US20180059701A1 US15/254,856 US201615254856A US2018059701A1 US 20180059701 A1 US20180059701 A1 US 20180059701A1 US 201615254856 A US201615254856 A US 201615254856A US 2018059701 A1 US2018059701 A1 US 2018059701A1
Authority
US
United States
Prior art keywords
demand response
event
load
loads
configuration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US15/254,856
Inventor
Victor Lavrisiuk
Michael Haling
Debra Lynn Pugel
Robert Warner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honeywell International Inc
Original Assignee
Honeywell International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honeywell International Inc filed Critical Honeywell International Inc
Priority to US15/254,856 priority Critical patent/US20180059701A1/en
Assigned to HONEYWELL INTERNATIONAL INC. reassignment HONEYWELL INTERNATIONAL INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HALING, MICHAEL, LAVRISIUK, VICTOR, PUGEL, DEBRA LYNN, WARNER, ROBERT
Publication of US20180059701A1 publication Critical patent/US20180059701A1/en
Priority to US16/517,521 priority patent/US11042178B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24015Monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present disclosure relates to devices, methods, and systems for providing demand response.
  • Demand response can include voluntary changes in electricity usage of an electric utility customer (e.g., facility) to better match the demand for power with the supply.
  • Demand response can allow for the reduction of load on electrical grids based on signals that are sent to facilities. For example, a demand response request sent to a facility by an electricity supplier or other grid management entity can result in some number of loads in that facility being shut down and/or running at reduced capacity.
  • a demand response event can have different intensity levels.
  • Previous approaches to demand response may not provide sufficient flexibility to accommodate different event intensity levels while maintaining for adequate control of facility equipment without impact to conditions. For instance, facility loads may be set to take one action only during demand response despite differing event severity levels. Additionally, there may be multiple settings for demand response located in different locations in user interfaces resulting in an over-complicated workflow. Previous user interfaces for demand response configuration in a facility may not provide a way for building managers to quickly configure a large number of loads while also being able to customize a demand response strategy. Further, previous interfaces may not provide a summary of the demand response strategy that has been configured for a given facility.
  • FIG. 1 illustrates a system for providing demand response in accordance with one or more embodiments of the present disclosure.
  • FIG. 2 illustrates a user interface associated with monitoring demand control in accordance with one or more embodiments of the present disclosure.
  • FIG. 3 illustrates an interface associated with configuring loads in accordance with one or more embodiments of the present disclosure.
  • FIG. 4 illustrates an interface associated with scheduling limiting events in accordance with one or more embodiments of the present disclosure.
  • FIG. 5 illustrates an interface associated with modifying peak targets in accordance with one or more embodiments of the present disclosure.
  • FIG. 6 illustrates an interface associated with modifying demand control settings in accordance with one or more embodiments of the present disclosure.
  • one or more embodiments include a device having instructions stored thereon executable to receive an indication of a demand response event, determine, based on a configuration made using a user interface, an action to be taken by a load of a facility in response to the demand response event, communicate the determined action to a controller associated with the load, and monitor a status of the action as the action is taken.
  • Demand response can include voluntary changes in electricity usage by an electric utility customer (e.g., facility) in response to a request by an electricity supplier or other grid management entity; this request typically occurs when there is heavy demand for electricity on the electrical grid, and is intended to prevent temporary electricity shortfalls.
  • a demand response request is referred to as a demand response event, and can be sent to a customer via email or text message, or via an automated signal, wherein the latter may be referred to as automated demand response (ADR).
  • ADR automated demand response
  • a demand response event can have different intensity levels.
  • Previous approaches to demand response may not provide sufficient flexibility to accommodate different event intensity levels while maintaining for adequate control of facility equipment without impact to conditions. For instance, facility loads may be set to take one action only during demand response despite differing event severity levels. Additionally, there may be multiple settings for demand response located in different locations in user interfaces resulting in an over-complicated workflow. Previous user interfaces for demand response configuration in a facility may not provide a way for building managers to quickly configure a large number of loads while also being able to customize a demand response strategy. Further, previous interfaces may not provide a summary of the demand response strategy that has been configured for a given facility.
  • Demand response in accordance with one or more embodiments of the present disclosure can provide flexibility in controlling a facility. For instance, loads may be set to take different actions according to differing event seventies. Building managers using embodiments here can configure a large number of loads, visualize their demand response strategy, and customize that strategy, all at a glance.
  • Embodiments of the present disclosure can include a comprehensive ADR system provided to a user that allows for easier configuration compared to previous approaches.
  • ADR events from a demand response automation server (DRAS) can be parsed (e.g., by an executive control module) and passed along to a demand control service component (sometimes referred to herein simply as “computing device.”).
  • the computing device can take information about operation mode (e.g., event severity), target (e.g., required electricity reduction), target type (e.g., electricity reduction or firm kW threshold), etc. to determine what actions the facility (e.g., devices and/or loads of the facility) should take. Those determined actions can be passed to equipment controllers, which can execute them.
  • Embodiments herein include a user interface that allows monitoring of the whole facility, as well as quick configuration of loads and/or settings.
  • the user interface can include monitoring screens that show information about all loads of the facility, configuration screens (e.g., tabs) that allow all facility settings to be configured at once, and load configuration screens (e.g., pop-ups) that allow bulk configuration of loads.
  • configuration screens e.g., tabs
  • load configuration screens e.g., pop-ups
  • embodiments here can allow the selection of different strategies including, for example, load rolling and load staging. Different strategies can be assigned to each of the different operation modes for events.
  • embodiments herein can utilize virtual shed groups instead of fixed registers, wherein loads can be assigned a group number. Virtual shed groups can allow for a larger number of participating loads compared to previous approaches.
  • a demand limiting schedule in accordance with embodiments herein can allow for more scheduling flexibility in that each alternate schedule and/or special event can have a separate set of limiting targets for greater control.
  • a demand settings component can provide a level of abstraction between the service (e.g., the computing device) and each load. As a result, new load types and/or load strategies can be added without modifying the service, and third party loads can be used by configuring a strategy (e.g., in wiresheet) and using the demand settings component's shed output to drive logic.
  • an event can include a signal and/or a request to reduce load.
  • An event can be a signal in response to which a number of loads are shut down or run at reduced capacity.
  • events can be sent (e.g., issued) from a utility.
  • events can be scheduled (e.g., manually scheduled) by facilities themselves. It is noted that where the singular “facility” is used herein, such reference can refer to any number of structures, buildings, plants, refineries, sites, etc.
  • Load includes electricity use by one or more devices and/or systems.
  • loads can refer to units and/or systems associated with heating, ventilation, and air conditioning (HVAC), refrigeration, lighting, and/or industrial equipment, among others.
  • HVAC heating, ventilation, and air conditioning
  • a” or “a number of” something can refer to one or more such things.
  • a number of loads can refer to one or more loads.
  • FIG. 1 illustrates a system 100 for providing demand response in accordance with one or more embodiments of the present disclosure.
  • the system 100 can include a demand control service (DCS) component 102 .
  • the DCS 102 can be a computing device, for instance.
  • DCS 102 can be, for example, a laptop computer, a desktop computer, or a mobile device (e.g., a mobile phone, a personal digital assistant, etc.), among other types of computing devices.
  • a laptop computer e.g., a laptop computer, a desktop computer, or a mobile device (e.g., a mobile phone, a personal digital assistant, etc.), among other types of computing devices.
