始可能点を示す。
【0007】
この太陽光発電システム1においては、太陽電池の電圧および電流が電圧検出センサ部31、電流検出センサ部32で検出され、制御回路4のインタフェース回路41を介してマイクロプロセッサ42に供給される。
マイクロプロセッサ42は、入力された電圧値および電流値をデジタル値に変換して、両者の積から電力Pを求める。マイクロプロセッサ42は、図2に示すように、DC−DCコンバータ3のMOSFET33の駆動パルス幅を、ある微小幅で変化させ、電力Pを徐々に増加させていく。そして、電力Pの変化が減少に転じたならばパルス幅を今までとは逆に変化させる。
したがって、定常状態では、最大電力Pmax 近傍において、電力Pは常に振動する。
【0008】
【特許文献1】
特開平7−234733号公報
【0009】
【発明が解決しようとする課題】
上述した山登り法を採用したMPPT制御においては、動作原理から明らかなように、電力Pの真の電力最大点Pmax に近づけるためには、DC−DCコンバータのパルス幅の変化幅を小さくとれば良い。
【0010】
ところが、これにはDC−DCコンバータのスイッチング周波数やマイクロプロセッサの処理能力から制限があり、DC−DCコンバータのパルス幅の変化幅をある程度小さくできたとしても、日射強度の変化に対して最大電力点に到達するまでに時間を要し、結果として電力取得の効率が低下する。
逆に、応答性を良くするためにパルス幅の変化幅を大きくとると、定常状態で電力Pが大きく振動するため、結果として電力取得の効率が大幅に低下するという不利益がある。
【0011】
系統連系で既に実用化されている制御方式では、実際の運用において、上述したようなMPPTのミスマッチにより最大で25%もの損失の生じる事例が報告されている。
【0012】
本発明の目的は、太陽電池のMPPT制御を簡単かつ高精度で行うことが可能で、電力取得の効率を向上させることができる太陽光発電システムおよびその最大電力点追従制御方法を提供することにある。
【0013】
【課題を解決するための手段】
上記目的を達成するため、本発明の第1の観点に係る太陽光発電システムは、所要の電力を2端子から出力する太陽電池と、上記太陽電池の電圧を検出する電圧検出部と、少なくとも上記太陽電池の電流を検出する電流検出部と、インダクタと制御信号により導通制御されるスイッチング素子とを含み、上記太陽電池の出力電力値を電力値に変換する電力変換回路と、制御回路と、を有し、上記電力変換回路の上記インダクタと上記スイッチング素子は直列に接続され、当該両端がそれぞれ上記太陽電池の上記2端子に接続された回路が形成され、当該回路上に上記電圧検出部および上記電流検出部が配置され、上記制御回路は、上記電圧検出部で検出された太陽電池電圧と上記電流検出部で検出された太陽電池電流を受けて、太陽電池の最大電力点を求めるときは、制御信号により上記電力変換回路の上記スイッチング素子をオフ状態に保持させて、上記電力変換回路の上記インダクタを流れる電流の変化によって変化する太陽電池電流が零になったら、上記スイッチング素子をオン状態に保持させて、上記インダクタを流れる電流の変化によって変化する太陽電池電流を零から短絡電流まで変化させて、当該電流−電圧特性をスキャンし最大電力点を検出し、当該スキャンによって得られた最大電力点のときの最適太陽電池電流に太陽電池電流または最適太陽電池電圧に太陽電池電圧を追従させ、得られた最大電力動作点で動作するように上記スイッチング素子のオン・オフ制御を行う。
【0014】
好適には、上記制御回路は、上記スキャン期間のみ動作し、上記電圧検出部で検出された太陽電池電圧と上記電流検出部で検出された太陽電池電流を受けて、上記スキャン期間中は、上記制御信号により上記電力変換回路の上記スイッチング素子をオフ状態に保持させて、上記電力変換回路の上記インダクタを流れる電流の変化によって変化する太陽電池電流が零になったら、上記スイッチング素子をオン状態に保持させて、上記インダクタを流れる電流の変化によって変化する太陽電池電流を零から短絡電流まで変化させて、当該電流−電圧特性をスキャンし最大電力点を検出し、当該スキャンによって得られた最大電力点のときの最適太陽電池電流または最適太陽電池電圧を求める最大電力点検出回路を含み、上記制御回路はスキャン期間が終了し、上記最大電力点検出回路が非動作状態に保持され、電力制御がスキャン期間から追従動作期間に移行する。
【0015】
好適には、上記制御回路は、上記最大電力点の検出動作と追従動作を交互に繰り返し行う。
【0016】
好適には、上記電力変換回路の上記インダクタに流れる電流を検出するインダクタ電流検出センサ部をさらに有し、上記制御回路は、上記電圧検出センサ部で検出された太陽電池電圧、上記電流検出センサ部で検出された太陽電池電流、および上記インダクタ電流検出センサ部で検出されたインダクタ電流に基づいて、上記最大電力点の検出動作および追従動作の制御を行う。
【0017】
本発明の第2の観点は、所要の電力を2端子から出力する太陽電池の出力電力値を、インダクタと当該インダクタに直列に接続されたスイッチング素子とを含み、当該両端がそれぞれ上記太陽電池の2端子に接続された電力変換回路で所望の電力値に変換して負荷に供給する太陽光発電システムの最大電力点追従制御方法であって、太陽電池の電圧と少なくとも太陽電池の電流を検出し、検出した太陽電池電圧と太陽電池電流に基づいて、電力変換回路のインダクタを流れる電流の変化によって変化する太陽電池電流が零となるように、上記電力変換回路の上記スイッチング素子をオフ状態に保持させ、上記電力変換回路の上記インダクタを流れる電流の変化によって変化する太陽電池電流が零になったら、上記スイッチング素子をオン状態に保持させて、上記インダクタを流れる電流の変化によって変化する太陽電池電流を零から短絡電流まで変化させて、当該電流−電圧特性をスキャンし最大電力点を検出し、上記スキャンによって得られた最大電力点のときの最適太陽電池電流に太陽電池電流または最適太陽電池電圧に太陽電池電圧を追従させ、得られた最大電力動作点で動作するように上記スイッチング素子のオン・オフ制御を行う。
【0018】
本発明によれば、DC−DCコンバータなどの電力変換回路に含まれるインダクタに流れる電流の変化によって変化する太陽電池電流が零から短絡電流まで変化させられて、太陽電池のI−V特性が瞬時にスキャンされる。
そして、最適太陽電池電流に太陽電池電流を追従させ、得られた最大電力動作点で動作するように追従制御が行われる。
これにより、電流太陽電池の最大電力点を確実にかつ高い精度で検出することができる。
【0019】
【発明の実施の形態】
以下に、本発明の実施の形態について図面を参照しながら説明する。
【0020】
図3は、本発明に係る太陽光発電システムの一実施形態を示す構成図である。
【0021】
本太陽光発電システム10は、図3に示すように、太陽電池パネル(PV)11、電圧検出センサ部12、電流検出センサ部13、電力変換回路14、制御回路としてのデジタルシグナルプロセッサ(DSP:Digital Signal Processor)15、およびバッテリィ等の負荷16を有している。なお、負荷16は、たとえば12Vのバッテリィを2個直列に接続し、これと並列に100Wの電球を接続して負荷電圧がほぼ25Vで一定となるように調節されている。
【0022】
太陽電池パネル11は、所定起電力の複数の太陽電池をアレイ状に配列して構成されており、所要の電力(電圧)を端子TO1,TO2から出力する。
複数の太陽電池は並列に接続されるが、その数は、所要の電力に応じて選定される。
【0023】
電圧検出センサ部12は、太陽電池パネル11の出力電力から太陽電池電圧VPVをリアルタイムに検出して、DSP15に供給する。
【0024】
電流検出センサ部13は、太陽電池パネル11の出力電力から太陽電池電流IPVをリアルタイムに検出して、DSP15に供給する。
【0025】
電力変換回路14は、いわゆる昇圧型DC−DCコンバータにより構成され、太陽電池パネル11の出力電圧を昇圧して、昇圧電圧VL を負荷16に印加する。
【0026】
この電力変換回路14を構成する昇圧型DC−DCコンバータは、図3に示すように、スイッチング素子としての絶縁ゲート型電界効果トランジスタ(MOSFET)141、インダクタ(チョークコイル)L141、ダイオードD141、および平滑用キャパシタC141により構成されている。
なお、MOSFET141は、たとえばnチャネルのMOSトランジスタにより構成される。
【0027】
MOSFET141のソースが太陽電池パネル11の電力出力端TO2に接続され、その接続点がキャパシタC141の第1電極に接続されている。また、MOSFET141のソースと電力出力端TO2との接続ラインに電流検出センサ部13の電流検出センサが配置されている。
MOSFET141のドレインがインダクタL141の一端に接続され、その接続点がダイオードD141のアノードに接続されている。ダイオードD141のカソードがキャパシタC141の第2電極に接続されている。
そして、キャパシタC141の第1電極とMOSFET141のソースとの接続点、並びに第2電極とダイオードD141のカソードとの接続点が負荷16に接続されている。
MOSFET141は、そのゲート端子に、DSP15による制御信号CTLが供給されて、その導通状態が制御される。
【0028】
