CN107947339A - A kind of uninterrupted energy storage for power supply system and its operation method - Google Patents

A kind of uninterrupted energy storage for power supply system and its operation method Download PDF

Info

Publication number
CN107947339A
CN107947339A CN201710954817.6A CN201710954817A CN107947339A CN 107947339 A CN107947339 A CN 107947339A CN 201710954817 A CN201710954817 A CN 201710954817A CN 107947339 A CN107947339 A CN 107947339A
Authority
CN
China
Prior art keywords
units
mains
supplied
important load
utility grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710954817.6A
Other languages
Chinese (zh)
Inventor
吴贤章
谭建国
王大为
张楠
谢云强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nandu Zhejiang Energy Internet Operation Co Ltd
Zhejiang Narada Power Source Co Ltd
Original Assignee
Nandu Zhejiang Energy Internet Operation Co Ltd
Zhejiang Narada Power Source Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nandu Zhejiang Energy Internet Operation Co Ltd, Zhejiang Narada Power Source Co Ltd filed Critical Nandu Zhejiang Energy Internet Operation Co Ltd
Priority to CN201710954817.6A priority Critical patent/CN107947339A/en
Publication of CN107947339A publication Critical patent/CN107947339A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/061Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for DC powered loads
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/068Electronic means for switching from one power supply to another power supply, e.g. to avoid parallel connection

Abstract

The invention discloses a kind of uninterrupted energy storage for power supply system and its operation method, wherein system includes array, PCS units, UPS units and thyristor operation bypass;Array connects PCS units and UPS units respectively;PCS units connect utility grid, are stored for when mains-supplied is in the default paddy electricity period, obtaining electric energy from utility grid and sending to array;UPS units connect important load, for when mains-supplied being abnormal or mains-supplied is in the default peak electricity period, electric energy being obtained from array, is powered to important load;Thyristor operation bypass connection utility grid and important load, for when mains-supplied is in default paddy electricity period or ordinary telegram period, powering to important load.The present invention in case of emergency, can quickly be switched to array and be powered by UPS units, greatly improve the power supply reliability of important load.