  • a mobile device e.g., a mobile phone, a personal digital assistant, etc.
  • DCS 102 includes a memory 103 and a processor 105 coupled to memory 103 .
  • Memory 103 can be any type of storage medium that can be accessed by processor 105 to perform various examples of the present disclosure.
  • memory 103 can be a non-transitory computer readable medium having computer readable instructions (e.g., computer program instructions) stored thereon that are executable by processor 105 to provide demand response in accordance with one or more embodiments of the present disclosure.
  • Memory 103 can be volatile or nonvolatile memory. Memory 103 can also be removable (e.g., portable) memory, or non-removable (e.g., internal) memory.
  • memory 103 can be random access memory (RAM) (e.g., dynamic random access memory (DRAM) and/or phase change random access memory (PCRAM)), read-only memory (ROM) (e.g., electrically erasable programmable read-only memory (EEPROM) and/or compact-disc read-only memory (CD-ROM)), flash memory, a laser disc, a digital versatile disc (DVD) or other optical disk storage, and/or a magnetic medium such as magnetic cassettes, tapes, or disks, among other types of memory.
  • RAM random access memory
  • DRAM dynamic random access memory
  • PCRAM phase change random access memory
  • ROM read-only memory
  • EEPROM electrically erasable programmable read-only memory
  • CD-ROM compact-disc read-only memory
  • flash memory a laser disc, a digital
  • memory 103 is illustrated as being located in DCS 102 , embodiments of the present disclosure are not so limited.
  • memory 103 can also be located internal to another computing resource (e.g., enabling computer readable instructions to be downloaded over the Internet or another wired or wireless connection).
  • DCS 102 can also include a user interface 106 .
  • User interface 106 can include, for example, a display (e.g., a screen).
  • the display can be, for instance, a touch-screen (e.g., the display can include touch-screen capabilities).
  • User interface 106 (e.g., the display of user interface 106 ) can provide (e.g., display and/or present) information to a user of DCS 102 .
  • user interface 106 can provide the user interfaces 210 , 326 , 432 , 534 , and/or 636 , described herein in connection with FIGS. 2-6 to the user.
  • DCS 102 can receive information from the user of DCS 102 through an interaction with the user via user interface 106 .
  • DCS 102 e.g., the display of user interface 106
  • the user can enter the input into DCS 102 using, for instance, a mouse and/or keyboard associated with DCS 102 , or by touching the display of user interface 106 in embodiments in which the display includes touch-screen capabilities (e.g., embodiments in which the display is a touch screen).
  • the DCS can receive an indication of a demand response event (illustrated in FIG. 1 as “demand response signal” and hereinafter referred to as “event 106 ”).
  • an event can include a signal and/or a request to adjust (e.g., reduce) load.
  • An event can be a signal in response to which a number of loads are shut down or run at reduced capacity.
  • operations of one or more devices can be adjusted. Such adjustment may be made in order to meet a usage target (e.g., kilowatt hour target).
  • one or more devices can be deactivated (e.g., according to a schedule).
  • setpoints associated with one or more devices can be modified.
  • events can be sent (e.g., issued) from a utility.
  • events can be passed from a virtual top node (VTN) and/or aggregator.
  • VTN virtual top node
  • a demand response signal 106 can be received from a demand response automation server.
  • events can be scheduled (e.g., manually scheduled) by facilities themselves. Accordingly, an indication of an event can be received based on a manually-scheduled demand response event 104 .
  • the system 100 can include a plurality of loads (referred to collectively as “loads 108 ”).
  • the system 100 can include a first load 108 - 1 , a second load 108 - 2 (e.g., “Rooftop Unit”), a third node 108 - 3 (e.g., “Third Party Device”), and a fourth load 108 - 4 (e.g., “BACnet device”).
  • four loads 108 are shown in FIG. 1 , embodiments of the present disclosure can include more or fewer loads.
  • the types of loads illustrated in FIG. 1 e.g., “Rooftop Unit,” “Third Party Device,” “BACnet device” are used as example types; embodiments of the present disclosure are not limited to the types illustrated in FIG. 1 .
  • Each of the loads 108 can be in communication with the DCS 102 via a demand settings component.
  • the demand settings component(s) can receive command(s) to shed load from the DCS 102 and can communicate status information back to the DCS 102 .
  • the DCS 102 can receive events as described above and determine which loads are to be reduced and/or how the reduction is to take place. Such information can be communicated to the demand settings component(s) via the shed command(s).
  • the corresponding demand settings components can direct modifications to control settings in order to reduce load.
  • the shed command output of its demand settings component can be linked to a Boolean output point (e.g., an arbitrary Boolean output point).
  • a wiresheet logic setup can be configured.
  • the demand settings component of the load 108 - 3 can be linked to an output point.
  • the wiresheet logic can use additional information from the demand settings component of the load 108 - 3 .
  • FIG. 2 illustrates a user interface 210 associated with monitoring demand control in accordance with one or more embodiments of the present disclosure.
  • the interface 210 can be displayed when the selectable display element (e.g., tab) 212 is selected.
  • the interface 210 can include a current status portion 216 , a views portion, and a demand loads overview portion 218 . Selection of another tab 214 can cause the display of a demand control settings interface, discussed further below in connection with FIG. 6 .
  • the current status portion 216 can include information associated with a current status of a demand response event associated with a facility. Such information, can include, for instance, current activity state (e.g., level) of the event, current operation mode, current power usage, current shed target, current baseline, etc. Such information may be general in nature in that it may not be particular to one or more specific loads but may refer to the loads of the facility of a whole, for instance.
  • current activity state e.g., level
  • Such information may be general in nature in that it may not be particular to one or more specific loads but may refer to the loads of the facility of a whole, for instance.
  • the views portion can include selectable display elements which, when selected, can cause the display of other user interfaces. For instance, selection of the event level configuration button 220 can cause the display of an interface 326 discussed below in connection with FIG. 3 . Selection of the limiting schedule button 224 can cause the display of an interface 432 discussed below in connection with FIG. 4 . Selection of the limiting targets button 222 can cause the display of an interface 534 discussed below in connection with FIG. 5 .
  • the demand loads overview portion 218 can include information associated with the demand response event particular to each of a plurality of loads associated with the facility. Such information can be specific to a current event. For instance, each row in the demand loads overview portion 218 can correspond to an individual load in the facility having a demand settings component (previously discussed). For each load, information can be provided in a dashboard-style at-a-glance format such as, for example, demand control enabled/disabled status, shed group identification, command status, actual status, time in shed, time in restore, zone temperature, active setpoint, load feedback, etc. Accordingly, a user can be made aware of the status of the event as it pertains to individual loads. At times in which an event is not occurring, information may be blanked out, for instance.
  • loads can be configured by selecting the event level configuration button 220 .
  • the interface can then provide a pop-up window with a table displaying settings for each operation mode and allow for configuration.
  • FIG. 3 illustrates an interface 326 associated with configuring loads in accordance with one or more embodiments of the present disclosure.
  • the interface 326 can be provided following the selection of the event level configuration button 220 on the interface 210 , previously described in connection with FIG. 2 .
  • the interface 326 can receive configuration modifications to each of the plurality of loads, for instance.
  • the configuration modifications can include modifications to a plurality of settings for each of a plurality of operation modes associated with the plurality of loads
  • the interface 326 can include a number of portions (e.g., tabs) corresponding to different operation modes.
  • operation modes can include “limiting,” “normal,” “moderate,” “high,” and/or “special,” though embodiments of the present disclosure are not so limited. Selection of a particular operation mode can allow for configuration of loads in that mode. For instance, as shown in FIG. 3 , the “normal” event settings tab is selected.
  • Embodiments of the present disclosure can allow for the configurations of multiple loads to be modified at once. For instance, the loads “RTU Sales Front” and “RTU Sales Middle” are both selected in the example illustrated in FIG. 3 . Also as shown, selection of the “shed strategy” configuration column can cause the display of a pop-up window 328 allowing for the modification of that configuration for both loads simultaneously.