DSP15は、電圧検出センサ部12で検出された太陽電池電圧VPVと電流検出センサ部13で検出された太陽電池電流IPVを受けて、太陽電池パネル11の最大電力Pmax を求めるときは、制御信号CTLにより電力変換回路14のMOSFET141をオフ状態に保持させて(MOSFETがnチャネル場合、制御信号CTLをローレベルに保持して)、電力変換回路14に内蔵されるインダクタL141を流れる電流の変化によって変化する太陽電池電流IPVが零になったら、MOSFET141をオン状態に保持させて電力変換回路14に内蔵されるインダクタL141を流れる電流の変化によって変化する太陽電池電流IPVを零から短絡電流まで変化させ、その電流−電圧(I−V)特性をスキャンし、それによって得られた最大電力点に追従するようにMOSFET141のオフ状態を解除してMOSFET141に対するPWM制御を行い、この最大電力点の検出動作(I−Vスキャン)と追従動作を交互に繰り返し行うことで、精度の高いMPPT制御を行う。
【0029】
すなわち、DSP15は、電力変換回路14に内蔵されるインダクタL141を流れる電流の変化を利用して、I−V特性を瞬時にスキャンする動作をMPPT制御に組み込んで、最大電力点の検出動作と追従動作を1つのサイクル(検出周期T:たとえば1秒)として繰り返し動作させることで、最大電力点を確実かつ厳密に求めるような制御を行う。
【0030】
具体的には、DSP15は、図3に示すように、アナログ−デジタル変換回路(ADC)151、乗算器152、最大電力点検出回路(Pmax DET )153、加算器(減算器)154、PI制御器155、搬送波生成器156、加算器(減算器)157、コンパレータ158、およびPWM信号出力部159を有している。
以下に、DSP15の各構成要素の機能について、図4(A)〜(E)に関連付けて説明する。
【0031】
図4(A)〜(E)は、太陽光発電システム10の各要部波形を示す図である。
図4(A)は電力変換回路14のインダクタL141の短絡電流ISCを、図4(B)はDSP15のPI制御器155による基準信号波Vref と搬送波生成器156による搬送波Vcを、図4(C)はDSP15のPWM信号出力部159のPWM信号を、図4(D)は太陽電池電圧VPVおよび太陽電池電流IPVを、図4(E)は太陽電池電力PPVをそれぞれ示している。
また、SCNは最大電力点Pmax 検出のためのスキャン期間、TRKは追従動作期間をそれぞれ示している。
【0032】
ADC151は、電圧検出センサ部12で検出された太陽電池電圧VPVをアナログ値からデジタル値に変換して乗算器152の第1端子に供給する。
また、ADC151は、電流検出センサ部13で検出された太陽電池電流IPVをアナログ値からデジタル値に変換して乗算器152の第2端子および加算器154に供給する。
【0033】
乗算器152は、ADC151によるデジタルの太陽電池電圧VPVと太陽電池電流IPVとを乗算し、その結果VI(=PPV) を最大電力点検出回路153に出力する。
この乗算器152は、最大電力点Pmax の検出期間のみ(スキャン期間のみ)動作するように制御される。
【0034】
最大電力点検出回路153は、最大電力点Pmax の検出期間のみ(スキャン期間のみ)動作し、このスキャン期間中は、制御信号CTLにより電力変換回路14のMOSFET141をオフ状態に保持させて、図4(D),(E)に示すように、電力変換回路14に内蔵されるインダクタL141を流れる電流の変化によって変化する太陽電池電流IPVが零になったら、MOSFET141をオン状態に保持させて太陽電池電流IPVを零から短絡電流まで変化させ、乗算器152による太陽電池電力PPVに基づいてその電流−電圧(I−V)特性をスキャンして最大電力点Pmax を検出し、そのときの最適太陽電池電流IOPを求め、加算器154に出力する。
最大電力点検出回路153は、最大電力点Pmax を検出し、そのときの最適太陽電池電流IOPを求めると、電力変換回路14におけるMOSFET141のオン・オフ制御を解除する。
【0035】
加算器154は、最大電力点検出回路153による最適太陽電池電流IOPとADC151による太陽電池電流IPVとを加算し(差をとり)、その結果を信号S154としてPI制御器155に出力する。
【0036】
PI制御器155は、加算器154の出力信号を受けて、図4(B)に示すような基準信号波Vref を生成して加算器157に出力する。
【0037】
搬送波生成器156は、図4(B)に示すような、いわゆるのこぎり波(三角波)である搬送波Vcを生成し、加算器157に出力する。
【0038】
加算器157は、PI制御器155による基準信号波Vref と搬送波生成器156による搬送波Vcを合波して信号S157としてコンパレータ158に出力する。
【0039】
コンパレータ158は、加算器157の出力信号S157を受けて、基準信号波Vref と搬送波Vcとを比較しその結果をPWM信号生成部159に出力する。
PWM信号生成部159は、コンパレータ158の比較結果を受けて、図4(B),(C)に示すように、搬送波Vcの立上がりタイミングからこの搬送波Vcと基準信号波Vref が交わる時点までをハイレベル「1」の期間とし、この交点から次の搬送波Vcの立上がりタイミングまでをローレベル「0」期間とするパルスを連続して生成し、追従動作期間TRKの間、PWM信号として電力変換回路14のMOSFET141のゲートに供給する。
【0040】
PWM信号生成部159によるPWM信号の出力は、スキャン期間に検出された最適太陽電池電流IOPに太陽電池電流IPVを追従させる追従動作期間TRKに行われる。
このとき、DSP15は、電力取得能力を高めるために数十kHz(たとえば10kHz)と高い周波数fcでMOSFET141のスイッチング制御を行う。
【0041】
次に、上記構成による動作を説明する。
【0042】
太陽電池パネル11から照射される光量に応じて、所要の電力が端子TO1,TO2から電力変換回路14に出力される。
このとき、電圧検出センサ部12において、太陽電池パネル11の出力電力から太陽電池電圧VPVがリアルタイムに検出されて、DSP15のADC151に供給される。
同様に、電流検出センサ部13において、太陽電池パネル11の出力電力から太陽電池電流IPVがリアルタイムに検出されて、DSP15のADC151に供給される。
また、電力変換回路14おいては、太陽電池パネル11の出力電圧が昇圧されて昇圧電圧VL として負荷16に印加される。
【0043】
リアルタイムで検出される太陽電池電圧VPVと太陽電池電流IPVはADC151において、アナログ値からデジタル値に変換され乗算器152に供給され、また、太陽電池電流IPVは加算器154に供給される。
【0044】
ここで、最大電力点Pmax を検出する場合、すなわちスキャン動作を行う場合には、DSP15において乗算器152および最大電力点検出回路153が動作状態とされる。
そして、最大電力点検出回路153において、制御信号CTLにより電力変換回路14のMOSFET141がオフ状態に保持される。
乗算器152では、ADC151によるデジタルの太陽電池電圧VPVと太陽電池電流IPVとが乗算され、その結果VI(=PPV) が最大電力点検出回路153に入力される。
そして、最大電力点検出回路153において、電力変換回路14に内蔵されるインダクタL141を流れる電流の変化によって変化する太陽電池電流IPVが零になったことが確認されると、制御信号CTLによりMOSFET141をオン状態になるように制御される。
これにより、電力変換回路14に内蔵されるインダクタL141を流れる電流の変化によって変化する太陽電池電流IPVを零から短絡電流まで変化し、乗算器152による太陽電池電力PPVに基づいてその電流−電圧(I−V)特性をスキャンして最大電力点Pmax が検出される。最大電力点検出回路153において、そのときの最適太陽電池電流IOPを求められ、加算器154に出力される。
【0045】
最大電力点検出回路153において、最大電力点Pmax を検出し、そのときの最適太陽電池電流IOPを求めると、電力変換回路14におけるMOSFET141のオン・オフ制御が解除され、乗算器152および最大電力検出回路153は非動作状態に保持される。
そして、DSP15においては、電力制御がスキャン期間SCNから追従動作期間TRKに移行する。
【0046】
追従動作期間TRKにおいて、加算器154では、最大電力点検出回路153による最適太陽電池電流IOPとADC151による太陽電池電流IPVとが加算され、その結果がS154としてPI制御器155に出力される。
PI制御器155においては、加算器154の出力信号を受けて基準信号波Vref が生成されて加算器157に出力される。
加算器157においては、PI制御器155による基準信号波Vref と搬送波生成器156による搬送波Vcが合波されて信号S157としてコンパレータ158に出力される。
コンパレータ158では、加算器157の出力信号S157を受けて、基準信号波Vref と搬送波Vcとが比較されて結果がPWM信号生成部159に供給される。
そして、PWM信号生成部159において、コンパレータ158の比較結果を受けて、所定のPWM信号が生成されて電力変換回路14のMOSFET141のゲートに供給される。これにより、MOSFET141は数十kHzという高い周波数fcでスイッチング制御され、スキャン期間SCNに求められた最適太陽電池電流IOPにカレント太陽電池電流IPVが追従するように制御される。
【0047】
以上の最大電力点の検出動作と追従動作を1つのサイクル(検出周期T:たとえば1秒)として繰り返し動作させることで、最大電力点Pmax が確実かつ厳密に求められる。
【0048】
上述した本実施形態に係る制御方式の効果を確認するため、独立型の太陽光発電で広く利用されているバッテリィ制御装置を搭載した従来方式と比較した。
【0049】
図5は、本制御方式および従来方式における一日の太陽電池出力電力の変化(バッテリィ負荷)を示す図である。
