JP5082450B2 - Power supply equipment - Google Patents

Power supply equipment Download PDF

Info

Publication number
JP5082450B2
JP5082450B2 JP2007004083A JP2007004083A JP5082450B2 JP 5082450 B2 JP5082450 B2 JP 5082450B2 JP 2007004083 A JP2007004083 A JP 2007004083A JP 2007004083 A JP2007004083 A JP 2007004083A JP 5082450 B2 JP5082450 B2 JP 5082450B2
Authority
JP
Japan
Prior art keywords
bus
power
current
load
circuit breaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007004083A
Other languages
Japanese (ja)
Other versions
JP2008168795A (en
Inventor
秀夫 渡邉
正 上村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
Original Assignee
Meidensha Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp filed Critical Meidensha Corp
Priority to JP2007004083A priority Critical patent/JP5082450B2/en
Publication of JP2008168795A publication Critical patent/JP2008168795A/en
Application granted granted Critical
Publication of JP5082450B2 publication Critical patent/JP5082450B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Description

本発明は、発電所または変電所から遮断器を介して負荷群に給電する給電設備に係り、特に一時的な過負荷電流による遮断器の自己遮断を防止する方式に関する。   The present invention relates to a power supply facility that supplies power to a load group from a power plant or a substation via a circuit breaker, and more particularly to a method for preventing circuit breaker self-interruption due to temporary overload current.

図3は直流き電変電所を例として従来技術の構成を示す。交流電源から変圧器1を通して受電し、この変圧器1の出力を整流装置2で直流電力に変換し、直流の電源母線になるき電線3を通して各線区に直流き電を行う。き電線3と区間別および上り/下り線別にした各トロリー線(負荷母線)4との間には、き電線の過電流保護装置としての直流遮断器(直流高速遮断器)5が設けられ、各トロリー線4から在線する電車6に給電を行っている。   FIG. 3 shows the configuration of the prior art using a DC feeder substation as an example. The power is received from the AC power source through the transformer 1, the output of the transformer 1 is converted into DC power by the rectifier 2, and DC power is supplied to each line section through the feeder 3 that becomes a DC power source bus. A DC circuit breaker (DC high-speed circuit breaker) 5 is provided as an overcurrent protection device for the feeder line between the feeder line 3 and each trolley line (load bus) 4 for each section and for each up / down line. Electric power is supplied from the trolley lines 4 to the trains 6 existing.

このような直流き電系統において、各き電区間に多くの電車が位置して力行運転と回生運転を繰り返すため、変電所からみてき電電流(フィーダ電流)が大きく変動する。また、変電所から遠隔の位置では電車の力行によるき電電圧の大きな降下、電車の回生によるき電電圧の大きな上昇も起きる。   In such a DC feeding system, since many trains are located in each feeding section and repeats the power running operation and the regenerative operation, the electricity current (feeder current) varies greatly from the substation. In addition, at a position remote from the substation, a large drop in feeding voltage due to train power running and a large rise in feeding voltage due to train regeneration occur.

電気二重層キャパシタを適用したトロリー線の電圧降下対策や回生電力吸収対策のための直流電鉄用電力貯蔵装置の検討がなされている(例えば、特許文献1参照)。この電力貯蔵装置は、電気二重層キャパシタと充放電器の組で構成され、変電所から遠隔した位置でき電線に併設し、き電線電圧の上昇/降下に際して電気二重層キャパシタによる電力吸収/電力放電を行うことで、き電線の電圧降下を抑制すると共に、電車からの回生電力を吸収してき電線の電圧上昇による回生失効を防止する。なお、電気二重層キャパシタに代えて、二次電池や電力用コンデンサなどの直流蓄電装置とする場合もある。   Studies have been made on power storage devices for DC railways for measures against voltage drop and regenerative power absorption of trolley wires using an electric double layer capacitor (see, for example, Patent Document 1). This power storage device is composed of a pair of electric double layer capacitor and charger / discharger, which can be located remotely from the substation and is attached to the electric wire, and power absorption / discharge by the electric double layer capacitor when the feeder voltage rises / falls By suppressing the voltage drop of the feeder line, the regenerative power from the train is absorbed and the regeneration invalidation due to the voltage rise of the feeder line is prevented. Instead of the electric double layer capacitor, a DC power storage device such as a secondary battery or a power capacitor may be used.