  • Selection of the demand response schedule button of the interface 210 can cause the display of an interface associated with scheduling manual demand response events.
  • normal, moderate, high, and/or special events can be scheduled.
  • alternate and/or special events can be set up in addition to scheduled (e.g., weekly) events.
  • FIG. 4 illustrates an interface 432 associated with scheduling limiting events in accordance with one or more embodiments of the present disclosure.
  • Selection of the limiting schedule button 224 can cause the display of the interface 432 , for instance.
  • a limiting event can be scheduled for a particular period of time, at a particular time, on one or more days of a week.
  • the limiting event(s) can be “peak,” “off-peak,” or “alt-peak” events according to some embodiments.
  • Such differentiation can allow for flexibility in a limiting strategy by accounting for time of varying usage. For example, during the middle of a summer day, a peak limiting event may be scheduled instead of an off-peak event to prevent the facility from shedding a particular amount (e.g., too much for comfort).
  • embodiments herein can allow for the creation and/or modification of customizable schedules.
  • Each schedule can have its own set of peak values (e.g., 3 peak values).
  • Such embodiments can provide the ability for an enterprise to batch push a limiting schedule to a number of different facilities while allowing each facility to maintain its own peak values, which may vary based on location, for instance.
  • FIG. 5 illustrates an interface 534 associated with modifying peak targets in accordance with one or more embodiments of the present disclosure.
  • Selection of the limiting targets button 222 from the user interface 210 can cause the display of interface 534 , for instance.
  • the interface 534 can be a pop-up window that allows for the editing of peak targets in bulk.
  • the interface 534 can display the peak targets for a weekly schedule.
  • the interface 534 can display the peak targets for each special event.
  • the interface 534 can display the peak targets for one or more alternate schedules. Selection of one or more schedules (as shown in FIG. 5 ) can allow the modification of one or more aspects of the peak target(s).
  • FIG. 6 illustrates an interface 636 associated with modifying demand control settings in accordance with one or more embodiments of the present disclosure.
  • the settings modified using the interface 636 can be modifications nonspecific to any one particular load, for instance (e.g., settings that relate to the ADR system as a whole). Selection of the tab 214 , previously described in connection with FIG. 2 and illustrated as tab 614 in FIG. 6 , can cause the display of the interface 636 , for instance.
  • the interface 636 can include a control settings portion 638 , a recovery portion 640 , a stage start portion 642 , a load rolling/staging portion 644 , a limits portion 646 , a demand limiting portion 648 , a demand response configuration portion 650 , and a baseline portion 652 , though embodiments of the present disclosure are not so limited.
  • the control settings portion 638 can be configured to allow for enabling and/or disabling demand limiting.
  • the control settings portion 638 can be configured to set a demand response type (e.g., none, manual, or ADR service).
  • the recovery portion 640 can be configured to set a recovery time taken after an event ends to gradually restore each of a plurality of loads, for instance.
  • a baseline percentage can be set, which can specify a starting recovery target.
  • a restore delay time can be set, which can specify a time in between the restoration of loads.
  • the stage start portion 642 can include portion configured to modify a startup duration, which can indicate how long it may take for all loads to be restored following a station startup.
  • a restore per interval value can be set, which can designate how many loads are to be restored for each interval.
  • the load rolling/staging portion 644 can allow settings for shed delay and/or restore delay. Such delays may refer to a respective amount of delay between shedding and restoring loads individually.
  • Rotation delay can allow the modification of an amount of time between in-group rotation.
  • Group shed delay can allow the modification of a delay between shedding full groups (e.g., an initial behavior of a staging strategy until a target is met).
  • “Restore from” can allow the selection of whether loads restored during staging are to be restored in an order they were shed or in an order of the most recently shed load being restored first.
  • Rotation interval can refer to a load rolling strategy and can allow the modification of an interval between switching which group is shed.
  • the limits portion 646 can allow modification of shed and restore thresholds.
  • the limits portion 646 can allow modification of an overlimit alert amount. For example, an overlimit alert can trigger an alarm if current demand surpasses a demand target for a particular period of time (e.g., a threshold-exceeding period of time).
  • the demand limiting portion 648 can allow modification of the shed delay for limiting.
  • the demand limiting portion 648 can allow modification of the restore delay for limiting.
  • the demand response configuration portion 650 can allow a selection between a load rolling strategy and a load staging strategy.
  • Demand limiting may use a load staging strategy by default, for instance. If, for example, a facility is using a manual demand response mode, a manual target for each operation mode can be configured and/or modified.
  • the baseline portion 652 can allow modification of information associated with a baseline.
  • the baseline portion 652 can allow configuration of baseline binning.
  • Load staging is a strategy in which loads can be divided into shed groups based on importance. Loads designated as more critical loads may tend to be placed in higher-numbered shed groups. Less important loads may be placed in lower-numbered shed groups. Other loads, such as lighting, for instance, may be placed in a continuous shed group. When an event begins, all continuous loads can be shed, in some embodiments. The first group can then be shed. If a group rotation delay elapses and the current usage remains above a threshold (e.g., a “shed above” usage), a second group can be shed. This process can continue until the current usage falls below a “shed above” range or all groups have been shed.
  • a threshold e.g., a “shed above” usage
  • a restore delay timer can be activated. Once the restore delay timer elapses, a load can be restored and the timer can be restarted. If the current usage rises above the “shed above” range again, one load can be shed at a time. If current usage remains within a deadband range, then a partially shed group can rotate which loads are shed.
  • Load rolling is a strategy in which loads can be placed in different groups with no preference of importance.
  • load rolling allows a single group to be shed at a time, but rotates one whole group every time the rotation interval timer elapses. If the facility's demand remains above a restore target, the rotation can continue spreading the effects of the demand curtailment among the configured shed groups by shedding another group and restoring the first group, one group at a time. If the demand drops below the restore target and remains below the restore target for at least one rotation interval, the load rolling strategy can terminate the periodic group rotation and loads can begin to be restored. The load rolling strategy can then return to group rotation if the demand rises above a shed target. If the demand remains between the shed target and the restore target, the current mode can be continued, either rotating the shed group or waiting for the demand to rise into the shed range.
  • ADR may include a number of (e.g., 2) “shed registers” with a fixed number of slots to which loads are attached. Such loads may have a single response (e.g., setpoint adjust or load shed off) irrespective of what type of event was received.
  • embodiments of the present disclosure can utilize virtual shed groups which can be read at the time of an event. Each load can have a different shed group for each different operation mode, thereby allowing a greater deal of flexibility when configuring a strategy.
  • the DCS can query demand settings component(s) in the facility to determine which loads can be acted upon based on their shed group for the current operation mode.
  • each load can respond differently depending on the type of event.
  • a load may undergo a setpoint adjustment of two degrees.
  • a moderate event for instance, when demand reduction is more urgently needed, the load could be shut off entirely.
  • a normal event can utilize a higher number of (e.g., four) shed groups for gradual shedding to meet its target, while a high event may use a lower number of (e.g., 2) shed groups for a quicker response.
  • Embodiments of the present disclosure can allow for more logical configuration than previous approaches.
  • a multitude of aspects of ADR control can be overseen and/or modified from one place (e.g., the computing device described above in connection with FIG. 1 ).
  • the computing device can configure aspects of the facility as a whole (e.g., strategy, timers, etc.), and individual loads themselves (e.g., shed strategies, shed groups, etc.).
  • the computing device can configure devices and allow for a user to check on a device that may not be operating as expected.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Power Engineering (AREA)
  • Electromagnetism (AREA)
  • Radar, Positioning & Navigation (AREA)
  • General Engineering & Computer Science (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