【0050】
この図5の特性は、太陽電池パネル11は、本制御方式ではパネル2枚を並列に接続し、従来方式では2枚を直列に接続して構成し、DC−DCコンバータ(電力変換回路14)のインダクタ141のインダクタンスL=7.5mH、平滑用キャパシタC141の容量C=200μFとし、負荷16として12Vのバッテリィを2個直列に接続し、これと並列に100Wの電球を接続して負荷電圧がほぼ25Vで一定となるように調節し、スイッチング周波数fcを10kHz、検出周期Tを1秒とした。また、日中の午前7時30分から午後4時までの太陽電池出力電力PPVの変換を比較している。
【0051】
図5において、横軸が時刻を、左側縦軸が太陽電池出力電力とパネル面温度を表し、右側縦軸が日射温度を表している。
また、図5において、Aで示す曲線が日射強度を、Bで示す曲線が本制御方式の特性を、Cで示す曲線が従来方式の特性を、Dで示す曲線がパネル面温度をそれぞれ示している。
【0052】
図5からわかるように、本制御方式は従来方式に比較して太陽電池の出力電力PPVが大幅に増加している。
発電電力で比較すると、従来方式が462.6Whであったものが、本制御方式では531.2Whと約14.8%増加した。
このときの最大電力Pmax に対する実際の取得できた電力の割合は約99%と非常に高い効率を示した。
【0053】
図6は、負荷を純抵抗RL とし、その値を10Ω→20Ω→10Ωとステップ状に変化させ、急激な負荷変動を与えたとき応答特性を示す図である。
図6において、横軸が時間を、左側縦軸が太陽電池出力電力を表し、右側縦軸が日射温度を表している。
また、図6において、Aで示す曲線が日射強度を、Bで示す曲線が本制御方式の特性を、Cで示す曲線が従来方式の特性をそれぞれ示している。
【0054】
図6からわかるように、本制御方式は従来方式に比較して、負荷変動による影響を受けることなく、日射強度に比例した電力を安定に取り出すことができる。
【0055】
次に、日暮れ等、日射強度が急変する場合の応答特性について、図7〜図11に関連付けて考察する。
【0056】
図7は、本制御方式における日射強度急変時の応答特性の一例を示す図である。
図7において、横軸が時間を、左側縦軸が太陽電池出力電力を表し、右側縦軸が日射温度を表している。
また、図8(A),(B)は、図7との比較のための図であって、従来の山登り法による日射強度急変時の応答特性の一例を示す図である(文献:高原、山之内、松田、電学論D、119巻、12号、平成11年より引用)。
【0057】
図9(A),(B)は、太陽電池パネルに影が生じない場合と生じた場合の本制御方式の追従性を示す図である。
また、図10(A),(B)は、図9(A),(B)との比較のための図であって、太陽電池パネルに影が生じない場合と生じた場合の従来の山登り法の追従性を示す図である。
【0058】
太陽電池の現在の技術的課題は、太陽光照度の急変に対する追従性および照度の絶対値が減少していくとき(日暮れ等)、どこまで電力を捕捉供給できるかという点である。
MPPT制御で現在実用に供されている山登り法に対して本制御方式は、いずれの課題においても優れている。
【0059】
照度急変に対する追従性は、図7および図8(A),(B)に示すように、本制御方式ではただ一度のスキャンによって変化後の最大電力点を検出することが可能であるのに対し、山登り法では変化前の最大点近傍でスキャンを繰り返してピーク値を探す。
この場合、図10(A),(B)に示すように、山登り法では太陽電池パネルへの影の影響などが不均一に起きた場合にはピーク値が大きく変動した点になることもあり、追従制御が落ちることになる。
これに対して、本制御方式によれば、図9(A),(B)に示すように、太陽電池パネルへの影の影響などが不均一に起きた場合であって、良好な追従性を示す。
【0060】
図11は、本制御方式における低照度時の電力取得性能を示す図である。
図11において、横軸が時刻を、左側縦軸が電力取得の効率を表す太陽電池出力利用率UUFを、右側縦軸がパネル面日射強度Gをそれぞれ表している。
なお、太陽電池出力利用率UUFは、最大電力点検出周期をTとすると、次式で与えられる。
【0061】
【数1】
【0062】
低照度領域での追従は、山登り法では微分値を得るためにかなり早い段階で制御不能の現象が起きる。
これに対して、本制御方式では、単純な最大値検出のため、スキャン全幅の中に勾配があれば追従可能である。
図11からわかるように、本制御方式では、日射強度Gがピーク時800W/m2 のとき100/m2 まで照度が低下しても出力利用率UUFが90%を維持している。
【0063】
また、図12は、本制御方式における低照度時の電力取得特性を示す図である。
図12において、横軸が時刻を、左側縦軸が太陽電池出力電力PPVおよび太陽電池出力利用率UUFを、右側縦軸がパネル面日射強度Gをそれぞれ表している。
なお、太陽電池出力利用率UUFは、最大電力点検出周期をTとすると、上記数1で与えられる。
【0064】
本制御方式では、図12に示すように、日射強度Gが50W/m2 で太陽電池出力利用率UUFが80%以上と高い効率を示す。
また、本制御方式では、日射強度Gが50W/m2 以下では、太陽電池出力利用率UUFは低下するが60%程度エネルギーを回収することがきる。
【0065】
以上説明したように、本実施形態によれば、DC−DCコンバータなどの電力変換回路14に含まれるインダクタL141に流れる電流の変化によって変化する太陽電池電流IPVを零から短絡電流まで変化させ、太陽電池のI−V特性を瞬時にスキャンし、最適太陽電池電流IOPに太陽電池電流IPVを追従させ、得られた最大電力動作点で動作するように追従制御を行うDSP15を設けたので、太陽電池の最大電力点を確実にかつ高い精度で検出することができる。
実測例によれば、本制御方式と独立型の太陽光発電システムで広く利用されているバッテリィ制御装置を搭載した従来方式を発電電力量について比較すると14.8%程度増加し、太陽電池出力利用率UUFは約99%と非常に高い値を得ることができる。また、負荷変動に対する制御特性も良いという利点がある。
【0066】
なお、以上の説明では、電力変換回路としてのDC−DCコンバータは、昇圧型を例に説明した。この昇圧型DC−DCコンバータでは、太陽電池電圧より高い負荷電圧を得ることができる。
【0067】
たとえば、負荷電圧を太陽電池電圧より下げたい場合には、図13に示すような、電力変換回路14Aとして降圧型DC−DCコンバータを用いた回路構成が適している。
降圧型DC−DCコンバータにおいては、太陽電池パネル11の第1端子TO1および第2端子TO2に対して並列にキャパシタCF が接続される。
また、MOSFET141のドレインが太陽電池パネル11の第1端子TO1に接続され、ソースがダイオードD141のカソードおよびインダクタL141の一端に接続される。ダイオードD141のアノードが太陽電池パネル11の第2端子TO2、キャパシタC141,CF の第1電極に接続され、インダクタL141の他端がキャパシタC141の第2電極に接続される。
この降圧型DC−DCコンバータを用いる場合、検出動作時にインダクタL141を流れる電流IL 、太陽電池電流IPV、および太陽電池電圧PPVを3つのセンサで検出する必要がある。
【0068】
図14(A)〜(D)は、電力変換回路として降圧型DC−DCコンバータを用いた場合の太陽光発電システム10Aの各要部波形を示す図である。
図14(A)はDSP15のPWM信号出力部159のPWM信号を、図14(B)は太陽電池電圧VPVおよび太陽電池電流IPVを、図14(C)は電力変換回路14AのインダクタL141を流れる電流IL を、図14(D)は太陽電池電力PPVをそれぞれ示している。
また、SCNは最大電力点Pmax 検出のためのスキャン期間、TRKは追従動作期間をそれぞれ示している。
【0069】
電力変換回路として降圧型DC−DCコンバータを用いた場合の太陽光発電システム10Aの動作が昇圧型DC−DCコンバータを用いた場合と異なる点は、PWM信号のオン、オフが逆となることである。
【0070】
また、負荷電圧を太陽電池電圧により下げたり上げたりしたい場合には、図15に示すような、電力変換回路14Bとして昇降圧型DC−DCコンバータを用いた回路構成が適している。
昇降圧型DC−DCコンバータにおいては、太陽電池パネル11の第1端子TO1および第2端子TO2に対して並列にキャパシタCF が接続される。
また、MOSFET141のドレインが太陽電池パネル11の第1端子TO1に接続され、ソースがダイオードD141のカソードおよびインダクタL141の一端に接続される。インダクタL141の他端が太陽電池パネル11の第2端子TO2、キャパシタC141,CF の第1電極に接続され、ダイオードD141のアノードがキャパシタC141の第2電極に接続される。
この昇降圧型DC−DCコンバータを用いる場合も、検出動作時にインダクタL141を流れる電流IL 、太陽電池電流IPV、および太陽電池電圧PPVを3つのセンサで検出する必要がある。
【0071】
図16(A)〜(D)は、電力変換回路として昇降圧型DC−DCコンバータを用いた場合の太陽光発電システム10Bの各要部波形を示す図である。
動作波形としては、図15(A)〜(D)とほぼ同じであるが、PWM信号のオン、オフが逆となる。
【0072】
このように、電力変換回路の種類によらずその電力変換回路に挿入されたインダクタに流れる電流の変化を利用して、瞬時に太陽電池のI−V特性をスキャンし、その結果をもとに追従制御を行い、太陽電池の高精度なMPPT制御を実現することが可能である。
【0073】