Description

A kind of uninterrupted energy storage for power supply system and its operation method
Technical field
The present invention relates to technical field of electric power, more particularly to a kind of uninterrupted energy storage for power supply system and its operation method.
Background technology
As the development of society and the raising of people's quality of life, requirement of the people for power quality are also higher and higher. Some important loads, such as the operating condition of high-accuracy processing instrument, chemical industry equipment, computer room, industrial computer etc., for alternating current electricity The temporary drop of net voltage, temporarily liter, power failure are all special sensitive.Therefore, important load is proposed for the reliability of electric power system Increasingly higher demands.At present there is an urgent need to a kind of new uninterrupted energy storage for power supply system, to ensure these important loads Continual stable operation, improves utility grid power supply reliability.
The content of the invention
Based on this, the present invention proposes a kind of uninterrupted energy storage for power supply system and its operation method, it is therefore intended that ensure and The reliability for the electric power system for being used for important load operation is improved, is reduced because of utility grid voltage dip, temporary liter, power failure feelings Economic loss caused by under condition.Meanwhile the electric power system can also reduce important load in the electric period operation in mains-supplied peak Demand charge, reaches belt-tightening purpose.
A kind of uninterrupted energy storage for power supply system provided by the invention, including array, PCS units, UPS units and Thyristor operation bypass;
The array connects PCS (Power Control System, energy accumulation current converter) units and UPS (no respectively Uninterruptible power) unit;
The PCS units, connect utility grid, for when mains-supplied is in the default paddy electricity period, from alternating current Electric energy is obtained in power grid and is sent to the array and is stored;
The UPS units, connect important load, for mains-supplied be abnormal or mains-supplied be in it is default During the peak electricity period, electric energy is obtained from the array, is powered to important load;
The thyristor operation bypass, connects utility grid and important load, for being in default paddy in mains-supplied When electric period or ordinary telegram period, power to important load.
As a kind of embodiment, uninterrupted energy storage for power supply system provided by the invention, further includes inspection travel bypass;
Inspection travel bypass, connects utility grid and important load, for the array, PCS units, When UPS units or thyristor operation bypass maintenance, power to important load.
As a kind of embodiment, mains-supplied is abnormal the temporary drop including line voltage, temporarily rises or interrupt.
Based on same inventive concept, present invention also offers a kind of operation method of uninterrupted energy storage for power supply system, including Following steps:
According to system using the peak electricity of local mains-supplied, paddy electricity, ordinary telegram period, set the PCS units different The charged state of period and the UPS units discharge condition in different time periods;
When mains-supplied is in the default paddy electricity period, utility grid is bypassed to important load by thyristor operation Power supply;Meanwhile the PCS units obtain electric energy from utility grid, charge to the array;The UPS units are kept Output voltage is consistent with utility grid voltage, inactivity output;
When mains-supplied is in the default ordinary telegram period, utility grid is bypassed to important by thyristor operation Load supplying;The PCS units are disconnected with the utility grid, and the UPS units keep output voltage and utility grid voltage Unanimously, inactivity exports;
When mains-supplied is in the default peak electricity period, the PCS units and thyristor operation bypass are at the same time Disconnected with utility grid;The UPS units output power, is powered by the electric discharge of array to important load;
After the mains-supplied peak electric period, the output voltage of the UPS units is kept and utility grid voltage one Cause, after realization bypasses simultaneous interconnecting with thyristor operation, the UPS units gradually decrease its output power, until be zero, by Utility grid is powered again through thyristor operation bypass to important load.
Further, the operation method of uninterrupted energy storage for power supply system of the invention, it is further comprising the steps of:
When the array, PCS units, UPS units or thyristor run bypass maintenance, utility grid passes through institute Inspection travel is stated to bypass to important load power supply.
The beneficial effect of the present invention compared with the prior art is:
Uninterrupted energy storage for power supply system provided by the invention and its operation method, mains-supplied be in the peak electricity period or Utility grid voltage occurs under the temporarily abnormal conditions of drop, temporary liter or power failure, and the power supply of important load can quickly switch Powered to array by UPS units, greatly improve the power supply reliability of important load, reduce because of utility grid voltage Temporarily drop, temporarily rise, economic loss caused by the case of power failure.Meanwhile important load can be also reduced in alternating current using the present invention The demand charge of the electric period operation in power supply peak, reaches belt-tightening purpose.
Brief description of the drawings
Fig. 1 is the structure diagram for the uninterrupted energy storage for power supply system that the embodiment of the present invention one provides;
Fig. 2 is the structure diagram of uninterrupted energy storage for power supply system provided by Embodiment 2 of the present invention.
Embodiment
Below in conjunction with attached drawing, the technical characteristic above-mentioned and other to the present invention and advantage are clearly and completely described, Obviously, described embodiment is only the section Example of the present invention, rather than whole embodiments.
Referring to Fig. 1, the uninterrupted energy storage for power supply system of the offer of the embodiment of the present invention one, including array 100, PCS are mono- Member 200, UPS units 300 and thyristor operation bypass 400.Array 100 connects PCS units 200 and UPS units respectively 300, array 100 stores the energy needed for important load operation by PCS units 200, and is discharged by UPS units 300 Energy needed for important load operation.PCS units 200 connect utility grid, for when mains-supplied is in default paddy electricity Between section when, electric energy obtained from utility grid and is sent to array 100 stored;UPS units 300 connect important negative Carry, for powering under following two situations to important load:A, when alternating current is in the default peak electricity period;B, whichever Period, as long as alternating current appearance exception, such as the temporary drop of voltage, temporarily liter, interruption, all supplied from UPS units 300 to important load Electricity.
400 connection utility grid of thyristor operation bypass and important load, for being in default paddy electricity in mains-supplied When period or ordinary telegram period, power to important load.
The uninterrupted energy storage for power supply system that embodiment one provides, the time of running use local mains-supplied according to system Peak electricity, paddy electricity, ordinary telegram period, set 200 charged state in different time periods of PCS units and 300 different time sections of UPS units Discharge condition;
When mains-supplied is in the default paddy electricity period, utility grid is by thyristor operation bypass 400 to important Load supplying;Meanwhile PCS units 200 obtain electric energy from utility grid, charge to array 100;UPS units 300 are kept Output voltage is consistent with utility grid voltage, inactivity output;
When mains-supplied is in the default ordinary telegram period, utility grid is by thyristor operation bypass 400 to important Load supplying;PCS units 200 are disconnected with utility grid, and UPS units 300 keep output voltage consistent with utility grid voltage, nothing Power output;
When mains-supplied is in default peak electric period, PCS units 200 and thyristor operation bypass 400 at the same time with Utility grid disconnects;300 output power of UPS units, is powered by the electric discharge of array 100 to important load;Supplied in alternating current After the electric peak electric period, the output voltage of UPS units 300 keeps consistent with utility grid voltage, in realization and thyristor After operation 400 simultaneous interconnectings of bypass, UPS units 300 gradually decrease its output power, until being zero, are led to again by utility grid Thyristor operation bypass 400 is crossed to power to important load.
The uninterrupted energy storage for power supply system that the present embodiment one provides, by setting array 100, PCS units 200, UPS Unit 300 and thyristor operation bypass 400 form duplex feeding route, to ensure the reliability of important load power supply.
Specifically, when mains-supplied is in the default paddy electricity period, utility grid passes through thyristor operation bypass 400 Power to important load;Meanwhile PCS units 200 obtain electric energy from utility grid, charge to array 100;UPS units 300 keep output voltage consistent with utility grid voltage, inactivity output;When mains-supplied is in the default ordinary telegram period When, utility grid is powered by thyristor operation bypass 400 to important load;PCS units 200 are disconnected with utility grid, and UPS is mono- Member 300 keeps output voltage consistent with utility grid voltage, inactivity output, to ensure to be in the peak electric period in mains-supplied Or there is temporary drop, temporary liter, power failure in emergency circumstances to utility grid voltage in section at any time, the power supply of important load Array can be quickly switched to power by UPS units 300, greatly improve the power supply reliability of important load.
Referring to Fig. 2, uninterrupted energy storage for power supply system provided by Embodiment 2 of the present invention, on the basis of above-described embodiment one Further include inspection travel bypass 500;
500 connection utility grids and important load of inspection travel bypass, for array 100, PCS units 200, When UPS units 300 or thyristor operation 400 at least one maintenance of bypass, power to important load.For example, work as thyristor When operation bypass 400 needs maintenance, utility grid is powered by inspection travel bypass 500 to important load.
The paddy electricity period is in when powering mode operates in mains-supplied, between using local peak valley usually according to system Section, sets 200 charged state in different time periods of PCS units and 300 discharge condition in different time periods of UPS units.When in During the paddy electricity period, alternating current input is charged by PCS units 200 to array 100, while alternating current input is transported by thyristor Row bypass 400 is powered to important load, and control UPS units 300 keep output voltage consistent with utility grid voltage, but do not export Power, with ensure to be in the peak electric period in mains-supplied or utility grid voltage occur temporary drop, temporarily rise, power failure it is urgent In the case of, the power supply of important load can quickly be switched to array 100 and be powered by UPS units 300.
The ordinary telegram period is in when powering mode operates in mains-supplied, between using local peak valley usually according to system Section, sets 200 charged state in different time periods of PCS units and 300 discharge condition in different time periods of UPS units.Work as alternating current When power supply is in the ordinary telegram period, mains supply is disconnected with PCS units 200, and alternating current does not charge to array 100, alternating current electricity Source is powered by thyristor operation bypass 400 to important load completely, and control UPS units 300 keep output voltage and alternating current electricity Net voltage is consistent, but not output power, ensures to be in the peak electric period in mains-supplied or temporary drop, temporarily occurs in utility grid voltage In emergency circumstances, the power supply of important load can quickly be switched to array 100 and pass through UPS units for liter, power failure 300 power supplies.
The peak electric period is in when powering mode operates in mains-supplied, between using local peak valley usually according to system Section, sets 200 charged state in different time periods of PCS units and 300 discharge condition in different time periods of UPS units.When in During the peak electricity period, mains supply is disconnected with PCS units 200, while thyristor operation bypass 400 is also disconnected with mains supply, Mains supply is not powered to important load completely, and at this time, 300 output power of UPS units, the power supply of important load passes through electricity completely The electric discharge power supply of pond array 100, when mains-supplied peak, the electric period terminates, and control UPS output voltages are still kept and alternating current Network voltage is consistent, and realizes thyristor operation 400 simultaneous interconnectings of bypass, and the output power of UPS units 300 gradually decreases, directly Most zero, mains supply is powered again through thyristor operation bypass 400 to important load.
There is temporary drop, temporary liter, power failure in emergency circumstances when powering mode operates in utility grid voltage, no matter this When mains-supplied be in peak valley and put down which period, thyristor operation bypass 400 disconnects, and mains supply is not completely to important load Power supply, 300 output power of UPS units, the power supply of important load is powered by the electric discharge of array 100 completely, until the above After emergency, control UPS 300 output voltages of unit are consistent with utility grid voltage, and realize thyristor operation bypass 400 simultaneous interconnectings, the output power of UPS units 300 gradually decrease, until being zero, mains supply is run again through thyristor Bypass 400 is powered to important load.
When powering mode operates in thyristor operation bypass 400, array 100, PCS units 200 or UPS units 300 At least one is needed in the case of overhauling, and mains supply is disconnected with thyristor operation bypass 400 at this time, and mains supply passes through Inspection travel bypass 500 is powered to important load.After maintenance, corresponding Working mould is switched to according to the corresponding period Formula.
Particular embodiments described above, has carried out the purpose of the present invention, technical solution and beneficial effect further Describe in detail, it will be appreciated that the foregoing is merely the specific embodiment of the present invention, the protection being not intended to limit the present invention Scope.Particularly point out, to those skilled in the art, within the spirit and principles of the invention, that is done any repaiies Change, equivalent substitution, improvement etc., should all be included in the protection scope of the present invention.