Devices, methods, and systems for providing demand response are described herein. One device includes instructions executable to receive an indication of a demand response event, determine, based on a configuration made using a user interface, an action to be taken by a load of a facility in response to the demand response event, communicate the determined action to a controller associated with the load, and monitor a status of the action as the action is taken.

Description

    TECHNICAL FIELD
  • The present disclosure relates to devices, methods, and systems for providing demand response.
  • BACKGROUND
  • Demand response can include voluntary changes in electricity usage of an electric utility customer (e.g., facility) to better match the demand for power with the supply. Demand response can allow for the reduction of load on electrical grids based on signals that are sent to facilities. For example, a demand response request sent to a facility by an electricity supplier or other grid management entity can result in some number of loads in that facility being shut down and/or running at reduced capacity.
  • During demand response when equipment is shutdown or running at reduced capacity, it can be possible to adversely affect conditions in the facility. In addition, a demand response event can have different intensity levels. Previous approaches to demand response may not provide sufficient flexibility to accommodate different event intensity levels while maintaining for adequate control of facility equipment without impact to conditions. For instance, facility loads may be set to take one action only during demand response despite differing event severity levels. Additionally, there may be multiple settings for demand response located in different locations in user interfaces resulting in an over-complicated workflow. Previous user interfaces for demand response configuration in a facility may not provide a way for building managers to quickly configure a large number of loads while also being able to customize a demand response strategy. Further, previous interfaces may not provide a summary of the demand response strategy that has been configured for a given facility.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 illustrates a system for providing demand response in accordance with one or more embodiments of the present disclosure.
  • FIG. 2 illustrates a user interface associated with monitoring demand control in accordance with one or more embodiments of the present disclosure.
  • FIG. 3 illustrates an interface associated with configuring loads in accordance with one or more embodiments of the present disclosure.
  • FIG. 4 illustrates an interface associated with scheduling limiting events in accordance with one or more embodiments of the present disclosure.
  • FIG. 5 illustrates an interface associated with modifying peak targets in accordance with one or more embodiments of the present disclosure.
  • FIG. 6 illustrates an interface associated with modifying demand control settings in accordance with one or more embodiments of the present disclosure.
  • DETAILED DESCRIPTION
  • Devices, methods, and systems for providing demand response are described herein. For example, one or more embodiments include a device having instructions stored thereon executable to receive an indication of a demand response event, determine, based on a configuration made using a user interface, an action to be taken by a load of a facility in response to the demand response event, communicate the determined action to a controller associated with the load, and monitor a status of the action as the action is taken.
  • Demand response, as referred to herein, can include voluntary changes in electricity usage by an electric utility customer (e.g., facility) in response to a request by an electricity supplier or other grid management entity; this request typically occurs when there is heavy demand for electricity on the electrical grid, and is intended to prevent temporary electricity shortfalls. A demand response request is referred to as a demand response event, and can be sent to a customer via email or text message, or via an automated signal, wherein the latter may be referred to as automated demand response (ADR). When a demand response event is sent to a customer, it is the customer's responsibility to take actions to reduce electrical usage for some period of time specified in the event message—this typically means that some number of electrical loads in one or more customer facilities are shut down and/or run at reduced capacity.
  • During demand response when equipment is shutdown or running at reduced capacity, it can be possible to adversely affect conditions in the facility. In addition, a demand response event can have different intensity levels. Previous approaches to demand response may not provide sufficient flexibility to accommodate different event intensity levels while maintaining for adequate control of facility equipment without impact to conditions. For instance, facility loads may be set to take one action only during demand response despite differing event severity levels. Additionally, there may be multiple settings for demand response located in different locations in user interfaces resulting in an over-complicated workflow. Previous user interfaces for demand response configuration in a facility may not provide a way for building managers to quickly configure a large number of loads while also being able to customize a demand response strategy. Further, previous interfaces may not provide a summary of the demand response strategy that has been configured for a given facility.
  • Demand response (e.g., demand control) in accordance with one or more embodiments of the present disclosure can provide flexibility in controlling a facility. For instance, loads may be set to take different actions according to differing event seventies. Building managers using embodiments here can configure a large number of loads, visualize their demand response strategy, and customize that strategy, all at a glance.
  • Embodiments of the present disclosure can include a comprehensive ADR system provided to a user that allows for easier configuration compared to previous approaches. In some embodiments, for instance, ADR events from a demand response automation server (DRAS) can be parsed (e.g., by an executive control module) and passed along to a demand control service component (sometimes referred to herein simply as “computing device.”). The computing device can take information about operation mode (e.g., event severity), target (e.g., required electricity reduction), target type (e.g., electricity reduction or firm kW threshold), etc. to determine what actions the facility (e.g., devices and/or loads of the facility) should take. Those determined actions can be passed to equipment controllers, which can execute them. Embodiments herein include a user interface that allows monitoring of the whole facility, as well as quick configuration of loads and/or settings.
  • As discussed further below, the user interface can include monitoring screens that show information about all loads of the facility, configuration screens (e.g., tabs) that allow all facility settings to be configured at once, and load configuration screens (e.g., pop-ups) that allow bulk configuration of loads.
  • In addition, embodiments here can allow the selection of different strategies including, for example, load rolling and load staging. Different strategies can be assigned to each of the different operation modes for events. Moreover, embodiments herein can utilize virtual shed groups instead of fixed registers, wherein loads can be assigned a group number. Virtual shed groups can allow for a larger number of participating loads compared to previous approaches.
  • A demand limiting schedule in accordance with embodiments herein can allow for more scheduling flexibility in that each alternate schedule and/or special event can have a separate set of limiting targets for greater control. A demand settings component can provide a level of abstraction between the service (e.g., the computing device) and each load. As a result, new load types and/or load strategies can be added without modifying the service, and third party loads can be used by configuring a strategy (e.g., in wiresheet) and using the demand settings component's shed output to drive logic.
  • As referred to herein, an event can include a signal and/or a request to reduce load. An event can be a signal in response to which a number of loads are shut down or run at reduced capacity. In some embodiments, events can be sent (e.g., issued) from a utility. In some embodiments, events can be scheduled (e.g., manually scheduled) by facilities themselves. It is noted that where the singular “facility” is used herein, such reference can refer to any number of structures, buildings, plants, refineries, sites, etc.
  • Load, as referred to herein, includes electricity use by one or more devices and/or systems. For example, loads can refer to units and/or systems associated with heating, ventilation, and air conditioning (HVAC), refrigeration, lighting, and/or industrial equipment, among others.
  • In the following detailed description, reference is made to the accompanying drawings that form a part hereof. The drawings show by way of illustration how one or more embodiments of the disclosure may be practiced.
  • These embodiments are described in sufficient detail to enable those of ordinary skill in the art to practice one or more embodiments of this disclosure. It is to be understood that other embodiments may be utilized and that process changes may be made without departing from the scope of the present disclosure.
  • As will be appreciated, elements shown in the various embodiments herein can be added, exchanged, combined, and/or eliminated so as to provide a number of additional embodiments of the present disclosure. The proportion and the relative scale of the elements provided in the figures are intended to illustrate the embodiments of the present disclosure, and should not be taken in a limiting sense.
  • The figures herein follow a numbering convention in which the first digit or digits correspond to the drawing figure number and the remaining digits identify an element or component in the drawing. Similar elements or components between different figures may be identified by the use of similar digits.
  • As used herein, “a” or “a number of” something can refer to one or more such things. For example, “a number of loads” can refer to one or more loads.
  • FIG. 1 illustrates a system 100 for providing demand response in accordance with one or more embodiments of the present disclosure. As shown in FIG. 1, the system 100 can include a demand control service (DCS) component 102. The DCS 102 can be a computing device, for instance.
  • DCS 102 can be, for example, a laptop computer, a desktop computer, or a mobile device (e.g., a mobile phone, a personal digital assistant, etc.), among other types of computing devices.
  • As shown in FIG. 1, DCS 102 includes a memory 103 and a processor 105 coupled to memory 103. Memory 103 can be any type of storage medium that can be accessed by processor 105 to perform various examples of the present disclosure. For example, memory 103 can be a non-transitory computer readable medium having computer readable instructions (e.g., computer program instructions) stored thereon that are executable by processor 105 to provide demand response in accordance with one or more embodiments of the present disclosure.
  • Memory 103 can be volatile or nonvolatile memory. Memory 103 can also be removable (e.g., portable) memory, or non-removable (e.g., internal) memory. For example, memory 103 can be random access memory (RAM) (e.g., dynamic random access memory (DRAM) and/or phase change random access memory (PCRAM)), read-only memory (ROM) (e.g., electrically erasable programmable read-only memory (EEPROM) and/or compact-disc read-only memory (CD-ROM)), flash memory, a laser disc, a digital versatile disc (DVD) or other optical disk storage, and/or a magnetic medium such as magnetic cassettes, tapes, or disks, among other types of memory.
  • Further, although memory 103 is illustrated as being located in DCS 102, embodiments of the present disclosure are not so limited. For example, memory 103 can also be located internal to another computing resource (e.g., enabling computer readable instructions to be downloaded over the Internet or another wired or wireless connection).
  • As shown in FIG. 1, DCS 102 can also include a user interface 106. User interface 106 can include, for example, a display (e.g., a screen). The display can be, for instance, a touch-screen (e.g., the display can include touch-screen capabilities).
  • User interface 106 (e.g., the display of user interface 106) can provide (e.g., display and/or present) information to a user of DCS 102. For example, user interface 106 can provide the user interfaces 210, 326, 432, 534, and/or 636, described herein in connection with FIGS. 2-6 to the user.
  • Additionally, DCS 102 can receive information from the user of DCS 102 through an interaction with the user via user interface 106. For example, DCS 102 (e.g., the display of user interface 106) can receive input from the user via user interface 106. The user can enter the input into DCS 102 using, for instance, a mouse and/or keyboard associated with DCS 102, or by touching the display of user interface 106 in embodiments in which the display includes touch-screen capabilities (e.g., embodiments in which the display is a touch screen).
  • The DCS can receive an indication of a demand response event (illustrated in FIG. 1 as “demand response signal” and hereinafter referred to as “event 106”). As previously discussed, an event can include a signal and/or a request to adjust (e.g., reduce) load. An event can be a signal in response to which a number of loads are shut down or run at reduced capacity. In order to reduce loads, operations of one or more devices can be adjusted. Such adjustment may be made in order to meet a usage target (e.g., kilowatt hour target). In some embodiments, one or more devices can be deactivated (e.g., according to a schedule). In some embodiments, setpoints associated with one or more devices can be modified.
  • In some embodiments, events can be sent (e.g., issued) from a utility. In some embodiments, events can be passed from a virtual top node (VTN) and/or aggregator. For example, a demand response signal 106 can be received from a demand response automation server. In some embodiments, events can be scheduled (e.g., manually scheduled) by facilities themselves. Accordingly, an indication of an event can be received based on a manually-scheduled demand response event 104.
  • The system 100 can include a plurality of loads (referred to collectively as “loads 108”). For instance, the system 100 can include a first load 108-1, a second load 108-2 (e.g., “Rooftop Unit”), a third node 108-3 (e.g., “Third Party Device”), and a fourth load 108-4 (e.g., “BACnet device”). Though four loads 108 are shown in FIG. 1, embodiments of the present disclosure can include more or fewer loads. Additionally, the types of loads illustrated in FIG. 1 (e.g., “Rooftop Unit,” “Third Party Device,” “BACnet device” are used as example types; embodiments of the present disclosure are not limited to the types illustrated in FIG. 1.
  • Each of the loads 108 can be in communication with the DCS 102 via a demand settings component. In some embodiments the demand settings component(s) can receive command(s) to shed load from the DCS 102 and can communicate status information back to the DCS 102. The DCS 102 can receive events as described above and determine which loads are to be reduced and/or how the reduction is to take place. Such information can be communicated to the demand settings component(s) via the shed command(s). For the Rooftop Unit load 108-2 and the BACnet device load 108-4, the corresponding demand settings components can direct modifications to control settings in order to reduce load.
  • For the load 108-1, the shed command output of its demand settings component can be linked to a Boolean output point (e.g., an arbitrary Boolean output point). For the Third Party Device load 108-3, a wiresheet logic setup can be configured. For instance, the demand settings component of the load 108-3 can be linked to an output point. In some embodiments, the wiresheet logic can use additional information from the demand settings component of the load 108-3.
  • FIG. 2 illustrates a user interface 210 associated with monitoring demand control in accordance with one or more embodiments of the present disclosure. The interface 210 can be displayed when the selectable display element (e.g., tab) 212 is selected. As shown in FIG. 2, the interface 210 can include a current status portion 216, a views portion, and a demand loads overview portion 218. Selection of another tab 214 can cause the display of a demand control settings interface, discussed further below in connection with FIG. 6.
  • The current status portion 216 can include information associated with a current status of a demand response event associated with a facility. Such information, can include, for instance, current activity state (e.g., level) of the event, current operation mode, current power usage, current shed target, current baseline, etc. Such information may be general in nature in that it may not be particular to one or more specific loads but may refer to the loads of the facility of a whole, for instance.
  • The views portion can include selectable display elements which, when selected, can cause the display of other user interfaces. For instance, selection of the event level configuration button 220 can cause the display of an interface 326 discussed below in connection with FIG. 3. Selection of the limiting schedule button 224 can cause the display of an interface 432 discussed below in connection with FIG. 4. Selection of the limiting targets button 222 can cause the display of an interface 534 discussed below in connection with FIG. 5.
  • The demand loads overview portion 218 can include information associated with the demand response event particular to each of a plurality of loads associated with the facility. Such information can be specific to a current event. For instance, each row in the demand loads overview portion 218 can correspond to an individual load in the facility having a demand settings component (previously discussed). For each load, information can be provided in a dashboard-style at-a-glance format such as, for example, demand control enabled/disabled status, shed group identification, command status, actual status, time in shed, time in restore, zone temperature, active setpoint, load feedback, etc. Accordingly, a user can be made aware of the status of the event as it pertains to individual loads. At times in which an event is not occurring, information may be blanked out, for instance.
  • Once loads are added, they can be configured by selecting the event level configuration button 220. The interface can then provide a pop-up window with a table displaying settings for each operation mode and allow for configuration.
  • FIG. 3 illustrates an interface 326 associated with configuring loads in accordance with one or more embodiments of the present disclosure. The interface 326 can be provided following the selection of the event level configuration button 220 on the interface 210, previously described in connection with FIG. 2. The interface 326 can receive configuration modifications to each of the plurality of loads, for instance. The configuration modifications can include modifications to a plurality of settings for each of a plurality of operation modes associated with the plurality of loads
  • The interface 326 can include a number of portions (e.g., tabs) corresponding to different operation modes. In some embodiments, operation modes can include “limiting,” “normal,” “moderate,” “high,” and/or “special,” though embodiments of the present disclosure are not so limited. Selection of a particular operation mode can allow for configuration of loads in that mode. For instance, as shown in FIG. 3, the “normal” event settings tab is selected.
  • Embodiments of the present disclosure can allow for the configurations of multiple loads to be modified at once. For instance, the loads “RTU Sales Front” and “RTU Sales Middle” are both selected in the example illustrated in FIG. 3. Also as shown, selection of the “shed strategy” configuration column can cause the display of a pop-up window 328 allowing for the modification of that configuration for both loads simultaneously.
  • Selection of the demand response schedule button of the interface 210, previously described in connection with FIG. 1, can cause the display of an interface associated with scheduling manual demand response events. In some embodiments, normal, moderate, high, and/or special events can be scheduled. In some embodiments, alternate and/or special events can be set up in addition to scheduled (e.g., weekly) events.
  • FIG. 4 illustrates an interface 432 associated with scheduling limiting events in accordance with one or more embodiments of the present disclosure. Selection of the limiting schedule button 224 (previously described in connection with FIG. 2) can cause the display of the interface 432, for instance. A limiting event can be scheduled for a particular period of time, at a particular time, on one or more days of a week. The limiting event(s) can be “peak,” “off-peak,” or “alt-peak” events according to some embodiments. Such differentiation can allow for flexibility in a limiting strategy by accounting for time of varying usage. For example, during the middle of a summer day, a peak limiting event may be scheduled instead of an off-peak event to prevent the facility from shedding a particular amount (e.g., too much for comfort).