なお、上述の実施形態では、最大電力点のときの最適太陽電池電流に太陽電池電流を追従させるように追従制御を行う例を説明したが、最大電力点のときの最適太陽電池電圧に太陽電池電圧を追従させるように追従制御を行う構成を採用することも可能である。
この場合も、上述した効果と同様の効果を得ることができる。
【0074】
【発明の効果】
以上説明したように、本発明によれば、最大電力点を確実に高い精度で検出することが可能となり、発電電力量を増大でき、電力取得の効率を大幅に向上させることができる。
また、負荷変動に対する制御特性も良いという利点がある。
【図面の簡単な説明】
【図1】従来の山登り法を採用した太陽光発電システムの構成例を示す図である。
【図2】図1の太陽光発電システムの動作原理を説明するための図である。
【図3】本発明に係る太陽光発電システムの一実施形態を示す構成図である。
【図4】本実施形態に係る太陽光発電システムの要部波形を示す図である。
【図5】本制御方式および従来方式における一日の太陽電池出力電力の変化(バッテリィ負荷)を示す図である。
【図6】負荷を純抵抗RL とし、その値を10Ω→20Ω→10Ωとステップ状に変化させ、急激な負荷変動を与えたとき応答特性を示す図である。
【図7】本制御方式における日射強度急変時の応答特性の一例を示す図である。
【図8】図7との比較のための図であって、従来の山登り法による日射強度急変時の応答特性の一例を示す図である。
【図9】太陽電池パネルに影が生じない場合と生じた場合の制御方式の追従性を示す図である。
【図10】図9との比較のための図であって、太陽電池パネルに影が生じない場合と生じた場合の従来の山登り法の追従性を示す図である。
【図11】本制御方式における低照度時の電力取得性能を示す図である。
【図12】本制御方式における低照度時の電力取得特性を示す図である。
【図13】降圧型DC−DCコンバータの構成を示す回路図である。
【図14】電力変換回路として降圧型DC−DCコンバータを用いた場合の太陽光発電システムの各要部波形を示す図である。
【図15】昇降圧型DC−DCコンバータの構成を示す回路図である。
【図16】電力変換回路として昇降圧型DC−DCコンバータを用いた場合の太陽光発電システムの各要部波形を示す図である。
【符号の説明】
10,10A,10B…太陽光発電システム、11…太陽電池パネル(PV)、12…電圧検出センサ部、13…電流検出センサ部、14,14A,14B…電力変換回路、141…MOSFET、L141…インダクタ、D141…ダイオード、C141…キャパシタ、15…デジタルシグナルプロセッサ(DSP)、151…アナログ−デジタル変換回路(ADC)、152…乗算器、153…最大電力点検出回路(Pmax DET )、154…加算器(減算器)、155…PI制御器、156…搬送波生成器、157…加算器(減算器)、158…コンパレータ、159…PWM信号出力部、16…負荷。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a solar power generation system that converts output power of a solar cell into desired power by a power conversion circuit and supplies the power to a load side. In particular, a maximum power point tracking (MPPT) control system is used. The present invention relates to a adopted solar power generation system and its maximum power point tracking control method.
[0002]
[Prior art]
Since the maximum power operating point varies greatly depending on solar radiation intensity, temperature, or load conditions, solar cell requires maximum power point tracking (hereinafter referred to as MPPT) control in order to use it with high efficiency.
[0003]
In a grid-connected solar power generation system, MPPT control using a so-called hill-climbing method has been proposed (see, for example, Patent Document 1) and put into practical use.
[0004]
FIG. 1 is a diagram illustrating a configuration example of a photovoltaic power generation system employing a conventional hill-climbing method.
[0005]
As shown in FIG. 1, the solar
The power conversion circuit 3 includes a voltage
The control circuit 4 includes an interface circuit (I / F) 41, a microprocessor (μPRO) 41, a MOSFET driver (DRV) 43, an EPROM 44, and an SRAM 45.
[0006]
The operation principle of the solar
In FIG. 2, STP1 and STP2 indicate startable points.
[0007]
In this solar
The
Therefore, in the steady state, the power P constantly vibrates in the vicinity of the maximum power Pmax.
[0008]
[Patent Document 1]
JP-A-7-234733
[0009]
[Problems to be solved by the invention]
In the MPPT control employing the above-described hill-climbing method, as apparent from the operating principle, in order to approach the true maximum power point Pmax of the power P, the change width of the pulse width of the DC-DC converter may be reduced. .
[0010]
However, this is limited by the switching frequency of the DC-DC converter and the processing capability of the microprocessor. Even if the change width of the pulse width of the DC-DC converter can be reduced to some extent, the maximum power with respect to the change in the solar radiation intensity. It takes time to reach the point, and as a result, the efficiency of power acquisition decreases.
Conversely, if the change width of the pulse width is increased in order to improve the responsiveness, the power P vibrates greatly in the steady state, resulting in a disadvantage that the efficiency of power acquisition is greatly reduced.
[0011]
In the control system already put into practical use in the grid interconnection, there has been reported a case where a loss of up to 25% is caused in the actual operation due to the above-described MPPT mismatch.
[0012]
An object of the present invention is to provide a solar power generation system and its maximum power point tracking control method capable of easily and accurately performing MPPT control of a solar cell and improving the efficiency of power acquisition. is there.
[0013]
[Means for Solving the Problems]
In order to achieve the above object, a photovoltaic power generation system according to the first aspect of the present invention includes: Output required power from 2 terminals A solar cell, a voltage detector that detects the voltage of the solar cell, a current detector that detects at least the current of the solar cell, and an inductor; A switching element whose conduction is controlled by a control signal; A power conversion circuit that converts the output power value of the solar cell into a power value; A control circuit, wherein the inductor of the power conversion circuit and the switching element are connected in series, and a circuit is formed in which both ends are connected to the two terminals of the solar cell, and the circuit is formed on the circuit. A voltage detector and the current detector are arranged, and the control circuit is the above Voltage detector The solar cell voltage detected in the above and Current detector In response to the solar cell current detected in When obtaining the maximum power point of the solar cell, the switching element of the power conversion circuit is held in an off state by a control signal, and the solar cell current that changes due to a change in the current flowing through the inductor of the power conversion circuit is zero. The switching element is held in the on state, Flowing through inductor Varies with changes in current The solar cell current is changed from zero to the short-circuit current, the current-voltage characteristic is scanned to detect the maximum power point, and the solar cell current or the optimum solar cell current at the maximum power point obtained by the scan is detected. Make the solar cell voltage follow the solar cell voltage and operate at the maximum power operating point obtained. ON / OFF of the switching element Take control.
[0014]
Preferably, the control circuit operates only during the scan period, receives the solar cell voltage detected by the voltage detection unit and the solar cell current detected by the current detection unit, and during the scan period, The switching element of the power conversion circuit is held in an off state by a control signal, and when the solar cell current that changes due to a change in the current flowing through the inductor of the power conversion circuit becomes zero, the switching element is turned on. The solar cell current that changes due to the change in the current flowing through the inductor is changed from zero to a short-circuit current, the current-voltage characteristic is scanned to detect the maximum power point, and the maximum power obtained by the scan A maximum power point detection circuit for obtaining an optimum solar cell current or an optimum solar cell voltage at a point, and the control circuit includes a scan period There ended, the maximum power point detection circuit is held in a non-operating state, the power control is transferred from the scan period following the operation period .
[0015]
Preferably, the control circuit repeatedly performs the maximum power point detection operation and the tracking operation alternately.
[0016]
Preferably, the power conversion circuit the above An inductor current detection sensor unit that detects a current flowing through the inductor, and the control circuit includes a solar cell voltage detected by the voltage detection sensor unit, a solar cell current detected by the current detection sensor unit, and the above Based on the inductor current detected by the inductor current detection sensor, the maximum Power point detection Controls motion and follow-up motion.
[0017]
Of the present invention Second The perspective is Output required power from 2 terminals Output power value of solar cell, inductor And a switching element connected in series to the inductor, both ends of which are respectively connected to two terminals of the solar cell. A maximum power point tracking control method for a photovoltaic power generation system that converts a power value into a desired power value by a power conversion circuit and supplies the load to a load. of Voltage and at least solar cell of Based on the detected solar cell voltage and solar cell current, The switching element of the power conversion circuit is held in an off state so that the solar cell current that changes due to the change of the current flowing through the inductor of the power conversion circuit becomes zero, and the change of the current flowing through the inductor of the power conversion circuit When the solar cell current that changes due to becomes zero, the switching element is held in the on state, Flowing through inductor Varies with changes in current The solar cell current is changed from zero to the short-circuit current, the current-voltage characteristic is scanned to detect the maximum power point, and the solar cell current or the optimum solar cell current at the maximum power point obtained by the above scan is detected. Make the solar cell voltage follow the solar cell voltage and operate at the maximum power operating point obtained. Performs on / off control of the switching element. .
[0018]
According to the present invention, the current flows through an inductor included in a power conversion circuit such as a DC-DC converter. Varies with changes in current The solar cell current is changed from zero to a short-circuit current, and the IV characteristics of the solar cell are instantaneously scanned.
Then, the solar cell current is caused to follow the optimum solar cell current, and the follow-up control is performed so as to operate at the obtained maximum power operating point.
Thereby, the maximum power point of the current solar cell can be reliably detected with high accuracy.
[0019]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings.
[0020]
FIG. 3 is a configuration diagram showing an embodiment of the photovoltaic power generation system according to the present invention.
[0021]
As shown in FIG. 3, the photovoltaic
[0022]
The
A plurality of solar cells are connected in parallel, but the number is selected according to the required power.
[0023]
The voltage
[0024]
The current
[0025]
The
[0026]
As shown in FIG. 3, the step-up DC-DC converter constituting the
The
[0027]
The source of the
The drain of the
A connection point between the first electrode of the capacitor C141 and the source of the
The
[0028]
When the
[0029]
That is, the
[0030]
Specifically, as shown in FIG. 3, the
Below, the function of each component of the
[0031]
4 (A) to 4 (E) are diagrams showing waveforms of respective main parts of the solar
4A shows the short-circuit current ISC of the inductor L141 of the
SCN represents a scan period for detecting the maximum power point Pmax, and TRK represents a follow-up operation period.
[0032]
The
Further, the
[0033]
The
The
[0034]
The maximum power
When the maximum power
[0035]
The
[0036]
The
[0037]
The
[0038]
The
[0039]
The PWM
[0040]
The output of the PWM signal by the PWM
At this time, the
[0041]
Next, the operation according to the above configuration will be described.
[0042]
Depending on the amount of light irradiated from the
At this time, in the voltage
Similarly, in the current
In the
[0043]
The solar cell voltage VPV and the solar cell current IPV detected in real time are converted from analog values to digital values in the
[0044]
Here, when the maximum power point Pmax is detected, that is, when the scan operation is performed, the
In the maximum power
The
In the maximum power
Thereby, it flows through the inductor L141 built in the
[0045]
When the maximum power
In the
[0046]
In the follow-up operation period TRK, the
The
In the
The
Then, the PWM
[0047]
The maximum power point Pmax can be obtained reliably and strictly by repeatedly operating the detection operation and the follow-up operation of the maximum power point as one cycle (detection cycle T: for example, 1 second).
[0048]
In order to confirm the effect of the control method according to this embodiment described above, a comparison was made with a conventional method equipped with a battery control device widely used in independent solar power generation.
[0049]
FIG. 5 is a diagram showing a change (battery load) of solar cell output power in one day in the present control method and the conventional method.
[0050]
The characteristic of FIG. 5 is that the
[0051]
In FIG. 5, the horizontal axis represents time, the left vertical axis represents solar cell output power and panel surface temperature, and the right vertical axis represents solar radiation temperature.
In FIG. 5, the curve indicated by A indicates the solar radiation intensity, the curve indicated by B indicates the characteristics of this control method, the curve indicated by C indicates the characteristics of the conventional method, and the curve indicated by D indicates the panel surface temperature. Yes.
[0052]
As can be seen from FIG. 5, in this control method, the output power PPV of the solar cell is greatly increased as compared with the conventional method.
Compared with the generated power, the conventional method was 462.6 Wh, but this control method increased by about 14.8% to 531.2 Wh.
The ratio of the actually obtained power to the maximum power Pmax at this time was very high at about 99%.
[0053]
FIG. 6 is a diagram showing response characteristics when the load is a pure resistance RL and the value is changed stepwise from 10Ω → 20Ω → 10Ω to give a sudden load fluctuation.
In FIG. 6, the horizontal axis represents time, the left vertical axis represents solar cell output power, and the right vertical axis represents solar radiation temperature.
In FIG. 6, the curve indicated by A indicates the solar radiation intensity, the curve indicated by B indicates the characteristics of this control method, and the curve indicated by C indicates the characteristics of the conventional method.
[0054]
As can be seen from FIG. 6, the present control method can stably extract power proportional to the solar radiation intensity without being affected by load fluctuations, as compared with the conventional method.
[0055]
Next, the response characteristics when the solar radiation intensity changes suddenly, such as at sunset, will be considered in association with FIGS.
[0056]
FIG. 7 is a diagram showing an example of response characteristics when the solar radiation intensity changes suddenly in this control method.
In FIG. 7, the horizontal axis represents time, the left vertical axis represents solar cell output power, and the right vertical axis represents solar radiation temperature.
FIGS. 8A and 8B are diagrams for comparison with FIG. 7, and are diagrams illustrating an example of response characteristics at the time of a sudden change in solar radiation intensity by the conventional hill-climbing method (reference: plateau, Yamanouchi, Matsuda, D. D, 119, 12, quoted from 1999).
[0057]
FIGS. 9A and 9B are diagrams showing the followability of the present control method when a shadow does not occur on the solar cell panel and when it occurs.
FIGS. 10 (A) and 10 (B) are diagrams for comparison with FIGS. 9 (A) and 9 (B), and the conventional hill climbing in the case where the shadow does not occur in the solar cell panel and in the case where it occurs. It is a figure which shows the tracking property of a method.
[0058]
The current technical problem of solar cells is how much power can be captured and supplied when the follow-up to a sudden change in sunlight illuminance and the absolute value of illuminance decrease (such as sunset).
The present control method is superior in any problem to the hill-climbing method that is currently in practical use in MPPT control.
[0059]
As shown in FIGS. 7 and 8 (A) and 8 (B), the tracking capability for sudden changes in illuminance allows the maximum power point after change to be detected by a single scan in this control method. In the hill-climbing method, the peak value is searched by repeating scanning near the maximum point before the change.
In this case, as shown in FIGS. 10A and 10B, in the hill-climbing method, when the influence of the shadow on the solar cell panel occurs unevenly, the peak value may greatly change. The follow-up control will drop.
On the other hand, according to this control method, as shown in FIGS. 9A and 9B, when the influence of the shadow on the solar cell panel occurs non-uniformly, it has good followability. Indicates.
[0060]
FIG. 11 is a diagram showing the power acquisition performance at low illuminance in this control method.
In FIG. 11, the horizontal axis represents time, the left vertical axis represents solar cell output utilization rate UUF representing power acquisition efficiency, and the right vertical axis represents panel surface solar radiation intensity G.
The solar cell output utilization rate UUF is given by the following equation, where T is the maximum power point detection period.
[0061]
[Expression 1]
[0062]
The tracking in the low illuminance region causes an uncontrollable phenomenon at a very early stage in order to obtain a differential value in the hill climbing method.
On the other hand, in this control method, for simple maximum value detection, if there is a gradient in the entire scan width, it can be followed.
As can be seen from FIG. 11, in this control method, the solar radiation intensity G is 800 W / m at the peak time. 2 At 100 / m 2 Even if the illuminance decreases to 90%, the output utilization factor UUF maintains 90%.
[0063]
FIG. 12 is a diagram showing power acquisition characteristics at low illuminance in this control method.
In FIG. 12, the horizontal axis represents time, the left vertical axis represents the solar cell output power PPV and the solar cell output utilization factor UUF, and the right vertical axis represents the panel surface solar radiation intensity G.
The solar cell output utilization rate UUF is given by the
[0064]
In this control method, as shown in FIG. 12, the solar radiation intensity G is 50 W / m. 2 The solar cell output utilization factor UUF is as high as 80% or higher.
In this control method, the solar radiation intensity G is 50 W / m. 2 Below, the solar cell output utilization factor UUF decreases, but it is possible to recover energy by about 60%.
[0065]
As described above, according to the present embodiment, the current flows through the inductor L141 included in the
According to an actual measurement example, when this method and a conventional method equipped with a battery control device widely used in an independent solar power generation system are compared with each other in terms of the amount of generated electric power, the use of solar cell output is increased. The rate UUF can be as high as about 99%. In addition, there is an advantage that the control characteristic against the load fluctuation is also good.
[0066]
In the above description, the DC-DC converter as the power conversion circuit is described as a boost type. In this step-up DC-DC converter, a load voltage higher than the solar cell voltage can be obtained.
[0067]
For example, when the load voltage is desired to be lower than the solar cell voltage, a circuit configuration using a step-down DC-DC converter as the
In the step-down DC-DC converter, a capacitor CF is connected in parallel to the first terminal TO1 and the second terminal TO2 of the
The drain of the
When this step-down DC-DC converter is used, it is necessary to detect the current IL flowing through the inductor L141, the solar cell current IPV, and the solar cell voltage PPV with three sensors during the detection operation.
[0068]
FIGS. 14A to 14D are diagrams illustrating waveforms of respective main parts of the solar
14A shows the PWM signal of the PWM
SCN represents a scan period for detecting the maximum power point Pmax, and TRK represents a follow-up operation period.
[0069]
The difference between the operation of the photovoltaic
[0070]
Further, when it is desired to lower or increase the load voltage by the solar cell voltage, a circuit configuration using a step-up / step-down DC-DC converter as the power conversion circuit 14B as shown in FIG. 15 is suitable.
In the step-up / step-down DC-DC converter, a capacitor CF is connected in parallel to the first terminal TO1 and the second terminal TO2 of the
The drain of the
Even when this step-up / step-down DC-DC converter is used, it is necessary to detect the current IL flowing through the inductor L141, the solar cell current IPV, and the solar cell voltage PPV with three sensors during the detection operation.
[0071]
FIGS. 16A to 16D are diagrams illustrating waveforms of respective main parts of the photovoltaic
The operation waveforms are substantially the same as those shown in FIGS. 15A to 15D, but the PWM signal is turned on and off in the opposite direction.
[0072]
In this way, regardless of the type of power conversion circuit, the change in current flowing through the inductor inserted in the power conversion circuit is used to instantaneously scan the IV characteristics of the solar cell, and based on the results. It is possible to perform high-precision MPPT control of the solar cell by performing follow-up control.
[0073]
In the above-described embodiment, the example in which the follow-up control is performed so that the solar cell current follows the optimum solar cell current at the maximum power point is described. However, the solar cell is applied to the optimum solar cell voltage at the maximum power point. It is also possible to employ a configuration in which tracking control is performed so that the voltage follows.
In this case, the same effect as described above can be obtained.
[0074]
【The invention's effect】
As described above, according to the present invention, the maximum power point can be reliably detected with high accuracy, the amount of generated power can be increased, and the efficiency of power acquisition can be greatly improved.
In addition, there is an advantage that the control characteristic against the load fluctuation is also good.
[Brief description of the drawings]
FIG. 1 is a diagram showing a configuration example of a photovoltaic power generation system employing a conventional hill-climbing method.
FIG. 2 is a diagram for explaining the operation principle of the photovoltaic power generation system of FIG. 1;
FIG. 3 is a configuration diagram showing an embodiment of a photovoltaic power generation system according to the present invention.
FIG. 4 is a diagram showing a main waveform of the photovoltaic power generation system according to the present embodiment.
FIG. 5 is a diagram showing a change (battery load) of solar cell output power in one day in the present control method and the conventional method.
FIG. 6 is a diagram showing response characteristics when the load is a pure resistance RL and the value is changed stepwise from 10Ω → 20Ω → 10Ω to give a sudden load change.
FIG. 7 is a diagram showing an example of response characteristics at the time of sudden change in solar radiation intensity in the present control method.
FIG. 8 is a diagram for comparison with FIG. 7, and is a diagram showing an example of a response characteristic at the time of a sudden change in solar radiation intensity by a conventional hill-climbing method.
FIG. 9 is a diagram showing the followability of a control method when a shadow does not occur on a solar cell panel and when it occurs.
FIG. 10 is a diagram for comparison with FIG. 9 and shows the followability of a conventional hill-climbing method when a shadow does not occur on a solar cell panel.
FIG. 11 is a diagram showing power acquisition performance at low illuminance in this control method.
FIG. 12 is a diagram showing power acquisition characteristics at low illuminance in this control method.
FIG. 13 is a circuit diagram showing a configuration of a step-down DC-DC converter.
FIG. 14 is a diagram showing waveforms of main parts of a photovoltaic power generation system when a step-down DC-DC converter is used as a power conversion circuit.
FIG. 15 is a circuit diagram showing a configuration of a step-up / step-down DC-DC converter.
FIG. 16 is a diagram showing waveforms of main parts of a photovoltaic power generation system when a buck-boost DC-DC converter is used as a power conversion circuit.