一方、変電所からみて一時的な過負荷電流には直流遮断器5の自己遮断で保護されるが、負荷増による定常的な過負荷電流の発生に対しては、直流遮断器5を電流定格の高いものに交換することで、直流遮断器の不要な過電流遮断を無くすと共に、系統の停電故障を回避する方法がある。   On the other hand, from the viewpoint of the substation, the temporary overload current is protected by the self-interruption of the DC circuit breaker 5. However, the DC circuit breaker 5 is rated for the current overload due to the increase in load. There is a method of eliminating the unnecessary overcurrent interruption of the DC circuit breaker and avoiding the power failure of the system by replacing it with a higher one.

また、直流遮断器によるき電線の過負荷電流発生の判定は、過負荷電流判定回路のメモリに判定の閾値となる直流遮断器の自己遮断動作のための基準電流値を記憶しておき、この基準電流値とき電線電流検出値の比較を行い、き電線電流検出値が前記基準電流値を越えたときに過負荷電流としているが、このときのメモリの基準電流値を高めることで、定常的な過負荷電流にも直流遮断器の交換を不要にして過電流遮断を防止する方法があり、装置の耐量特性によって保護特性を決定する過電流保護装置もある(例えば、特許文献2参照)。   In addition, the determination of the overload current occurrence of the feeder by the DC circuit breaker is made by storing the reference current value for the self-interruption operation of the DC circuit breaker serving as a determination threshold in the memory of the overload current determination circuit. When the reference current value is compared with the wire current detection value, and the feeder current detection value exceeds the reference current value, the overload current is determined. By increasing the memory reference current value at this time, There is a method for preventing overcurrent interruption by eliminating the need to replace a DC circuit breaker even for an overload current, and there is an overcurrent protection device that determines a protection characteristic based on a withstand characteristic of the device (for example, see Patent Document 2).

その他に、落雷等による電力系統の電圧低下をコンデンサで補償する装置(以下、瞬時電圧低下補償装置)がある(例えば、特許文献3参照)。
特開2000−233669号公報 特開平11−122803号公報 特開2002−10528号公報
In addition, there is a device that compensates for a voltage drop in the power system caused by a lightning strike or the like (hereinafter referred to as an instantaneous voltage drop compensation device) (for example, see Patent Document 3).
JP 2000-233669 A Japanese Patent Laid-Open No. 11-122803 JP 2002-10528 A

前記のように、直流き電変電所のフィーダ電流は、将来的な負荷電流の増大に対応できるようにするため、直流遮断器には定格電流の最大仕様(5kA)のものが多く採用され、負荷電流増にもその交換を不要にしている。   As described above, the feeder current of a DC feeder substation is often used with a maximum rated current specification (5 kA) as a DC circuit breaker so that it can cope with future increases in load current. The replacement is also unnecessary for increasing the load current.

しかし、直流遮断器の自己遮断のための基準電流値(過負荷電流判定の閾値)を記憶するメモリは、一般的には10kAを最大値としているが、特許文献2のように、き電電流の増大による誤動作対策として、このメモリ値を装置の耐量特性に基づき変更することは、過負荷電流耐量の優れた装置では不要な過電流遮断を防止できるが、その反面、遮断器のフレームサイズの変更などを伴い、装置の構造上などから、簡単に実現できない。   However, a memory that stores a reference current value (overload current determination threshold value) for self-interruption of the DC circuit breaker generally has a maximum value of 10 kA. Changing the memory value based on the device's withstand characteristics as a measure against malfunction due to an increase in the number of devices can prevent unnecessary overcurrent interruption in devices with excellent overload current tolerance, but on the other hand, the frame size of the circuit breaker Due to changes, etc., it cannot be easily realized due to the structure of the device.

このため、さらに大電流定格の直流遮断器への要求もあるが、10kAを越える過負荷電流は、数秒程度と短時間(例えば電鉄負荷の場合、1〜数秒)であり、この瞬時的大電流のみ遮断器の定格を上げることは、コスト、大きさの面から不利であり、合理的ではないとの考えから、適用されていない。   For this reason, there is a demand for a DC breaker with a higher current rating, but the overload current exceeding 10 kA is about a few seconds and short time (for example, 1 to several seconds in the case of a railway load). Only increasing the rating of the circuit breaker is disadvantageous in terms of cost and size, and is not applied because it is not reasonable.

以上の問題点は、直流給電設備に限られるものでなく、交流変電所の電源母線から交流遮断器を介して負荷母線に接続し、負荷母線から負荷群に給電する交流給電設備にもある。例えば、交流き電系統やクレーンおよびエレベータの巻上機など、起動電流が大きく瞬時大電流となる交流給電設備があり、前記交流給電設備では一時的な過負荷電流が遮断器を流れて誤った保護動作及び停電が起こらないように、遮断器のフレームサイズを定めて設計を行っているが、複数の電車や巻上機によって引き起こる過負荷電流の増大には遮断器交換によるフレームサイズの変更なくして対処できない。   The above problems are not limited to the DC power supply equipment, but also exist in the AC power supply equipment that connects the power bus of the AC substation to the load bus via the AC circuit breaker and supplies power to the load group from the load bus. For example, there is an AC power supply facility that has a large starting current and an instantaneous high current, such as an AC feeder system, crane and elevator hoisting machine. In the AC power supply facility, a temporary overload current flows through the circuit breaker and is erroneous. The circuit breaker frame size is determined so that protection operation and power outage do not occur, but the increase in overload current caused by multiple trains and hoisting machines can be changed by replacing the circuit breaker. I can't cope without it.

本発明の目的は、遮断器の交換を不要にし、また、遮断器の自己遮断動作のための基準電流値を変更することなく、一時的な過負荷電流による誤った保護動作および停電を回避できる給電設備を提供することにある。   An object of the present invention is to eliminate the need for replacement of a circuit breaker, and to avoid erroneous protection operation and power failure due to temporary overload current without changing the reference current value for the self-breaking operation of the circuit breaker. It is to provide power supply equipment.

本発明は、前記の課題を解決するため、一時的な過負荷電流そのものが遮断器の定格電流を越えるのを防止する電力貯蔵装置を変電所に併設したもので、以下の構成を特徴とする。なお、電力貯蔵装置は、直流給電設備または交流給電設備に適用できるものである。   In order to solve the above-mentioned problems, the present invention includes a power storage device that prevents a temporary overload current itself from exceeding the rated current of the circuit breaker, and is characterized by the following configuration. . The power storage device can be applied to a DC power supply facility or an AC power supply facility.

(1)変電所の電源母線から遮断器を介して負荷母線に接続し、負荷母線から負荷群に給電する給電設備において、
前記遮断器に流れる過負荷電流を電流検出器で検出し、負荷母線に発生する一時的な過負荷電流が前記遮断器の定格電流を越えようとするときに、該過負荷電流を前記遮断器の定格電流以下に抑制するよう、直流蓄電装置から負荷母線に給電する電力貯蔵装置を備えたことを特徴とする。
(1) In a power supply facility that connects a power bus of a substation to a load bus via a circuit breaker and feeds power from the load bus to a load group.
The overload current flowing in the circuit breaker is detected by a current detector, and when the temporary overload current generated in the load bus tries to exceed the rated current of the circuit breaker, the overload current is detected by the circuit breaker. The power storage device for supplying power to the load bus from the DC power storage device is provided so as to suppress the current to less than the rated current.

(2)前記電力貯蔵装置は、
直流蓄電装置と、この直流蓄電装置と補助母線との間に設けた充放電装置と、この補助母線と前記負荷母線との間を開閉できる半導体スイッチと、前記補助母線から電源母線への逆流を阻止する逆流防止用ダイオードまたは半導体スイッチとを備え、
一時的な過負荷電流の発生時には前記充放電装置の放電制御と前記半導体スイッチのオン制御で前記直流蓄電装置から負荷母線に給電し、通常時には前記充放電装置の充電制御により電源母線から前記逆流防止用ダイオードまたは半導体スイッチを通して前記直流蓄電装置を充電する手段、および、前記充放電装置の充電制御により、負荷母線から前記遮断器と電源母線を通して、負荷からの回生電力を吸収する手段、および前記充放電装置の充放電制御によって、変電所負荷のピークカットを行う手段のうち、いずれか1つ以上を備えたことを特徴とする。
(2) The power storage device
A DC power storage device, a charging / discharging device provided between the DC power storage device and the auxiliary bus, a semiconductor switch capable of opening and closing between the auxiliary bus and the load bus, and a reverse flow from the auxiliary bus to the power source bus With a backflow prevention diode or semiconductor switch to block,
When a temporary overload current is generated, power is supplied from the DC power storage device to the load bus by discharge control of the charge / discharge device and on-control of the semiconductor switch. Means for charging the DC power storage device through a prevention diode or a semiconductor switch, and means for absorbing regenerative power from a load from a load bus through the circuit breaker and a power source bus by charging control of the charge / discharge device, and Any one or more means for performing peak cut of the substation load by charge / discharge control of the charge / discharge device is provided.

(3)前記充放電装置は、電源母線、負荷母線および補助母線が交流の場合、AC/DCコンバータとすることを特徴とする。   (3) The charging / discharging device is an AC / DC converter when the power bus, the load bus, and the auxiliary bus are AC.

(4)前記充放電装置は、電源母線、負荷母線および補助母線が直流の場合、DC/DCコンバータとすることを特徴とする。   (4) The charge / discharge device is a DC / DC converter when the power bus, the load bus, and the auxiliary bus are DC.

(5)前記電源母線は直流き電系統のき電線とし、前記負荷母線は直流き電系統のトロリー線とし、前記遮断器は前記き電線とトロリー線の間に設け、前記電力貯蔵装置の半導体スイッチは補助母線とトロリー線の間に設け、前記逆流防止用半導体スイッチはき電線と補助母線との間に設けたダイオードとする構成を特徴とする。   (5) The power bus is a feeder for a DC feeder, the load bus is a trolley for a DC feeder, the circuit breaker is provided between the feeder and the trolley, and the semiconductor of the power storage device The switch is provided between the auxiliary bus and the trolley wire, and the backflow preventing semiconductor switch feeder is a diode provided between the auxiliary bus and the auxiliary bus.

以上のとおり、本発明によれば、給電設備に、一時的な過負荷電流そのものが遮断器の定格電流を越えるのを防止する電力貯蔵装置を併設したため、以下の効果がある。   As described above, according to the present invention, the power storage device is provided with the power storage device that prevents the temporary overload current itself from exceeding the rated current of the circuit breaker, and thus has the following effects.

(1)遮断器の定格電流を一定以下に抑えることができ、大容量の遮断器の開発を不要にして、遮断器の誤った保護動作および給電設備の停電を回避できる。   (1) The rated current of the circuit breaker can be kept below a certain level, development of a large-capacity circuit breaker is unnecessary, and erroneous protection operation of the circuit breaker and power failure of the power supply equipment can be avoided.

(2)給電設備において、短時間(数秒以内)大電流負荷に対応でき、定格の大きな遮断器への交換、および自己遮断動作のための基準電流値の変更が不要となる。   (2) The power supply equipment can handle a large current load for a short time (within several seconds), and it is not necessary to replace the circuit breaker with a higher rated value or change the reference current value for the self-breaking operation.

(3)給電設備の負荷電力のピークカットができる。   (3) The peak power load of the power supply equipment can be cut.

(4)き電変電所の電鉄負荷、またはクレーンやエレベータなどの巻上機負荷等において、回生電力による給電設備の電圧上昇や回生失効の防止対策ができる。   (4) It is possible to take measures to prevent an increase in the voltage of the power supply equipment due to regenerative power and regenerative invalidation at electric railway loads of feeder substations or hoisting machine loads such as cranes and elevators.

図1は、本実施形態を示す直流き電変電所の回路構成図である。同図が図3と異なる部分は、き電変電所の近傍に電力貯蔵装置を併設し、一時的な過負荷電流がトロリー線で発生した場合には、定格電流を越える電流を電力貯蔵装置から直流給電する点にある。   FIG. 1 is a circuit configuration diagram of a DC feeding substation showing the present embodiment. 3 differs from FIG. 3 in that a power storage device is provided near the feeder substation. If a temporary overload current is generated on the trolley wire, a current exceeding the rated current is supplied from the power storage device. It is in the point to supply DC power.

図示の電力貯蔵装置は、電気二重層キャパシタ11を直流電源とし、これに放電器12と充電器13をそれぞれ直列接続し、放電器12の出力端と充電器13の入力端の共通接続点に電力貯蔵装置専用の補助母線14を接続し、この補助母線14と各トロリー線4との間にそれぞれサイリスタスイッチ(半導体スイッチ)15を順方向で設ける。さらに、き電線3から補助母線14側に順方向に逆流防止用ダイオード16を設ける。   In the illustrated power storage device, an electric double layer capacitor 11 is used as a DC power source, and a discharger 12 and a charger 13 are connected in series to each other, and a common connection point between the output end of the discharger 12 and the input end of the charger 13 is provided. An auxiliary bus 14 dedicated to the power storage device is connected, and a thyristor switch (semiconductor switch) 15 is provided between the auxiliary bus 14 and each trolley wire 4 in the forward direction. Further, a backflow preventing diode 16 is provided in the forward direction from the feeder 3 to the auxiliary bus 14 side.

この構成になる電力貯蔵装置は、定常時(例えば、き電線電圧が任意の下限電圧以上、上限電圧以下でかつ定格電流以下のとき)は、き電線3からダイオード16および充電器13を通してキャパシタ11を充電しておくと共に、き電線3から直流遮断器5およびトロリー線4を通して前記遮断器5の定格電流以下の電力を電車6に給電する。そして、一時的な過負荷電流の発生(図示しない直流電流検出器で過負荷電流値を検出)で、き電線3からトロリー線4への給電電流がその間に介挿される直流遮断器5の定格電流を越えようとするときに、この過負荷電流を直流遮断器の定格電流以下に抑制するよう、電気二重層キャパシタ11から放電器12の放電制御およびサイリスタ15のオン制御で当該トロリー線4へ給電する。   The power storage device configured as described above has a capacitor 11 through the diode 16 and the charger 13 from the feeder 3 when the feeder is in a steady state (for example, when the feeder voltage is not less than an arbitrary lower limit voltage, not more than the upper limit voltage and not more than the rated current). Is charged, and electric power equal to or lower than the rated current of the circuit breaker 5 is supplied from the feeder 3 to the train 6 through the DC circuit breaker 5 and the trolley wire 4. The rating of the DC breaker 5 in which the feeding current from the feeder 3 to the trolley wire 4 is inserted between the temporary overload current (the overload current value is detected by a DC current detector (not shown)). When the electric current is exceeded, the overload current is controlled from the electric double layer capacitor 11 to the trolley wire 4 by the discharge control of the discharger 12 and the on-control of the thyristor 15 so as to suppress the overload current below the rated current of the DC circuit breaker. Supply power.

このような機能構成にされる電力貯蔵装置の制御装置の例を図2に示す。同図において、差分演算部17は、直流電流検出器で検出される各直流遮断器5の電流i1〜inと、直流遮断器5の個別または共通の定格電流との差分を個別に求める。サイリスタ選択投入部18は、電流i1〜inが直流遮断器の定格電流または抑制したい任意の電流値に近づいた時(自己遮断のための基準電流値を越えないように)、当該直流遮断器5が接続されるトロリー線4と補助母線14との間に設けられるサイリスタスイッチ15を選択投入する。   An example of the control device of the power storage device having such a functional configuration is shown in FIG. In the same figure, the difference calculating part 17 calculates | requires separately the difference of the electric current i1-in of each DC circuit breaker 5 detected with a DC current detector, and the individual or common rated current of the DC circuit breaker 5. When the current i1 to in approaches the rated current of the DC circuit breaker or an arbitrary current value to be suppressed (so as not to exceed the reference current value for self-interruption), the thyristor selection input unit 18 The thyristor switch 15 provided between the trolley wire 4 and the auxiliary bus 14 connected to is selectively turned on.

キャパシタ放電制御部19は、サイリスタ選択投入部18が少なくとも1つ以上のサイリスタを選択投入したときに放電器12を放電制御し、キャパシタ11から放電器12とサイリスタスイッチ15を通してトロリー線への放電電流を制御する。この放電電流制御は、検出電流i1〜inが直流遮断器5の定格電流よりも少し低い値になるよう制御し、またヒステリシス特性をもたせて安定制御する。   The capacitor discharge control unit 19 controls the discharge of the discharger 12 when the thyristor selection input unit 18 selectively inputs at least one thyristor, and discharges current from the capacitor 11 to the trolley line through the discharger 12 and the thyristor switch 15. To control. In this discharge current control, the detection currents i1 to in are controlled to be slightly lower than the rated current of the DC circuit breaker 5, and are stably controlled with a hysteresis characteristic.

キャパシタ充電制御部20は、サイリスタ選択投入部18がすべてのサイリスタスイッチ15を選択投入していないときに、充電器13を充電制御し、キャパシタ11を所定電圧まで充電しておく。   The capacitor charge control unit 20 controls the charging of the charger 13 and charges the capacitor 11 to a predetermined voltage when the thyristor selection input unit 18 does not select all the thyristor switches 15.

したがって、本実施形態によれば、一時的な過負荷電流の発生には、電力貯蔵装置によって過剰電流分(直流遮断器の定格電流を超える電流分)を給電することができる。これにより、直流遮断器は既存の定格電流仕様のものを使用して、一時的な過負荷電流にも自己遮断することはなく、その交換を不要にする。また、直流遮断器の自己遮断動作のための基準電流値を変更する必要も無い。さらに、一時的な過負荷電流による誤った保護動作および停電を回避できる。特に、電鉄負荷に特有の短時間(1〜数秒)大電流負荷による直流遮断器の不要な遮断動作を防止できる。   Therefore, according to the present embodiment, an excess current (a current exceeding the rated current of the DC breaker) can be supplied by the power storage device to generate a temporary overload current. As a result, the DC breaker using the existing rated current specification is not self-interrupted even for a temporary overload current, and the exchange is unnecessary. Further, there is no need to change the reference current value for the self-breaking operation of the DC circuit breaker. Furthermore, erroneous protection operation and power failure due to temporary overload current can be avoided. In particular, it is possible to prevent an unnecessary breaking operation of the DC breaker due to a large current load for a short time (1 to several seconds) peculiar to a railway load.

さらに、電力貯蔵装置の設置により、電車の回生運転でき電線電圧が過電圧レベルに近づいたとき、制御部20による充電器13の充電制御によって、ダイオード16から充電器13を通してキャパシタ11に回生電力を吸収させることもできる。さらにまた、電力貯蔵装置の大容量化によって、変電所負荷のピークカットも可能になる。   Furthermore, when the electric power storage device can be regenerated by installing the power storage device and the electric wire voltage approaches an overvoltage level, the regenerative power is absorbed from the diode 16 through the charger 13 to the capacitor 11 by the charging control of the charger 13 by the control unit 20. It can also be made. Furthermore, the peak capacity of the substation load can be cut by increasing the capacity of the power storage device.

なお、実施形態において、放電器12と充電器13を1台の昇降圧チョッパとして構成して同等の作用効果を得ることができる。例えば、き電線3の電圧がDC1100〜1700V、キャパシタ11の端子電圧がDC400〜1000Vの場合、昇降圧チョッパの降圧制御により、き電線3からキャパシタ11へ充電、昇圧制御によりキャパシタ11からトロリー線4へ放電となる。逆に、放電器12の出力は補助母線14に接続し、ダイオード16を省略してき電線3から直接に充電器13に接続する構成にすることも可能である。   In the embodiment, the discharger 12 and the charger 13 can be configured as a single step-up / step-down chopper, and equivalent effects can be obtained. For example, when the voltage of the feeder 3 is DC 1100 to 1700 V and the terminal voltage of the capacitor 11 is DC 400 to 1000 V, charging from the feeder 3 to the capacitor 11 is performed by the step-down control of the step-up / step-down chopper, and from the capacitor 11 to the trolley wire 4 by the step-up control. To discharge. Conversely, it is possible to connect the output of the discharger 12 to the auxiliary bus 14, omit the diode 16, and connect directly to the charger 13 from the electric wire 3.

また、実施形態は、直流き電変電所に電力貯蔵装置を併設する場合を示すが、交流き電系統や巻上機など、起動電流が大きい電動機群をそれぞれ継電器の接点を閉成して駆動するための給電設備に適用して同等の作用効果を得ることができる。   In addition, although the embodiment shows a case where a power storage device is installed in a DC feeder substation, a group of motors having a large starting current, such as an AC feeder system and a hoisting machine, are each driven by closing a contact of a relay. It is possible to obtain the same effect by applying it to the power supply equipment for doing so.

また、実施形態は直流き電系統に直流電力を給電する設備の場合を示すが、交流変電所の交流母線から交流遮断器を介して負荷母線に接続し、負荷母線から負荷群に給電する交流給電設備に電力貯蔵装置を併設して同等の効果を得ることができる。この場合、整流装置2は省き、直流遮断器5は交流遮断器に置換し、サイリスタスイッチ15は交流電流をオン/オフできる双方向半導体スイッチに置換し、放電器12はインバータに置換すれば良い。   Moreover, although embodiment shows the case of the installation which supplies direct-current power to a direct-current power feeding system, it connects to a load bus line through the AC circuit breaker from the alternating current bus line of an alternating current substation, and the alternating current which supplies electric power to a load group from a load bus line The same effect can be obtained by providing a power storage device in the power supply facility. In this case, the rectifier 2 is omitted, the DC breaker 5 is replaced with an AC breaker, the thyristor switch 15 is replaced with a bidirectional semiconductor switch capable of turning on / off the AC current, and the discharger 12 is replaced with an inverter. .

本発明の実施形態を示すき電変電所の構成図。The block diagram of the feeder substation which shows embodiment of this invention. 実施形態における電力貯蔵装置制御装置の構成図。The block diagram of the electric power storage apparatus control apparatus in embodiment. 従来のき電変電所の構成図。The block diagram of the conventional feeder substation.

符号の説明Explanation of symbols

1 変圧器
2 整流装置
3 き電線
4 トロリー線
5 直流遮断器
6 電車
11 電気二重層キャパシタ
12 放電器
13 充電器
14 補助母線
15 サイリスタスイッチ
16 逆流防止ダイオード
DESCRIPTION OF SYMBOLS 1 Transformer 2 Rectifier 3 Feed wire 4 Trolley wire 5 DC circuit breaker 6 Train 11 Electric double layer capacitor 12 Discharger 13 Charger 14 Auxiliary bus 15 Thyristor switch 16 Backflow prevention diode

Claims (5)

変電所の電源母線から遮断器を介して負荷母線に接続し、負荷母線から負荷群に給電する給電設備において、
前記遮断器に流れる過負荷電流を電流検出器で検出し、負荷母線に発生する一時的な過負荷電流が前記遮断器の定格電流を越えようとするときに、該過負荷電流を前記遮断器の定格電流以下に抑制するよう、直流蓄電装置から負荷母線に給電する電力貯蔵装置を備えたことを特徴とする給電設備。
In the power supply equipment that connects from the power bus of the substation to the load bus via the circuit breaker and supplies power to the load group from the load bus,
The overload current flowing in the circuit breaker is detected by a current detector, and when the temporary overload current generated in the load bus tries to exceed the rated current of the circuit breaker, the overload current is detected by the circuit breaker. A power supply facility comprising a power storage device for supplying power from a DC power storage device to a load bus so as to suppress the current to less than a rated current.
前記電力貯蔵装置は、
直流蓄電装置と、この直流蓄電装置と補助母線との間に設けた充放電装置と、この補助母線と前記負荷母線との間を開閉できる半導体スイッチと、前記補助母線から電源母線への逆流を阻止する逆流防止用ダイオードまたは半導体スイッチとを備え、
一時的な過負荷電流の発生時には前記充放電装置の放電制御と前記半導体スイッチのオン制御で前記直流蓄電装置から負荷母線に給電し、通常時には前記充放電装置の充電制御により電源母線から前記逆流防止用ダイオードまたは半導体スイッチを通して前記直流蓄電装置を充電する手段、および、前記充放電装置の充電制御により、負荷母線から前記遮断器と電源母線を通して、負荷からの回生電力を吸収する手段、および前記充放電装置の充放電制御によって、変電所負荷のピークカットを行う手段のうち、いずれか1つ以上を備えたことを特徴とする請求項1に記載の給電設備。
The power storage device includes:
A DC power storage device, a charging / discharging device provided between the DC power storage device and the auxiliary bus, a semiconductor switch capable of opening and closing between the auxiliary bus and the load bus, and a reverse flow from the auxiliary bus to the power source bus With a backflow prevention diode or semiconductor switch to block,
When a temporary overload current is generated, power is supplied from the DC power storage device to the load bus by discharge control of the charge / discharge device and on-control of the semiconductor switch. Means for charging the DC power storage device through a prevention diode or a semiconductor switch, and means for absorbing regenerative power from a load from a load bus through the circuit breaker and a power source bus by charging control of the charge / discharge device, and The power supply equipment according to claim 1, comprising any one or more means for performing peak cut of the substation load by charge / discharge control of the charge / discharge device.
前記充放電装置は、電源母線、負荷母線および補助母線が交流の場合、AC/DCコンバータとすることを特徴とする請求項2に記載の給電設備。   The power supply equipment according to claim 2, wherein the charging / discharging device is an AC / DC converter when the power bus, the load bus, and the auxiliary bus are alternating current. 前記充放電装置は、電源母線、負荷母線および補助母線が直流の場合、DC/DCコンバータとすることを特徴とする請求項2に記載の給電設備。   The power supply facility according to claim 2, wherein the charging / discharging device is a DC / DC converter when the power bus, the load bus, and the auxiliary bus are DC. 前記電源母線は直流き電系統のき電線とし、前記負荷母線は直流き電系統のトロリー線とし、前記遮断器は前記き電線とトロリー線の間に設け、前記電力貯蔵装置の半導体スイッチは補助母線とトロリー線の間に設け、前記逆流防止用半導体スイッチはき電線と補助母線との間に設けたダイオードとする構成を特徴とする請求項1〜4のいずれか1項に記載の給電設備。   The power source bus is a feeder of a DC feeder system, the load bus is a trolley wire of a DC feeder system, the circuit breaker is provided between the feeder and the trolley wire, and the semiconductor switch of the power storage device is an auxiliary The power supply equipment according to any one of claims 1 to 4, wherein a diode is provided between a busbar and a trolley wire and is provided between the backflow-preventing semiconductor switch feeder and the auxiliary busbar. .
JP2007004083A 2007-01-12 2007-01-12 Power supply equipment Active JP5082450B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007004083A JP5082450B2 (en) 2007-01-12 2007-01-12 Power supply equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007004083A JP5082450B2 (en) 2007-01-12 2007-01-12 Power supply equipment

Publications (2)

Publication Number Publication Date
JP2008168795A JP2008168795A (en) 2008-07-24
JP5082450B2 true JP5082450B2 (en) 2012-11-28

Family

ID=39697291

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007004083A Active JP5082450B2 (en) 2007-01-12 2007-01-12 Power supply equipment

Country Status (1)

Country Link
JP (1) JP5082450B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101369337B1 (en) * 2012-05-07 2014-03-06 한국철도기술연구원 Active railway feeding system and method without insulation section for large power ac traction supply

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011079454A (en) * 2009-10-08 2011-04-21 Toshiba Corp Power system for electric railway
JP5725877B2 (en) * 2011-01-19 2015-05-27 三菱重工マシナリーテクノロジー株式会社 Power supply apparatus, crane, and power supply method.
JP6058287B2 (en) * 2011-05-30 2017-01-11 株式会社やまびこ Engine drive power generator
JP5935301B2 (en) * 2011-11-17 2016-06-15 住友重機械搬送システム株式会社 Power supply apparatus and supply power control method
US9806691B2 (en) 2013-02-06 2017-10-31 Mitsubishi Electric Corporation Filter device and electric-vehicle drive controller
JP5921738B2 (en) * 2015-03-11 2016-05-24 三菱電機株式会社 Filter device and electric vehicle drive control device
EP3321120A1 (en) * 2016-11-14 2018-05-16 ABB Schweiz AG A charging power feeding system for electric vehicle station
CN108859873B (en) * 2018-06-14 2022-04-08 中车大连机车车辆有限公司 Safe negative pole one-way conduction device with fault diagnosis function
ES2913844T3 (en) 2019-01-23 2022-06-06 Alstom Transp Tech DC traction substation to supply at least one vehicle
CN110654272B (en) * 2019-09-30 2022-09-16 南京亚派科技股份有限公司 Method for preventing false start between adjacent stations of subway energy feedback device
CN114884168B (en) * 2022-05-13 2023-05-02 国网湖北省电力有限公司宜昌供电公司 Transformer substation direct current system based on lithium iron phosphate storage battery
CN115065119A (en) * 2022-06-29 2022-09-16 陕西光德分布式电站技术有限公司 No-load active main loop power supply cutting-off system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0281737A (en) * 1988-09-19 1990-03-22 Hitachi Ltd Overcurrent tripping device
JP2000233669A (en) * 1999-02-18 2000-08-29 Meidensha Corp Power feeding system for dc feeder line
JP2006034041A (en) * 2004-07-20 2006-02-02 Toyo Electric Mfg Co Ltd Controller for feeder system power storage system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101369337B1 (en) * 2012-05-07 2014-03-06 한국철도기술연구원 Active railway feeding system and method without insulation section for large power ac traction supply

Also Published As

Publication number Publication date
JP2008168795A (en) 2008-07-24

Similar Documents

Publication Publication Date Title
JP5082450B2 (en) Power supply equipment
JP4415874B2 (en) Charge and discharge method for transportation system
JP5622380B2 (en) Power supply system
JP2015036280A (en) Railway feeding system, feeding controller, and electrical storage device
JP2008228449A (en) Switch control system of charging/discharging circuit for battery
JP3618273B2 (en) DC feeder system for electric railway
JP2017135889A (en) Power conversion device, and power conversion system
EP3633818B1 (en) Power conversion device
JP2008295160A (en) Uninterruptible power supply unit
JP4760613B2 (en) Control system for DC feeding system
RU2646770C2 (en) Energy storage arrangement, energy storage system and method for operating energy storage arrangement
JP2010000810A (en) Feeder system of dc feeding network
JP6259778B2 (en) Railway vehicle drive system
JP5509442B2 (en) Power converter and electric railway system
JP6135201B2 (en) Control device and control method for DC feeding substation
JP2008043190A (en) Switch
JP2014055902A (en) Dc power supply facility for nuclear power plant
JP6703913B2 (en) Power storage device
CN107431365B (en) Electricity storage device
RU104390U1 (en) DC SHIELD (OPTIONS)
JP2010040348A (en) Opening/closing method of dc power supply and device for the same
JPH05199607A (en) Power converter for electric vehicle
CN114207975A (en) Method for coordinating protection devices in a power distribution network
JP2015089194A (en) Control system for railway vehicle, control method, and electric power conversion system
US11038336B1 (en) Redundant power module and discharge circuit for improved substation device availability

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20091112

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120124

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120305

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20120305

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120807

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120820

R150 Certificate of patent or registration of utility model

Ref document number: 5082450

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150914

Year of fee payment: 3