  • In contrast with previous approaches, where users may be restricted to 12 alternate schedules representing different months, embodiments herein can allow for the creation and/or modification of customizable schedules. Each schedule can have its own set of peak values (e.g., 3 peak values). Such embodiments can provide the ability for an enterprise to batch push a limiting schedule to a number of different facilities while allowing each facility to maintain its own peak values, which may vary based on location, for instance.
  • FIG. 5 illustrates an interface 534 associated with modifying peak targets in accordance with one or more embodiments of the present disclosure. Selection of the limiting targets button 222 from the user interface 210, previously described in connection with FIG. 2, can cause the display of interface 534, for instance. In some embodiments, the interface 534 can be a pop-up window that allows for the editing of peak targets in bulk. The interface 534 can display the peak targets for a weekly schedule. The interface 534 can display the peak targets for each special event. The interface 534 can display the peak targets for one or more alternate schedules. Selection of one or more schedules (as shown in FIG. 5) can allow the modification of one or more aspects of the peak target(s).
  • FIG. 6 illustrates an interface 636 associated with modifying demand control settings in accordance with one or more embodiments of the present disclosure. The settings modified using the interface 636 can be modifications nonspecific to any one particular load, for instance (e.g., settings that relate to the ADR system as a whole). Selection of the tab 214, previously described in connection with FIG. 2 and illustrated as tab 614 in FIG. 6, can cause the display of the interface 636, for instance.
  • The interface 636 can include a control settings portion 638, a recovery portion 640, a stage start portion 642, a load rolling/staging portion 644, a limits portion 646, a demand limiting portion 648, a demand response configuration portion 650, and a baseline portion 652, though embodiments of the present disclosure are not so limited.
  • The control settings portion 638 can be configured to allow for enabling and/or disabling demand limiting. The control settings portion 638 can be configured to set a demand response type (e.g., none, manual, or ADR service).
  • The recovery portion 640 can be configured to set a recovery time taken after an event ends to gradually restore each of a plurality of loads, for instance. A baseline percentage can be set, which can specify a starting recovery target. A restore delay time can be set, which can specify a time in between the restoration of loads.
  • The stage start portion 642 can include portion configured to modify a startup duration, which can indicate how long it may take for all loads to be restored following a station startup. A restore per interval value can be set, which can designate how many loads are to be restored for each interval.
  • The load rolling/staging portion 644 can allow settings for shed delay and/or restore delay. Such delays may refer to a respective amount of delay between shedding and restoring loads individually. Rotation delay can allow the modification of an amount of time between in-group rotation. Group shed delay can allow the modification of a delay between shedding full groups (e.g., an initial behavior of a staging strategy until a target is met). “Restore from” can allow the selection of whether loads restored during staging are to be restored in an order they were shed or in an order of the most recently shed load being restored first. Rotation interval can refer to a load rolling strategy and can allow the modification of an interval between switching which group is shed.
  • The limits portion 646 can allow modification of shed and restore thresholds. The limits portion 646 can allow modification of an overlimit alert amount. For example, an overlimit alert can trigger an alarm if current demand surpasses a demand target for a particular period of time (e.g., a threshold-exceeding period of time).
  • The demand limiting portion 648 can allow modification of the shed delay for limiting. The demand limiting portion 648 can allow modification of the restore delay for limiting.
  • The demand response configuration portion 650 can allow a selection between a load rolling strategy and a load staging strategy. Demand limiting may use a load staging strategy by default, for instance. If, for example, a facility is using a manual demand response mode, a manual target for each operation mode can be configured and/or modified.
  • The baseline portion 652 can allow modification of information associated with a baseline. For example, the baseline portion 652 can allow configuration of baseline binning.
  • Load staging, as referred to herein, is a strategy in which loads can be divided into shed groups based on importance. Loads designated as more critical loads may tend to be placed in higher-numbered shed groups. Less important loads may be placed in lower-numbered shed groups. Other loads, such as lighting, for instance, may be placed in a continuous shed group. When an event begins, all continuous loads can be shed, in some embodiments. The first group can then be shed. If a group rotation delay elapses and the current usage remains above a threshold (e.g., a “shed above” usage), a second group can be shed. This process can continue until the current usage falls below a “shed above” range or all groups have been shed. If the current usage falls below a “restore below” range, a restore delay timer can be activated. Once the restore delay timer elapses, a load can be restored and the timer can be restarted. If the current usage rises above the “shed above” range again, one load can be shed at a time. If current usage remains within a deadband range, then a partially shed group can rotate which loads are shed.
  • Load rolling, as referred to herein, is a strategy in which loads can be placed in different groups with no preference of importance. In some embodiments, load rolling allows a single group to be shed at a time, but rotates one whole group every time the rotation interval timer elapses. If the facility's demand remains above a restore target, the rotation can continue spreading the effects of the demand curtailment among the configured shed groups by shedding another group and restoring the first group, one group at a time. If the demand drops below the restore target and remains below the restore target for at least one rotation interval, the load rolling strategy can terminate the periodic group rotation and loads can begin to be restored. The load rolling strategy can then return to group rotation if the demand rises above a shed target. If the demand remains between the shed target and the restore target, the current mode can be continued, either rotating the shed group or waiting for the demand to rise into the shed range.
  • In previous approaches, ADR may include a number of (e.g., 2) “shed registers” with a fixed number of slots to which loads are attached. Such loads may have a single response (e.g., setpoint adjust or load shed off) irrespective of what type of event was received. In contrast, embodiments of the present disclosure can utilize virtual shed groups which can be read at the time of an event. Each load can have a different shed group for each different operation mode, thereby allowing a greater deal of flexibility when configuring a strategy. When a demand response action is taken by the DCS (previously discussed in connection with FIG. 1), the DCS can query demand settings component(s) in the facility to determine which loads can be acted upon based on their shed group for the current operation mode. Accordingly, each load can respond differently depending on the type of event. For a normal event, for instance, a load may undergo a setpoint adjustment of two degrees. For a moderate event, for instance, when demand reduction is more urgently needed, the load could be shut off entirely. Similarly, a normal event can utilize a higher number of (e.g., four) shed groups for gradual shedding to meet its target, while a high event may use a lower number of (e.g., 2) shed groups for a quicker response.
  • Embodiments of the present disclosure can allow for more logical configuration than previous approaches. A multitude of aspects of ADR control can be overseen and/or modified from one place (e.g., the computing device described above in connection with FIG. 1). For instance, the computing device can configure aspects of the facility as a whole (e.g., strategy, timers, etc.), and individual loads themselves (e.g., shed strategies, shed groups, etc.). Additionally, the computing device can configure devices and allow for a user to check on a device that may not be operating as expected.
  • Although specific embodiments have been illustrated and described herein, those of ordinary skill in the art will appreciate that any arrangement calculated to achieve the same techniques can be substituted for the specific embodiments shown. This disclosure is intended to cover any and all adaptations or variations of various embodiments of the disclosure.
  • It is to be understood that the above description has been made in an illustrative fashion, and not a restrictive one. Combination of the above embodiments, and other embodiments not specifically described herein will be apparent to those of skill in the art upon reviewing the above description.
  • The scope of the various embodiments of the disclosure includes any other applications in which the above structures and methods are used. Therefore, the scope of various embodiments of the disclosure should be determined with reference to the appended claims, along with the full range of equivalents to which such claims are entitled.
  • In the foregoing Detailed Description, various features are grouped together in example embodiments illustrated in the figures for the purpose of streamlining the disclosure. This method of disclosure is not to be interpreted as reflecting an intention that the embodiments of the disclosure require more features than are expressly recited in each claim.
  • Rather, as the following claims reflect, inventive subject matter lies in less than all features of a single disclosed embodiment. Thus, the following claims are hereby incorporated into the Detailed Description, with each claim standing on its own as a separate embodiment.