[Explanation of symbols]
DESCRIPTION OF
Claims (6)
上記太陽電池の電圧を検出する電圧検出部と、
少なくとも上記太陽電池の電流を検出する電流検出部と、
インダクタと制御信号により導通制御されるスイッチング素子とを含み、上記太陽電池の出力電力値を電力値に変換する電力変換回路と、
制御回路と、を有し、
上記電力変換回路の上記インダクタと上記スイッチング素子は直列に接続され、当該両端がそれぞれ上記太陽電池の上記2端子に接続された回路が形成され、当該回路上に上記電圧検出部および上記電流検出部が配置され、
上記制御回路は、
上記電圧検出部で検出された太陽電池電圧と上記電流検出部で検出された太陽電池電流を受けて、太陽電池の最大電力点を求めるときは、制御信号により上記電力変換回路の上記スイッチング素子をオフ状態に保持させて、上記電力変換回路の上記インダクタを流れる電流の変化によって変化する太陽電池電流が零になったら、上記スイッチング素子をオン状態に保持させて、上記インダクタを流れる電流の変化によって変化する太陽電池電流を零から短絡電流まで変化させて、当該電流−電圧特性をスキャンし最大電力点を検出し、当該スキャンによって得られた最大電力点のときの最適太陽電池電流に太陽電池電流または最適太陽電池電圧に太陽電池電圧を追従させ、得られた最大電力動作点で動作するように上記スイッチング素子のオン・オフ制御を行う
太陽光発電システム。 A solar cell that outputs the required power from two terminals ;
A voltage detector for detecting the voltage of the solar cell;
A current detector for detecting at least the current of the solar cell;
A power conversion circuit that includes an inductor and a switching element that is conductively controlled by a control signal, and that converts an output power value of the solar cell into a power value;
A control circuit,
The inductor and the switching element of the power conversion circuit are connected in series, and a circuit is formed in which both ends are respectively connected to the two terminals of the solar cell, and the voltage detection unit and the current detection unit are formed on the circuit. Is placed,
The control circuit is
Receiving solar battery current detected by the solar cell voltage detected by the voltage detecting unit and said current detecting unit, when determining the maximum power point of the solar cell, the control signal the switching elements of the power converter circuit and is held in the oFF state, when the solar cell current that varies with changes in the current flowing through the inductor of the power conversion circuit becomes zero, thereby holding the switching element into the on state, the change in current flowing through the inductor The changing solar cell current is changed from zero to the short-circuit current, the current-voltage characteristic is scanned to detect the maximum power point, and the solar cell current is obtained as the optimum solar cell current at the maximum power point obtained by the scan. Or, the solar cell voltage is made to follow the optimum solar cell voltage, and the switching element is operated so as to operate at the obtained maximum power operating point. Off control solar power system to perform.
上記スキャン期間のみ動作し、上記電圧検出部で検出された太陽電池電圧と上記電流検出部で検出された太陽電池電流を受けて、上記スキャン期間中は、上記制御信号により上記電力変換回路の上記スイッチング素子をオフ状態に保持させて、上記電力変換回路の上記インダクタを流れる電流の変化によって変化する太陽電池電流が零になったら、上記スイッチング素子をオン状態に保持させて、上記インダクタを流れる電流の変化によって変化する太陽電池電流を零から短絡電流まで変化させて、当該電流−電圧特性をスキャンし最大電力点を検出し、当該スキャンによって得られた最大電力点のときの最適太陽電池電流または最適太陽電池電圧を求める最大電力点検出回路を含み、
上記制御回路は
スキャン期間が終了し、上記最大電力点検出回路が非動作状態に保持され、電力制御がスキャン期間から追従動作期間に移行する
請求項1記載の太陽光発電システム。 The control circuit is
It operates only during the scan period, receives the solar cell voltage detected by the voltage detector and the solar cell current detected by the current detector, and during the scan period, the control signal causes the power conversion circuit to When the switching element is held in the OFF state, and the solar cell current that changes due to the change in the current flowing through the inductor of the power conversion circuit becomes zero, the switching element is held in the ON state, and the current flowing through the inductor By changing the solar cell current that changes due to the change from zero to the short-circuit current, the current-voltage characteristic is scanned to detect the maximum power point, and the optimum solar cell current at the maximum power point obtained by the scan or Including a maximum power point detection circuit to find the optimum solar cell voltage,
The control circuit is
The photovoltaic power generation system according to claim 1 , wherein the scanning period ends, the maximum power point detection circuit is held in a non-operating state, and power control shifts from the scanning period to the follow-up operation period .
請求項1または2記載の太陽光発電システム。The photovoltaic power generation system according to claim 1, wherein the control circuit repeatedly performs the maximum power point detection operation and the tracking operation alternately.
上記制御回路は、上記電圧検出センサ部で検出された太陽電池電圧、上記電流検出センサ部で検出された太陽電池電流、および上記インダクタ電流検出センサ部で検出されたインダクタ電流に基づいて、上記最大電力点の検出動作および追従動作の制御を行う
請求項1、2、または3記載の太陽光発電システム。Further comprising an inductor current detecting sensor unit for detecting a current flowing through the inductor of the power conversion circuit,
The control circuit, based on the voltage detected solar battery voltage detecting sensor unit, the current detected by the detection sensor unit solar cell current and the inductor current sensed inductor current detection sensor unit, the maximum The photovoltaic power generation system according to claim 1, 2, or 3, wherein power point detection operation and tracking operation are controlled.
太陽電池の電圧と少なくとも太陽電池の電流を検出し、
検出した太陽電池電圧と太陽電池電流に基づいて、上記電力変換回路の上記インダクタを流れる電流の変化によって変化する太陽電池電流が零となるように、上記電力変換回路の上記スイッチング素子をオフ状態に保持させ、
上記電力変換回路の上記インダクタを流れる電流の変化によって変化する太陽電池電流が零になったら、上記スイッチング素子をオン状態に保持させて、上記インダクタを流れる電流の変化によって変化する太陽電池電流を零から短絡電流まで変化させて、当該電流−電圧特性をスキャンし最大電力点を検出し、
上記スキャンによって得られた最大電力点のときの最適太陽電池電流に太陽電池電流または最適太陽電池電圧に太陽電池電圧を追従させ、得られた最大電力動作点で動作するように上記スイッチング素子のオン・オフ制御を行う
太陽光発電システムの最大電力点追従制御方法。 A power conversion circuit including an output power value of a solar cell that outputs required power from two terminals , an inductor and a switching element connected in series to the inductor, and both ends of which are respectively connected to the two terminals of the solar cell A maximum power point tracking control method for a photovoltaic power generation system that converts a desired power value and supplies the load to a load,
Detecting a current of at least solar cell to the voltage of the solar cell,
Based on the detected solar cell voltage and solar cell current, the switching element of the power conversion circuit is turned off so that the solar cell current that changes due to the change of the current flowing through the inductor of the power conversion circuit becomes zero. Hold
When the solar cell current that changes due to a change in the current flowing through the inductor of the power conversion circuit becomes zero, the switching element is held in an on state, and the solar cell current that changes due to the change in the current flowing through the inductor is reduced to zero. To the short circuit current, scan the current-voltage characteristics and detect the maximum power point,
The switching element is turned on to operate at the maximum power operating point obtained by causing the solar cell voltage to follow the optimal solar cell current or the optimal solar cell voltage at the maximum power point obtained by the scan. A maximum power point tracking control method for a photovoltaic power generation system that performs off control .
請求項5記載の太陽光発電システムの最大電力点追従制御方法。The maximum power point tracking control method for a photovoltaic power generation system according to claim 5, wherein the maximum power point detection operation and the tracking operation are alternately repeated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003067599A JP4294346B2 (en) | 2003-03-13 | 2003-03-13 | Photovoltaic power generation system and its maximum power point tracking control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003067599A JP4294346B2 (en) | 2003-03-13 | 2003-03-13 | Photovoltaic power generation system and its maximum power point tracking control method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004280220A JP2004280220A (en) | 2004-10-07 |
JP4294346B2 true JP4294346B2 (en) | 2009-07-08 |
Family
ID=33285156
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003067599A Expired - Fee Related JP4294346B2 (en) | 2003-03-13 | 2003-03-13 | Photovoltaic power generation system and its maximum power point tracking control method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4294346B2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102139823A (en) * | 2011-03-28 | 2011-08-03 | 江苏通用电梯有限公司 | Solar photovoltaic (PV) elevator control system with bidirectional power flow |
WO2012026593A1 (en) | 2010-08-27 | 2012-03-01 | 学校法人 幾徳学園 | Solar power generation system, control device used for solar power generation system, and control method and program for the same |
WO2012090242A1 (en) * | 2010-12-27 | 2012-07-05 | 日立アプライアンス株式会社 | Power converter and solar power generation system |
CN102820777A (en) * | 2012-08-20 | 2012-12-12 | 浙江大学 | Boost converter applicable to new energy |
US10355492B2 (en) | 2015-06-02 | 2019-07-16 | Omron Corporation | Rechargeable battery controller |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4556677B2 (en) * | 2005-01-18 | 2010-10-06 | オムロン株式会社 | Power conditioner with built-in curve tracer |
JP4953783B2 (en) * | 2006-11-30 | 2012-06-13 | 三洋電機株式会社 | Converter device and grid interconnection system |
KR101530247B1 (en) * | 2008-09-11 | 2015-06-22 | 동아전기부품 주식회사 | A photovoltaic power generation system for vehicle and a method of controlling power of a photovoltaic power generation system |
KR101516983B1 (en) | 2008-09-11 | 2015-05-04 | 우리산업홀딩스 주식회사 | A method of controlling a photovoltaic power generation system for vehicle |
EP2333635A1 (en) * | 2009-12-14 | 2011-06-15 | Mitsubishi Electric R&D Centre Europe B.V. | Method for obtaining information enabling the determination of a characteristic of a power source |
EP2333634A1 (en) * | 2009-12-14 | 2011-06-15 | Mitsubishi Electric R&D Centre Europe B.V. | Method for obtaining information enabling the determination of a characteristic of a power source |
JP5357803B2 (en) | 2010-02-16 | 2013-12-04 | 株式会社日立産機システム | Solar power system |
JP5344042B2 (en) | 2010-10-06 | 2013-11-20 | トヨタ自動車株式会社 | Solar cell output control device |
JP5335151B2 (en) * | 2010-12-16 | 2013-11-06 | 三菱電機株式会社 | Solar power system |
JP5432937B2 (en) * | 2011-02-23 | 2014-03-05 | 株式会社日立パワーソリューションズ | Solar cell characteristic acquisition circuit and solar cell control device |
KR101635690B1 (en) | 2011-09-26 | 2016-07-01 | 시온덴키 가부시키가이샤 | System using direct-current power source, and direct-current-type microgrid network using same system |
JP2013097596A (en) | 2011-11-01 | 2013-05-20 | Sony Corp | Solar battery system, electronic equipment and structure |
TWI438602B (en) | 2011-12-02 | 2014-05-21 | Ind Tech Res Inst | Maximum power point tracking controllers, maximum power point tracking systems and maximum power point tracking methods |
KR101388698B1 (en) | 2012-04-27 | 2014-04-24 | 성균관대학교산학협력단 | Power converting apparatus, operating method thereof, and solar power generating system |
JP5894870B2 (en) * | 2012-06-22 | 2016-03-30 | 日立アプライアンス株式会社 | Solar power system |
JP6213163B2 (en) * | 2013-01-24 | 2017-10-18 | オムロン株式会社 | Power conditioner, solar cell system, and abnormality determination method |
CN103291593B (en) * | 2013-06-09 | 2016-06-29 | 北京吉阳技术股份有限公司 | A kind of control method being applied to photovoltaic water pump system |
JP6096099B2 (en) * | 2013-11-25 | 2017-03-15 | 日立アプライアンス株式会社 | Photovoltaic power generation system and solar cell module diagnostic method |
CN104113281B (en) * | 2014-06-27 | 2016-06-08 | 武汉日新科技股份有限公司 | Hyperchannel solar module test macro and dual intelligent scanning method |
ES2606103B1 (en) * | 2015-09-17 | 2017-12-28 | Universidad Miguel Hernández De Elche | Multiplier circuit with pulse width modulation to maximize the power delivered by a photovoltaic generator connected to a continuous-continuous converter |
JP6536552B2 (en) | 2016-12-12 | 2019-07-03 | トヨタ自動車株式会社 | Solar power system |
CN106788250B (en) * | 2016-12-19 | 2019-01-04 | 武汉大学 | A kind of spherical shape multi-angle solar energy irradiation observation device and method |
JP2019144953A (en) * | 2018-02-22 | 2019-08-29 | 学校法人幾徳学園 | Solar cell control system |
CN110262621B (en) * | 2019-07-22 | 2024-02-23 | 重庆理工大学 | Solar maximum power collection circuit and quick search method |
CN112217475B (en) * | 2020-09-29 | 2022-07-15 | 阳光新能源开发股份有限公司 | IV curve scanning method and optical storage system |
-
2003
- 2003-03-13 JP JP2003067599A patent/JP4294346B2/en not_active Expired - Fee Related
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104617875A (en) * | 2010-08-27 | 2015-05-13 | 学校法人几德学园 | Solar power generation system, control device used for solar power generation system, and control method and program for the same |
WO2012026593A1 (en) | 2010-08-27 | 2012-03-01 | 学校法人 幾徳学園 | Solar power generation system, control device used for solar power generation system, and control method and program for the same |
CN103097974A (en) * | 2010-08-27 | 2013-05-08 | 学校法人几德学园 | Solar power generation system, control device used for solar power generation system, and control method and program for the same |
JP5503745B2 (en) * | 2010-08-27 | 2014-05-28 | 学校法人幾徳学園 | Photovoltaic power generation system, control device used in solar power generation system, control method and program thereof |
US9143082B2 (en) | 2010-08-27 | 2015-09-22 | School Judical Person Ikutokugakuen | Solar power generation system, control device used for solar power generation system, and control method and program for same |
US8908404B2 (en) | 2010-08-27 | 2014-12-09 | School Judicial Person Ikutokugakuen | Solar power generation system, control device used for solar power generation system, and control method and program for same |
CN103097974B (en) * | 2010-08-27 | 2015-03-11 | 学校法人几德学园 | Solar power generation system, control device used for solar power generation system, and control method and program for the same |
WO2012090242A1 (en) * | 2010-12-27 | 2012-07-05 | 日立アプライアンス株式会社 | Power converter and solar power generation system |
JP5589096B2 (en) * | 2010-12-27 | 2014-09-10 | 日立アプライアンス株式会社 | Power converter and photovoltaic power generation system |
CN102139823A (en) * | 2011-03-28 | 2011-08-03 | 江苏通用电梯有限公司 | Solar photovoltaic (PV) elevator control system with bidirectional power flow |
CN102820777A (en) * | 2012-08-20 | 2012-12-12 | 浙江大学 | Boost converter applicable to new energy |
CN102820777B (en) * | 2012-08-20 | 2014-08-27 | 浙江大学 | Boost converter applicable to new energy |
US10355492B2 (en) | 2015-06-02 | 2019-07-16 | Omron Corporation | Rechargeable battery controller |
Also Published As
Publication number | Publication date |
---|---|
JP2004280220A (en) | 2004-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4294346B2 (en) | Photovoltaic power generation system and its maximum power point tracking control method | |
JP5503745B2 (en) | Photovoltaic power generation system, control device used in solar power generation system, control method and program thereof | |
Liu et al. | Advanced algorithm for MPPT control of photovoltaic systems | |
Kumar et al. | A comprehensive review on grid-tied solar photovoltaic system | |
AU2011336974B2 (en) | Inverter array with localized inverter control | |
Jotham Jeremy et al. | Non-isolated conventional DC-DC converter comparison for a photovoltaic system: A review | |
JP5320144B2 (en) | Solar cell maximum output power tracking control device | |
Verma et al. | An isolated solar power generation using boost converter and boost inverter | |
WO2012090242A1 (en) | Power converter and solar power generation system | |
CN109802556B (en) | Photovoltaic power generation system with photovoltaic inverter and starting method of inverter | |
Dursun et al. | Analysis and performance comparison of DC-DC power converters used in photovoltaic systems | |
TW201020712A (en) | Frequency-varied incremental conductance maximum power point tracking controller and algorithm for PV converter | |
JP2010177554A (en) | Solar power generating apparatus | |
Patil et al. | Design and development of MPPT algorithm for high efficient DC-DC converter for solar energy system connected to grid | |
KR102295755B1 (en) | Power System and control method with Buck-Boost Converter | |
JP3949350B2 (en) | Interconnection device | |
Anuraag et al. | Design and Comparative Study of DC-DC Quadratic Buck-Boost Converter and Cascaded Buck-Boost Converter | |
Ravindran et al. | Implementation in arm microcontroller to maximize the power output of solar panel using Hill Climbing Algorithm | |
Chy et al. | Analysing efficiency of DC-DC converters joined to PV system run by intelligent controller | |
Başoğlu | Realization of a low cost and fast boost converter based MPPT for PV system | |
Itako | New iv characteristics scan-type MPPT control method for PV generation system | |
Devi et al. | Modeling and simulation of incremental conductance MPPT using self lift SEPIC converter | |
del Rosario Rivera-Espinosa et al. | A high step-up DC-DC converter with MPPT for PV application | |
CN113162019A (en) | Photovoltaic power generation system and control method thereof | |
JP2015197870A (en) | Photovoltaic power generation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060313 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060410 |
|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20060512 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20060512 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20081216 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090213 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090310 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090408 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120417 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4294346 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120417 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20180417 Year of fee payment: 9 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |