CN206470308U - A kind of three-phase electric energy meter terminal box and the three-phase electric energy meter comprising the terminal box - Google Patents

A kind of three-phase electric energy meter terminal box and the three-phase electric energy meter comprising the terminal box Download PDF

Info

Publication number
CN206470308U
CN206470308U CN201621493046.2U CN201621493046U CN206470308U CN 206470308 U CN206470308 U CN 206470308U CN 201621493046 U CN201621493046 U CN 201621493046U CN 206470308 U CN206470308 U CN 206470308U
Authority
CN
China
Prior art keywords
phases
relay
transformer
terminal box
energy meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621493046.2U
Other languages
Chinese (zh)
Inventor
彭筱筱
郑凡
邹成伍
周韶园
朱中文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Marketing Service Center of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201621493046.2U priority Critical patent/CN206470308U/en
Application granted granted Critical
Publication of CN206470308U publication Critical patent/CN206470308U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Transformers For Measuring Instruments (AREA)

Abstract

A kind of three-phase electric energy meter the utility model discloses three-phase electric energy meter terminal box and comprising the terminal box.Existing relay and transformer are split-type structural, and the installation that result in relay and transformer is more bothered.Three-phase electric energy meter terminal box of the present utility model includes terminal box, relay and transformer;Described terminal box has A phases end of incoming cables, B phases end of incoming cables, C phases end of incoming cables, A phases leading-out terminal, B phases leading-out terminal and C phase leading-out terminals;The side of the terminal box is provided with an accommodating case, and the relay and transformer are placed in as integral structure in accommodating case and the A phases end of incoming cables with terminal box, B phases end of incoming cables, C phases end of incoming cables, A phases leading-out terminal, B phases leading-out terminal and C phase leading-out terminals are connected.Three-phase electric energy meter terminal box of the present utility model facilitates the installation of relay and transformer, and the integral installation efficiency of three-phase electric energy meter terminal box is improved significantly.

Description

A kind of three-phase electric energy meter terminal box and the three-phase electric energy meter comprising the terminal box
Technical field
The utility model is related to electric energy meter, specifically a kind of three-phase electric energy meter terminal box and comprising the terminal box three Phase electric energy meter.
Background technology
Current three-phase electric energy meter terminal box, its box body is provided with A phases end of incoming cables, B phases end of incoming cables, C phases end of incoming cables, A phases Leading-out terminal, B phases leading-out terminal and C phase leading-out terminals.First via input after A phases end of incoming cables connection transformer with relay connects Connect, its first via output end is drawn from A phases leading-out terminal again, B phases end of incoming cables connects second with relay after another transformer Road input connection, its second tunnel output end is drawn from B phases leading-out terminal again, and C phases end of incoming cables is reconnected after remaining transformer It is connected with the 3rd road input of relay, its 3rd tunnel output end is drawn from C phases leading-out terminal again.
But existing relay and transformer are split-type structural, connection between the two needs to weld by copper bar Or connected by wire, and be also required between the end of incoming cables on the input and electric energy meter terminal box of transformer by copper bar It is also required between leading-out terminal in welding or wire connection, the three tunnel output ends and electric energy meter terminal box of transformer by copper bar Welding or wire connection, the installation process that result in relay and transformer are more bothered.
Utility model content
Technical problem to be solved in the utility model is that the defect for overcoming above-mentioned prior art to exist will be mutual there is provided one kind The three-phase electric energy meter terminal box that sensor and relay are integrated in one with terminal box and the three-phase electric energy meter comprising the terminal box, with The installation of convenience relay and transformer, hence it is evident that improve the overall installation effectiveness of terminal box.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of three-phase electric energy meter terminal box, bag Include terminal box, relay and transformer;Described terminal box has A phases end of incoming cables, B phases end of incoming cables, C phases end of incoming cables, A phase outlets End, B phases leading-out terminal and C phase leading-out terminals;The side of the terminal box is provided with an accommodating case, and the relay and transformer are used as one Body formula structure is placed in accommodating case and the A phases end of incoming cables with terminal box, B phases end of incoming cables, C phases end of incoming cables, A phases leading-out terminal, B phases go out Line end and the connection of C phases leading-out terminal.
After above structure, accommodating case carrying relay and transformer are relied on, and when relay and transformer are placed in Go out after in accommodating case with the A phases end of incoming cables of terminal box, B phases end of incoming cables, C phases end of incoming cables, A phases leading-out terminal, B phases leading-out terminal and C phases Line end is connected, simplify the process for installing relay and transformer, it is to avoid produced problem in the prior art, improves terminal The overall installation effectiveness of box structure.
Further, the quantity of the transformer is three, and the relay has three road inputs and three tunnel output ends, The transformer has an input and an output end;The output end of each transformer is provided with the first electric conductor;Three transformers Input electrically connected respectively with the output end all the way of relay;Every input all the way of the relay is conductive provided with second Body;Three the second electric conductors are connected conducting, three the first electric conductors with A phases end of incoming cables, B phases end of incoming cables and C phases end of incoming cables respectively Respectively conducting is connected with A phases leading-out terminal, B phases leading-out terminal and C phase leading-out terminals.
Set using said structure, relay and three transformers are together positioned in accommodating case, by relay and mutual inductance Device integration-in-one structure, the input and the output end of relay of an extraction transformer, that is, draw the first electric conductor as one The output end of body formula structure, draws the second electric conductor as the input of integral structure, is directly installed to integral structure On electric energy meter terminal box, i.e. terminal box is connected conducting with the end of incoming cables of terminal box and leading-out terminal, just can used, relative to original The installation procedure of relay and transformer, all brings aobvious from the stability of installation effectiveness and follow-up whole ammeter operation The raising of work.
Further, three the second electric conductors are connected with A phases end of incoming cables, B phases end of incoming cables and C phases end of incoming cables respectively by screw Fixed conducting is connect, three the first electric conductors are connected with A phases leading-out terminal, B phases leading-out terminal and C phase leading-out terminals respectively by screw Conducting.Whole integral structure is installed on electric energy meter terminal box, is set up with the end of incoming cables of terminal box and leading-out terminal and is connected conducting, Only need to be connected by screw fixation, even more embody high efficiency and agility.
Further, the accommodating case is provided with the relay cavity installed for relay and three confessions being spaced apart The transformer cavity that transformer is installed;The relay cavity and transformer cavity are located at the back side of accommodating case;The relay Device cavity is at the top of accommodating case, and the transformer cavity is placed in the lower section of relay cavity, each transformer cavity Cavity wall is provided with and passes the first open slot to outside accommodating case for the first electric conductor;The relay cavity is provided with and led for second Electric body passes the second open slot to outside accommodating case.The internal structure of accommodating case is indicated, based on above-mentioned structure, can be realized When relay and transformer are installed in accommodating case, directly holding the accommodating case just can be with the end of incoming cables on terminal box and going out Line end, which is set up, to be connected and turns on.
Further, the volume of the relay cavity is suitable with the volume of relay;The volume of the transformer cavity It is suitable with the volume of transformer.Contribute to the stability of relay and transformer in accommodating case, relay and transformer will not There is unnecessary loosening, when electric energy meter terminal box shakes, relay and transformer can keep relative stabilization.
Further, two ends of the left and right two ends of the relay respectively with relay cavity offset.Contribute to further Improve the stability of relay.
Further, the sidepiece that relay is connected to per the second electric conductor that input is provided with all the way of the relay, Second electric conductor is passed to outside the second open slot vertically.The space of relay cavity is saved, helps to reduce accommodating case Volume, the final overall volume for reducing three-phase electric energy meter terminal box structure.
Further, upper/lower terminal of the upper/lower terminal of the transformer respectively with transformer cavity offsets.Contribute to Further improve the stability of transformer.
Further, the first electric conductor that the output end of the transformer is provided with is connected to the lower end of transformer, described One electric conductor is passed to outside the first open slot vertically.The space of transformer cavity is saved, helps to reduce the volume of accommodating case, most The overall volume of three-phase electric energy meter terminal box structure is reduced eventually.
Further, described three-phase electric energy meter terminal box also includes Z-type conductive bar;The input of the transformer passes through The output end connection of Z-type conductive bar and relay.Contribute to the volume of reduction accommodating case, it is final to reduce three-phase electric energy meter terminal box The overall volume of structure, the input for the transformer that staggers and the output end of relay, it is to avoid both produce disturbing factor by too near.
Another technical scheme that the utility model is used for:A kind of three-phase electric energy meter, it includes above-mentioned three-phase electric energy meter end Button box.
The utility model has the advantage that:Three-phase electric energy meter terminal box of the present utility model is by relay and transformer It is placed in accommodating case and is connected with each of terminal box into and out of line end as integral structure, facilitates relay and transformer Installation, hence it is evident that improve the overall installation effectiveness of terminal box.
Brief description of the drawings
Fig. 1 is the positive structural representation of the utility model embodiment one;
Fig. 2 is the structural representation at the back side of the utility model embodiment one;
Fig. 3 is the schematic diagram of the accommodating case of the utility model embodiment one.
In figure:1st, terminal box;2nd, relay;3rd, transformer;4th, accommodating case;401st, relay cavity;402nd, transformer is recessed Chamber;403rd, the first open slot;404th, the second open slot;501st, the first electric conductor;502nd, the second electric conductor;6th, Z-type conductive bar;7、 Connect ear.
Embodiment
The utility model is described in further detail with reference to specification drawings and specific embodiments.
Embodiment one
The present embodiment is a kind of three-phase electric energy meter terminal box.
Three-phase electric energy meter terminal box as Figure 1-3, it is made up of terminal box 1, relay 2 and three transformers 3;After Electrical equipment 2 has three road inputs and three tunnel output ends, and transformer 3 has an input and an output end;Terminal box 1 has A phases End of incoming cables, B phases end of incoming cables, C phases end of incoming cables, A phases leading-out terminal, B phases leading-out terminal and C phase leading-out terminals;The upper end of terminal box 1 is provided with Accommodating case 4;The output end of each transformer 3 is provided with the first electric conductor 501;The input of three transformers 3 respectively with relay 2 Output end all the way electrical connection;Every input all the way of relay 2 is provided with the second electric conductor 502;Relay 2 and three mutual inductances Device 3 is positioned in accommodating case 4, and three the second electric conductors 502 are connected with A phases end of incoming cables, B phases end of incoming cables and C phases end of incoming cables respectively Conducting, three the first electric conductors 501 are connected conducting with A phases leading-out terminal, B phases leading-out terminal and C phase leading-out terminals respectively;Wherein, first The electric conductor 502 of electric conductor 501 and second is conductive copper bar.
Three the second electric conductors 502 are connected with A phases end of incoming cables, B phases end of incoming cables and C phases end of incoming cables respectively by screw Conducting, three the first electric conductors 501 are connected and led with A phases leading-out terminal, B phases leading-out terminal and C phase leading-out terminals respectively by screw It is logical;That one end sidepiece that second electric conductor 502 extends outside accommodating case 4 is provided with connection ear 7, wherein, the connection ear 7 can turn Dynamicly on the second electric conductor 502, it can be rotated along the second electric conductor 502, while the connection ear 7 is provided with screw hole, Facilitate the fixation that is spirally connected of the second electric conductor 502 and terminal box 1, it is adaptable to different terminal boxs, while such be designed with is beneficial to Reduce the overall volume of three-phase electric energy meter terminal box structure.
Accommodating case 4 is provided with the relay cavity 401 and three confession transformers 3 being spaced apart installed for relay 2 The transformer cavity 402 of installation;Relay cavity 401 and transformer cavity 402 are located at the back side of accommodating case 4;Relay is recessed Chamber 401 is in the top of accommodating case 4, and transformer cavity 402 is placed in the lower section of relay cavity 401, each transformer cavity 402 Cavity wall is provided with and passed for the first electric conductor 501 to the first open slot 403 outside accommodating case 4;Relay cavity 401 is provided with confession Second electric conductor 502 is passed to the second open slot 404 outside accommodating case 4, wherein, the first open slot 403 and the second open slot 404 Setting and for it is convenient by the first electric conductor 501 and the second electric conductor 502 together with relay 2 and transformer 3 It is arranged in accommodating case 4.
The volume of relay cavity 401 is suitable with the volume of relay 2;The volume of transformer cavity 402 and transformer 3 Volume is suitable.Two ends of the left and right two ends of relay 2 respectively with relay cavity 401 offset.The every of relay 2 inputs all the way The second electric conductor 502 being provided with is held to be connected to the sidepiece of relay 2, the second electric conductor 502 is passed to the second open slot 404 vertically Outside.
Upper/lower terminal of the upper/lower terminal of transformer 3 respectively with transformer cavity 402 offsets.The output end of transformer 3 The first electric conductor 501 being provided with is connected to the lower end of transformer 3, and the first electric conductor 501 is passed to the first open slot 403 vertically Outside.
The input of transformer 3 is connected by Z-type conductive bar 6 with the output end of relay 2.
Embodiment two
The present embodiment is a kind of three-phase electric energy meter for including three-phase electric energy meter terminal box in embodiment one.
Only most preferred embodiment of the present utility model is described above, but is not to be construed as the limit to claim System.The utility model is not limited only to above example, all to be made in the protection domain of the utility model independent claims Various change is in protection domain of the present utility model.

Claims (10)

1. a kind of three-phase electric energy meter terminal box, including terminal box(1), relay(2)And transformer(3);The terminal box(1)Tool There are A phases end of incoming cables, B phases end of incoming cables, C phases end of incoming cables, A phases leading-out terminal, B phases leading-out terminal and C phase leading-out terminals;It is characterized in that:Institute State terminal box(1)Upper end be provided with an accommodating case(4), the relay(2)And transformer(3)It is placed in as integral structure Accommodating case(4)In and and terminal box(1)A phases end of incoming cables, B phases end of incoming cables, C phases end of incoming cables, A phases leading-out terminal, B phases leading-out terminal and C phases leading-out terminal is connected.
2. three-phase electric energy meter terminal box according to claim 1, it is characterised in that:The transformer(3)Quantity be three It is individual, the relay(2)With three road inputs and three tunnel output ends, each transformer(3)Exported with an input and one End;Each transformer(3)Output end be provided with the first electric conductor(501), three transformers(3)Input respectively with relay (2)Output end all the way electrical connection;The relay(2)The second electric conductor is provided with per input all the way(502);Three second Electric conductor(502)Respectively conducting, three the first electric conductors are connected with A phases end of incoming cables, B phases end of incoming cables and C phases end of incoming cables(501)Point Conducting is not connected with A phases leading-out terminal, B phases leading-out terminal and C phase leading-out terminals.
3. three-phase electric energy meter terminal box according to claim 2, it is characterised in that:Three the second electric conductors(502)Pass through Screw is connected conducting, three the first electric conductors with A phases end of incoming cables, B phases end of incoming cables and C phases end of incoming cables respectively(501)Pass through Screw is connected conducting with A phase leading-out terminal B phases leading-out terminals and C phase leading-out terminals respectively.
4. three-phase electric energy meter terminal box according to claim 3, it is characterised in that:The accommodating case(4)Be provided with for after Electrical equipment(2)The relay cavity of installation(401)And three confession transformers being spaced apart(3)The transformer cavity of installation (402);The relay cavity(401)With transformer cavity(402)It is located at accommodating case(4)The back side;The relay is recessed Chamber(401)In accommodating case(4)Top, the transformer cavity(402)It is placed in relay cavity(401)Lower section, it is each mutually Sensor cavity(402)Cavity wall be provided with supply the first electric conductor(501)Pass to accommodating case(4)The first outer open slot(403); The relay cavity(401)It is provided with and supplies the second electric conductor(502)Pass to accommodating case(4)The second outer open slot(404).
5. three-phase electric energy meter terminal box according to claim 4, it is characterised in that:The relay cavity(401)Appearance Product and relay(2)Volume it is suitable;The transformer cavity(402)Volume and transformer(3)Volume it is suitable.
6. three-phase electric energy meter terminal box according to claim 5, it is characterised in that:The relay(2)Left and right two ends Respectively with relay cavity(401)Two ends offset.
7. three-phase electric energy meter terminal box according to claim 6, it is characterised in that:The relay(2)Per defeated all the way Enter the second electric conductor that end is provided with(502)It is connected to relay(2)Sidepiece, second electric conductor(502)It is vertical pass to Second open slot(404)Outside.
8. three-phase electric energy meter terminal box according to claim 5, it is characterised in that:The transformer(3)Upper/lower terminal Respectively with transformer cavity(402)Upper/lower terminal offset.
9. three-phase electric energy meter terminal box according to claim 8, it is characterised in that:The transformer(3)Output end set The first electric conductor having(501)It is connected to transformer(3)Lower end, first electric conductor(501)Vertical pass to first is opened Mouth groove(403)Outside.
10. a kind of three-phase electric energy meter, it is characterised in that include any described three-phase electric energy meter terminal boxs of claim 1-9.
CN201621493046.2U 2016-12-30 2016-12-30 A kind of three-phase electric energy meter terminal box and the three-phase electric energy meter comprising the terminal box Active CN206470308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621493046.2U CN206470308U (en) 2016-12-30 2016-12-30 A kind of three-phase electric energy meter terminal box and the three-phase electric energy meter comprising the terminal box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621493046.2U CN206470308U (en) 2016-12-30 2016-12-30 A kind of three-phase electric energy meter terminal box and the three-phase electric energy meter comprising the terminal box

Publications (1)

Publication Number Publication Date
CN206470308U true CN206470308U (en) 2017-09-05

Family

ID=59704974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621493046.2U Active CN206470308U (en) 2016-12-30 2016-12-30 A kind of three-phase electric energy meter terminal box and the three-phase electric energy meter comprising the terminal box

Country Status (1)

Country Link
CN (1) CN206470308U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106645839A (en) * 2016-12-30 2017-05-10 国网浙江省电力公司电力科学研究院 Three-phase electric energy meter terminal box and three-phase electric energy meter containing the terminal box

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106645839A (en) * 2016-12-30 2017-05-10 国网浙江省电力公司电力科学研究院 Three-phase electric energy meter terminal box and three-phase electric energy meter containing the terminal box

Similar Documents

Publication Publication Date Title
CN106104723B (en) Transformer and the power inverter using the transformer
CN204695942U (en) A kind of paralleling reactor of extra-high voltage high-voltage terminal structure
CN206470308U (en) A kind of three-phase electric energy meter terminal box and the three-phase electric energy meter comprising the terminal box
CN106645839A (en) Three-phase electric energy meter terminal box and three-phase electric energy meter containing the terminal box
CN103093937A (en) Connecting post for transformer bushings
CN207425524U (en) Transformer split-phase type copper bar leading structure
JP3193283U (en) Network connection device and network connection system
CN103457417A (en) Leading-out method for brushless direct current motor outgoing lines for electric compressor
CN107112106A (en) For the apparatus and method for the inductance for adjusting electric conductor
CN204651139U (en) A kind of three-phase power transformer
CN207603164U (en) A kind of Distributed Power Flow controller suitable for arbitrary shaft tower
CN207624513U (en) A kind of novel traction high-voltage lead of transformer connection structure
CN201327765Y (en) High-frequency transformer for electric welding device
CN206711722U (en) A kind of high current reactor
CN205595165U (en) SMD transducing device
CN215600213U (en) Novel three-phase common-body voltage transformer secondary measurement and protection winding wiring structure
KR101563317B1 (en) Adding up type pick up apparatus
CN209016856U (en) A kind of motor source line connected structure
CN208093333U (en) A kind of transformer improving conducting wire connection
CN203895216U (en) Powder metallurgy soft magnetic tank type inductor
CN209001217U (en) A kind of forceful electric power interconnection architecture
CN203553317U (en) Filter
CN201518256U (en) Epoxy resin casting high-voltage bushing with multiple wire outgoing terminals
CN206272509U (en) A kind of high accuracy Switching Power Supply
CN207094577U (en) Lamp decoration is connected device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Patentee after: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY LIMITED ELECTRIC POWER Research Institute

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID ZHEJIANG ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

Patentee before: STATE GRID ZHEJIANG ELECTRIC POWER Co.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220321

Address after: 311100 Building 5, 138 Yunlian Road, Yuhang District, Hangzhou City, Zhejiang Province

Patentee after: Marketing service center of State Grid Zhejiang Electric Power Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Patentee before: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY LIMITED ELECTRIC POWER Research Institute

Patentee before: STATE GRID CORPORATION OF CHINA

Patentee before: STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.