Claims (5)

1. a kind of uninterrupted energy storage for power supply system, it is characterised in that including array, PCS units, UPS units and brilliant lock Pipe operation bypass;
The array connects PCS units and UPS units respectively;
The PCS units, connect utility grid, for when mains-supplied is in the default paddy electricity period, from utility grid Middle acquisition electric energy and sending to the array is stored;
The UPS units, connect important load, for mains-supplied be abnormal or mains-supplied be in default peak electric During the period, electric energy is obtained from the array, is powered to important load;
The thyristor operation bypass, connects utility grid and important load, for when mains-supplied is in default paddy electricity Between section or during the ordinary telegram period, power to important load.
2. uninterrupted energy storage for power supply system according to claim 1, it is characterised in that further include inspection travel bypass;
The inspection travel bypass, connects utility grid and important load, for mono- in the array, PCS units, UPS When member or thyristor operation bypass maintenance, power to important load.
3. uninterrupted energy storage for power supply system according to claim 1 or 2, it is characterised in that mains-supplied is abnormal bag The temporary drop of line voltage is included, temporarily rises or interrupts.
It is 4. a kind of such as the operation method of the uninterrupted energy storage for power supply system of claims 1 to 3 any one of them, it is characterised in that Comprise the following steps:
According to system using the peak electricity of local mains-supplied, paddy electricity, ordinary telegram period, the PCS units different time is set The charged state and the UPS units discharge condition in different time periods of section;
When mains-supplied is in the default paddy electricity period, utility grid is supplied by thyristor operation bypass to important load Electricity;Meanwhile the PCS units obtain electric energy from utility grid, charge to the array;The UPS units keep defeated It is consistent with utility grid voltage to go out voltage, inactivity output;
When mains-supplied is in the default ordinary telegram period, utility grid is bypassed to important load by thyristor operation Power supply;The PCS units are disconnected with the utility grid;The UPS units keep output voltage consistent with utility grid voltage, Inactivity exports;
When mains-supplied is in the default peak electricity period, the PCS units and thyristor operation bypass while and city Power grid disconnects;The UPS units output power, is powered by the electric discharge of array to important load;
After the mains-supplied peak electric period, the output voltage of the UPS units keeps consistent with utility grid voltage, Realize after bypassing simultaneous interconnecting with thyristor operation, the UPS units gradually decrease its output power, until being zero, by alternating current Power grid is powered again through thyristor operation bypass to important load.
5. the operation method of uninterrupted energy storage for power supply system according to claim 4, it is characterised in that further include following step Suddenly:
When the array, PCS units, UPS units or thyristor run bypass maintenance, utility grid passes through the inspection Operation bypass is repaiied to power to important load.
CN201710954817.6A 2017-10-13 2017-10-13 A kind of uninterrupted energy storage for power supply system and its operation method Pending CN107947339A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710954817.6A CN107947339A (en) 2017-10-13 2017-10-13 A kind of uninterrupted energy storage for power supply system and its operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710954817.6A CN107947339A (en) 2017-10-13 2017-10-13 A kind of uninterrupted energy storage for power supply system and its operation method

Publications (1)

Publication Number Publication Date
CN107947339A true CN107947339A (en) 2018-04-20

Family

ID=61935316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710954817.6A Pending CN107947339A (en) 2017-10-13 2017-10-13 A kind of uninterrupted energy storage for power supply system and its operation method

Country Status (1)

Country Link
CN (1) CN107947339A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111146858A (en) * 2020-01-20 2020-05-12 深圳市科陆电子科技股份有限公司 Uninterruptible power supply method and system
CN112491125A (en) * 2019-09-12 2021-03-12 北京新能源汽车股份有限公司 Trade power station and power supply system thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102882237A (en) * 2011-07-15 2013-01-16 珠海银通新能源有限公司 Intelligent energy storage machine and operating method thereof
CN204068410U (en) * 2014-06-13 2014-12-31 刘卡丁 Urban track traffic light current integrated UPS system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102882237A (en) * 2011-07-15 2013-01-16 珠海银通新能源有限公司 Intelligent energy storage machine and operating method thereof
CN204068410U (en) * 2014-06-13 2014-12-31 刘卡丁 Urban track traffic light current integrated UPS system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112491125A (en) * 2019-09-12 2021-03-12 北京新能源汽车股份有限公司 Trade power station and power supply system thereof
CN111146858A (en) * 2020-01-20 2020-05-12 深圳市科陆电子科技股份有限公司 Uninterruptible power supply method and system

Similar Documents

Publication Publication Date Title
CN107222029B (en) Combined modularized mobile energy storage system
US20130249298A1 (en) Hybrid integrated wind-solar-diesel-city power supply system
CN105723587B (en) UPS for mixed AC loads and DC loads
CN105162125B (en) Ac/dc is for electric installation and uninterruptible power system
CN104247240B (en) Band is used as the UPS of the incremental transducer of the input electric power adjuster in double transformation systems
CN103441562B (en) High voltage direct current electric power system
EP3391506A1 (en) Data center power systems with dynamic source designation
CN103051042A (en) Direct current uninterruptible power supply
CN104333111B (en) DC uninterrupted system and device
CN103490492B (en) High voltage direct current electric power system
CN105429280A (en) Uninterruptable power supply system and method
CN212723926U (en) Virtual digital currency digs ore deposit machine series connection power supply circuit
CN106130084A (en) Novel uninterrupted power source
CN106356989A (en) Direct-current output integrated uninterrupted power supply circuit and control method
CN107947339A (en) A kind of uninterrupted energy storage for power supply system and its operation method
CN206249231U (en) Power supplying system of server
CN205070433U (en) Exchange direct current device
CN103701189B (en) A kind of distributed dynamic balanced power supply method of networking
CN102130493A (en) Method for power supply of direct current bus voltage-adjustable railway signal power module
US11881773B2 (en) Systems and methods for reducing power consumption of a power supply during a load's sleep mode
KR100509263B1 (en) A high efficiency uninterruptible power supply of a on and off line compositeness to come
CN207459822U (en) A kind of uninterrupted energy storage for power supply system
CN203301212U (en) Dual standby saving type DC power supply system
CN203933133U (en) A kind of distributed high voltage direct current electric power system of networking
Gonzales et al. High efficiency fuel cell based uninterruptible power supply for digital equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420

RJ01 Rejection of invention patent application after publication