Claims (20)

What is claimed:
1. A non-transitory computer readable medium having computer readable instructions stored thereon which, when executed by a processor, cause the processor to:
receive an indication of a demand response event;
determine, based on a configuration made using a user interface, an action to be taken by a load of a facility in response to the demand response event;
communicate the determined action to a controller associated with the load; and
monitor a status of the action as the action is taken.
2. The medium of claim 1, wherein the indication is a demand response signal received from a demand response automation server.
3. The medium of claim 1, wherein the demand response event is a manually-scheduled demand response event.
4. The method of claim 1, wherein the configuration made using the user interface includes a configuration to each of a plurality of operation modes associated with the load.
5. The method of claim 4, wherein the configuration made using the user interface is a same configuration as another configuration made using the user interface to another load, and wherein the configuration and the other configuration are made simultaneously.
6. The method of claim 3, wherein the manually-scheduled demand response event is one of: a normal event, a moderate event, a high event, and a special event.
7. The method of claim 1, wherein the demand response event is a limiting event.
8. The method of claim 1, wherein the demand response event is a limiting event, and wherein the method includes receiving a schedule associated with the limiting event having a set of peak values.
9. The method of claim 1, wherein the configuration includes placing the load in a shed group based on an importance associated with the load.
10. The method of claim 1, wherein the action to be taken by the load is determined based, at least in part, on a user selection of a load staging strategy or a load rolling strategy.
11. A system for providing demand response, comprising:
a processor; and
a memory configured to store instructions which, when executed by the processor, cause the processor to:
provide an interface to:
monitor and display a current status of a demand response event associated with a facility;
display information associated with the demand response event particular to each of a plurality of loads associated with the facility; and
receive configuration modifications to each of the plurality of loads.
12. The computing device of claim 11, wherein the displayed current status of the demand response event includes an indication of a current activity level of the demand response event.
13. The computing device of claim 11, wherein the displayed current status of the demand response event includes an indication of a current operation mode associated with the plurality of loads.
14. The computing device of claim 11, wherein the configuration modifications include modifications to a plurality of settings for each of a plurality of operation modes associated with the plurality of loads.
15. The computing device of claim 11, wherein the configuration modifications include modifications to a plurality of settings for a manual demand response event.
16. A non-transitory computer readable medium having computer readable instructions stored thereon which, when executed by a processor, cause the processor to:
provide an interface to:
display a current status of a demand response event associated with a facility;
display information associated with the demand response event particular to each of a plurality of loads of the facility;
receive configuration modifications to each of the plurality of loads; and
receive configuration modifications nonspecific to any one of the plurality of loads, the nonspecific configuration modifications including an indication of load rolling or load staging.
17. The computer readable medium of claim 16, wherein the specific configuration modifications include modifications to a scheduled limiting event.
18. The computer readable medium of claim 16, wherein the received nonspecific configuration modifications include a selection of one of a load rolling mode and a load staging mode.
19. The computer readable medium of claim 16, wherein the received nonspecific configuration modifications include modifications to shed thresholds and restore thresholds.
20. The computer readable medium of claim 16, wherein the received nonspecific configuration modifications include a modification to a recovery time taken after an end of the demand response event to restore each of the plurality of loads.
US15/254,856 2016-09-01 2016-09-01 Providing demand response Abandoned US20180059701A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US15/254,856 US20180059701A1 (en) 2016-09-01 2016-09-01 Providing demand response
US16/517,521 US11042178B2 (en) 2016-09-01 2019-07-19 Providing demand response

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US15/254,856 US20180059701A1 (en) 2016-09-01 2016-09-01 Providing demand response

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US16/517,521 Continuation US11042178B2 (en) 2016-09-01 2019-07-19 Providing demand response

Publications (1)

Publication Number Publication Date
US20180059701A1 true US20180059701A1 (en) 2018-03-01

Family

ID=61242434

Family Applications (2)

Application Number Title Priority Date Filing Date
US15/254,856 Abandoned US20180059701A1 (en) 2016-09-01 2016-09-01 Providing demand response
US16/517,521 Active US11042178B2 (en) 2016-09-01 2019-07-19 Providing demand response

Family Applications After (1)

Application Number Title Priority Date Filing Date
US16/517,521 Active US11042178B2 (en) 2016-09-01 2019-07-19 Providing demand response

Country Status (1)

Country Link
US (2) US20180059701A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180241210A1 (en) * 2015-08-12 2018-08-23 Kyocera Corporation Management server, management method and management system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6653153B2 (en) * 2015-10-01 2020-02-26 株式会社日立製作所 Power demand adjustment plan management device

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6577962B1 (en) * 2000-09-28 2003-06-10 Silicon Energy, Inc. System and method for forecasting energy usage load
US20070220907A1 (en) * 2006-03-21 2007-09-27 Ehlers Gregory A Refrigeration monitor unit
US20100179708A1 (en) * 2008-09-15 2010-07-15 General Electric Company Energy management of household appliances
US20100191487A1 (en) * 2009-01-26 2010-07-29 Geneva Clean Tech Inc. Energy usage monitoring with remote display and automatic detection of appliance including graphical user interface
US20100292856A1 (en) * 2009-05-15 2010-11-18 Lincoln Mamoru Fujita Method and system for managing a load demand on an electrical grid
US20110172845A1 (en) * 2006-07-11 2011-07-14 Regen Energy Inc. Method and apparatus for managing an energy consuming load
US20110172846A1 (en) * 2006-07-11 2011-07-14 Regen Energy Inc. Method and apparatus for managing an energy consuming load
US20120101651A1 (en) * 2007-12-19 2012-04-26 David Haynes Achieving energy demand response using price signals and a load control transponder
US20120271475A1 (en) * 2005-03-08 2012-10-25 Jackson Kit Wang Systems and methods for modifying utility usage
US20120330473A1 (en) * 2011-06-24 2012-12-27 Bobbie Jo Meredith System and method for managing loads
US20130002020A1 (en) * 2011-06-29 2013-01-03 Elwha LLC, a limited liability company of the State of Delaware Systems and methods for controlled startup of electrical devices loading a power line
US20130268136A1 (en) * 2012-04-10 2013-10-10 Robert J. Cox Distributed electricity demand-reserve prediction
US20130345891A1 (en) * 2011-03-08 2013-12-26 General Electric Company Household energy management system
US20140178843A1 (en) * 2012-12-20 2014-06-26 U.S. Army Research Laboratory Method and apparatus for facilitating attention to a task
US20150276253A1 (en) * 2008-10-08 2015-10-01 Rey Montalvo Method and system for fully automated enterprise control of local power usage
US9898025B2 (en) * 2006-03-30 2018-02-20 Intel Corporation Balancing power supply and demand

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7324876B2 (en) 2001-07-10 2008-01-29 Yingco Electronic Inc. System for remotely controlling energy distribution at local sites
WO2005040992A2 (en) 2003-10-24 2005-05-06 Square D Company Intelligent power management control system
WO2009036439A2 (en) * 2007-09-13 2009-03-19 Gridpoint, Inc. User interface for demand side energy management
US8073558B2 (en) 2007-10-05 2011-12-06 Honeywell International Inc Critical resource notification system and interface device
US8782190B2 (en) * 2009-07-17 2014-07-15 Honeywell International, Inc. Demand response management system
US9680308B2 (en) * 2011-05-20 2017-06-13 Siemens Aktiengesellschaft Bidirectional demand response control
US8417391B1 (en) * 2011-12-15 2013-04-09 Restore Nv Automated demand response energy management system
US9807099B2 (en) * 2013-03-15 2017-10-31 Google Inc. Utility portals for managing demand-response events

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6577962B1 (en) * 2000-09-28 2003-06-10 Silicon Energy, Inc. System and method for forecasting energy usage load
US20120271475A1 (en) * 2005-03-08 2012-10-25 Jackson Kit Wang Systems and methods for modifying utility usage
US20070220907A1 (en) * 2006-03-21 2007-09-27 Ehlers Gregory A Refrigeration monitor unit
US9898025B2 (en) * 2006-03-30 2018-02-20 Intel Corporation Balancing power supply and demand
US20130245853A1 (en) * 2006-07-11 2013-09-19 Regen Energy Inc. Method and apparatus for managing an energy consuming load
US20110172845A1 (en) * 2006-07-11 2011-07-14 Regen Energy Inc. Method and apparatus for managing an energy consuming load
US20110172846A1 (en) * 2006-07-11 2011-07-14 Regen Energy Inc. Method and apparatus for managing an energy consuming load
US20120101651A1 (en) * 2007-12-19 2012-04-26 David Haynes Achieving energy demand response using price signals and a load control transponder
US20100179708A1 (en) * 2008-09-15 2010-07-15 General Electric Company Energy management of household appliances
US20150276253A1 (en) * 2008-10-08 2015-10-01 Rey Montalvo Method and system for fully automated enterprise control of local power usage
US20100191487A1 (en) * 2009-01-26 2010-07-29 Geneva Clean Tech Inc. Energy usage monitoring with remote display and automatic detection of appliance including graphical user interface
US20100292856A1 (en) * 2009-05-15 2010-11-18 Lincoln Mamoru Fujita Method and system for managing a load demand on an electrical grid
US20130345891A1 (en) * 2011-03-08 2013-12-26 General Electric Company Household energy management system
US20120330473A1 (en) * 2011-06-24 2012-12-27 Bobbie Jo Meredith System and method for managing loads
US20130002020A1 (en) * 2011-06-29 2013-01-03 Elwha LLC, a limited liability company of the State of Delaware Systems and methods for controlled startup of electrical devices loading a power line
US20130268136A1 (en) * 2012-04-10 2013-10-10 Robert J. Cox Distributed electricity demand-reserve prediction
US20140178843A1 (en) * 2012-12-20 2014-06-26 U.S. Army Research Laboratory Method and apparatus for facilitating attention to a task

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180241210A1 (en) * 2015-08-12 2018-08-23 Kyocera Corporation Management server, management method and management system

Also Published As

Publication number Publication date
US11042178B2 (en) 2021-06-22
US20190346871A1 (en) 2019-11-14

Similar Documents

Publication Publication Date Title
US9124132B2 (en) Automated demand response gateway
KR101970029B1 (en) Automated demand response system
US10152076B2 (en) System and method for aggregation of controllable distributed energy assets
US7886166B2 (en) User interface for demand side energy management
US9524529B2 (en) Interval analysis tool for energy consumption
CA2761416C (en) Building energy consumption analysis system
US20190081479A1 (en) Configuration systems and methods for power control systems
US10401810B2 (en) Performance assessment device for monitoring and comparing attributes of a building management system over time
US10341132B2 (en) Performance assessment device for evaluating a performance of a building management system
US20130123996A1 (en) Method and system for improving the effectiveness of planned power consumption demand response events
US11042178B2 (en) Providing demand response
US20180113682A1 (en) Building control manager with integrated engineering tool and controller application file application program interface (api)
US9454141B2 (en) Real time capacity monitoring for measurement and verification of demand side management
JP2015156785A (en) energy management system
US20180216842A1 (en) Systems and methods for monitoring and controlling an energy plant
US20180316517A1 (en) Building management system with user interactivity analytics
US20180245810A1 (en) Providing demand response
Kirby et al. Spinning reserve from hotel load response
JP2018106431A (en) Facility equipment operation plan generation apparatus and method
JP5508250B2 (en) Energy saving support device
US8463616B2 (en) Scheduling a process according to time-varying input prices
US10503192B2 (en) Energy consumption modeling
US10309713B2 (en) Scheduling defrost events and linking refrigeration circuits in a refrigeration system
US20140351013A1 (en) Ancillary service bid generation systems and methods
JP2023012107A (en) Virtual consumer computer, DR simulation system, virtual consumer program, and DR server formation method

Legal Events

Date Code Title Description
AS Assignment

Owner name: HONEYWELL INTERNATIONAL INC., NEW JERSEY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LAVRISIUK, VICTOR;HALING, MICHAEL;PUGEL, DEBRA LYNN;AND OTHERS;REEL/FRAME:039618/0017

Effective date: 20160901

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION