CN103036404A - Timing sequence design method of dicycle information acquisition and processing execution in turns - Google Patents

Timing sequence design method of dicycle information acquisition and processing execution in turns Download PDF

Info

Publication number
CN103036404A
CN103036404A CN2012105355063A CN201210535506A CN103036404A CN 103036404 A CN103036404 A CN 103036404A CN 2012105355063 A CN2012105355063 A CN 2012105355063A CN 201210535506 A CN201210535506 A CN 201210535506A CN 103036404 A CN103036404 A CN 103036404A
Authority
CN
China
Prior art keywords
information
control unit
brachium pontis
segmentation
time period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105355063A
Other languages
Chinese (zh)
Other versions
CN103036404B (en
Inventor
姜喜瑞
谢敏华
高阳
王韧秋
汤广福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
China EPRI Electric Power Engineering Co Ltd
Smart Grid Research Institute of SGCC
Original Assignee
DALIAN POWER SUPPLY Co OF LIAONING ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
China EPRI Electric Power Engineering Co Ltd
Smart Grid Research Institute of SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN POWER SUPPLY Co OF LIAONING ELECTRIC POWER Co Ltd, State Grid Corp of China SGCC, China EPRI Electric Power Engineering Co Ltd, Smart Grid Research Institute of SGCC filed Critical DALIAN POWER SUPPLY Co OF LIAONING ELECTRIC POWER Co Ltd
Priority to CN201210535506.3A priority Critical patent/CN103036404B/en
Publication of CN103036404A publication Critical patent/CN103036404A/en
Application granted granted Critical
Publication of CN103036404B publication Critical patent/CN103036404B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a timing sequence design method of dicycle information acquisition and processing execution in turns. The method include a first step of collecting sent block valve information of a bridge arm segmentation control unit in T1 period, and a second step of processing and comprehensively ranking the collected block valve information in T 2 period. A layering and segmenting type collecting and processing structure solves the problem of the limits to collecting ability and processing ability of large-scale submodule module information from valve base control equipment. The collection and processing can be carried out in a dicycle mode in turns. The formation of a microsecond level decision of enormous collecting and processing information is guaranteed. A dicycle achievement is adopted, the adopted method is that an acquisition cycle and a processing and counting period run in turns, and therefore whole voltage balance effect collected and controlled by a bridge arm is macroscopic and reasonable.

Description

The time sequence design method that a kind of binary cycle information gathering and processing are carried out in turn
Technical field
The invention belongs to electric and electronic technical field, be specifically related to a kind of binary cycle information gathering and process the time sequence design method of carrying out in turn.
Background technology
Current, be applied to more and more the fields such as electric power system, locomotive traction, Aero-Space based on the various Power Electronic Circuit of all-controlling power electronics device IGBT.Along with the development of power electronic technology and material, manufacturing process, the through-current capability of IGBT device is also more and more stronger, makes it also obtain important performance space in the direct current transportation field, has directly promoted birth and the development of Technology of HVDC based Voltage Source Converter.Different from traditional high voltage dc transmission technology, the flexible DC power transmission converter has substituted the Thyristors in series converter valve with the high-voltage commutation valve that is made of the IGBT series connection, has formed the flexible direct current converter of voltage-source type.Flexible DC power transmission can be realized powering to remote middle-size and small-size isolated, weak load; Can carry out independent, accurately, meritorious/Reactive Power Control flexibly, improve economy and the stability of system load flow transmission; Direct voltage polarity is constant when trend is reversed, and conveniently consists of the multi-terminal HVDC transmission system; When linking system short-circuit, do not increase the capacity of short circuit of system, be conducive to limiting short-circuit current, stop the fault pervasion of system; Reactive power support and FREQUENCY CONTROL can be provided, be used for the regenerative resources such as wind energy turbine set and the distributed power generation special advantage that is incorporated into the power networks; Behind the electric network fault that links, can provide the black power supply that starts, the fast restoration capabilities behind the quickening electric network fault; The current conversion station floor space greatly reduces with respect to conventional DC.
The abundant performance advantage of Technology of HVDC based Voltage Source Converter has attracted numerous scientific research technical staff to put into relevant research and has put into practice in the work, its flexibly control performance also so that the control guard method of flexible direct current and control protective unit become the study hotspot of flexible direct current technology.In the control based on the flexible direct current of modularization multi-level converter topological structure, be very important link in the whole control protection system to the control protection of converter submodule inside.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the invention provides a kind of binary cycle information gathering and process the time sequence design method of carrying out in turn, the acquisition process structure of layer and section formula has solved the problem of valve base control appliance to the acquisition and processing capabilities limits of extensive submodule information, binary cycle carries out acquisition and processing thought in turn, has guaranteed that the Microsecond grade decision-making of huge Information Monitoring and processing forms; Take binary cycle to realize, collection period and process in turn operational mode of computing cycle, the balance of voltage effect that brachium pontis is gathered control whole brachium pontis is more macroscopical reasonable.
In order to realize the foregoing invention purpose, the present invention takes following technical scheme:
A kind of binary cycle information gathering is provided and processes the time sequence design method of carrying out in turn, said method comprising the steps of:
Step 1: gather the sectioning valve information of sending on the brachium pontis segmentation control unit in the T1 cycle;
Step 2: in the cycle sectioning valve information that gathers is processed with integrated ordered at T2.
Described sectioning valve information comprise these all submodules of segmentation voltage and, bypass count, operation information and error protection information.
The described T1 cycle is divided into t1~t2 time period and t2~t3 time period; The described T2 cycle is divided into t3~t4 time period and t4~t5 time period.
Described step 1 may further comprise the steps:
Step 1-1:t1~t2 is in the time period, and the modulation intelligence according to the circulation control unit issues adopts the bridge arm voltage balanced algorithm, forms the modulation voltage information that each brachium pontis segmentation control unit needs, and sends to each brachium pontis segmentation control unit;
Step 1-2:t2~t3 is in the time period, and brachium pontis gathers control unit and gathers respectively the sectioning valve information of sending on each brachium pontis segmentation control unit, guarantees all to gather complete; Arrangement sectioning valve information gathers and uploads the sectioning valve information of whole brachium pontis and control protection information to the circulation control unit.
Brachium pontis gathers control unit by the mode of poll and flag bit mark, gathers the sectioning valve information of sending on each brachium pontis segmentation control unit, guarantees to receive the information that has gathered and does not repeat to receive, and does not accept and believe breath and does not miss.
Described step 2 may further comprise the steps:
Step 2-1:t3~t4 is in the time period, and the modulation intelligence according to the circulation control unit issues adopts the bridge arm voltage balanced algorithm, forms the modulation voltage information that each segmentation control unit of brachium pontis needs, and sends to each brachium pontis segmentation control unit;
Step 2-2:t4~t5 sorted by the average voltage of bubbling method to each brachium pontis segmentation control unit in the time period, and arrangement sectioning valve information, gathered and uploaded the sectioning valve information of whole brachium pontis and control protection information to the circulation control unit.
Described bridge arm voltage balanced algorithm is that the average voltage to whole each segmentation of brachium pontis carries out macro-control, and each segmentation submodule average voltage is consistent as much as possible; Obtain the information that each brachium pontis segmentation control unit current period need to be modulated by the bridge arm voltage balanced algorithm, send to respectively each brachium pontis segmentation control unit.
Compared with prior art, beneficial effect of the present invention is:
1. the acquisition process structure of layer and section formula has solved the problem of valve base control appliance to the acquisition and processing capabilities limits of extensive submodule information, binary cycle carries out acquisition and processing thought in turn, has guaranteed that the Microsecond grade decision-making of huge Information Monitoring and processing forms;
2. take binary cycle to realize, collection period and process in turn operational mode of computing cycle, the balance of voltage effect that brachium pontis is gathered control whole brachium pontis is more macroscopical reasonable;
3. ordered pair switching time, system sequence without any restriction, and have greatly strengthened reliability and the fault tolerant of system to balance of voltage effect and system protection etc. without any impact during binary cycle;
4. in large capacity MMC flexible DC power transmission system, converter valve brachium pontis cascade number is large, and the acquisition process structure of layer and section formula has guaranteed that the Microsecond grade decision-making of huge Information Monitoring and processing forms;
5. brachium pontis gathers control unit the information of voltage of each brachium pontis segmentation control unit is collected, and can't form ordered sequence within the monocycle, and binary cycle carries out acquisition and processing thought in turn, makes that to gather the balance of voltage effect of control whole brachium pontis more macroscopical reasonable.
Description of drawings
Fig. 1 is the modularization multi-level converter topology diagram;
Fig. 2 is that brachium pontis gathers the processing collection calculating of control unit monocycle and processing procedure schematic diagram;
Fig. 3 is that brachium pontis gathers the information gathering of control unit binary cycle and schematic diagram is carried out in processing in turn.
Embodiment
Below in conjunction with accompanying drawing the present invention is described in further detail.
Such as Fig. 1, valve base control appliance structured flowchart as shown in Figure 1, it is processor DSP+ programmable device FPGA that brachium pontis wherein gathers the control unit core, interface comprises the information communication with protocol communication and a plurality of brachium pontis segmentation control units of circulation unit, the valve information of a plurality of brachium pontis segmenting units is unified to gather, adopt the balance of voltage strategy of whole brachium pontis, make whole brachium pontis submodule capacitance voltage balance movement.
Such as Fig. 2, brachium pontis gathers the control unit monocycle and processes collection calculating and processing procedure, and step is as follows,
The t1-t2 time period:
● according to the modulation intelligence that electric current current control unit issues, adopt bridge arm voltage balanced algorithm strategy, form the modulation voltage information that each segmentation control unit of brachium pontis needs, send to each segmentation control unit;
The t2-t3 time period:
● wait for each segmentation control feedback valve information of brachium pontis;
The t3-t4 time period
● gather respectively the valve information of sending in each brachium pontis segmentation that receives, guarantee all to gather to receive
● each bridge arm voltage ordering is processed;
● arrangement valve information, gather the control protection information, upwards send current control unit;
● each segment information arrangement is sent to current control unit;
● brachium pontis gathers control unit and sorts according to the submodule information of voltage that upper each segmentation of cycle brachium pontis issues;
The above t1-t4 time period is one-period T, in one-period, above task is all finished, then the processing time needs to be less than 70% of the whole cycle at least, and 30% free time in whole like this cycle can be satisfied the stability requirement of system's high reliability and the emergency case processing requirements of high fault tolerance.By test as can be known, the length of this time period depends on the processing time of brachium pontis segmentation control unit feeding-back valve information feedback, and segmentation is more, and the time is longer, even the situation that can't be disposed in the cycle may occur.
Such as Fig. 3, the invention provides a kind of binary cycle information gathering and process the time sequence design method of carrying out in turn, said method comprising the steps of:
Step 1: gather the sectioning valve information of sending on the brachium pontis segmentation control unit in the T1 cycle;
Step 2: in the cycle sectioning valve information that gathers is processed with integrated ordered at T2.
Described sectioning valve information comprise these all submodules of segmentation voltage and, bypass count, operation information and error protection information.
The described T1 cycle is divided into t1~t2 time period and t2~t3 time period; The described T2 cycle is divided into t3~t4 time period and t4~t5 time period.
Described step 1 may further comprise the steps:
Step 1-1:t1~t2 is in the time period, and the modulation intelligence according to the circulation control unit issues adopts the bridge arm voltage balanced algorithm, forms the modulation voltage information that each brachium pontis segmentation control unit needs, and sends to each brachium pontis segmentation control unit;
Step 1-2:t2~t3 is in the time period, and brachium pontis gathers control unit and gathers respectively the sectioning valve information of sending on each brachium pontis segmentation control unit, guarantees all to gather complete; Arrangement sectioning valve information gathers and uploads the sectioning valve information of whole brachium pontis and control protection information to the circulation control unit.
Brachium pontis gathers control unit by the mode of poll and flag bit mark, gathers the sectioning valve information of sending on each brachium pontis segmentation control unit, guarantees to receive the information that has gathered and does not repeat to receive, and does not accept and believe breath and does not miss.
Described step 2 may further comprise the steps:
Step 2-1:t3~t4 is in the time period, and the modulation intelligence according to the circulation control unit issues adopts the bridge arm voltage balanced algorithm, forms the modulation voltage information that each segmentation control unit of brachium pontis needs, and sends to each brachium pontis segmentation control unit;
Step 2-2:t4~t5 sorted by the average voltage of bubbling method to each brachium pontis segmentation control unit in the time period, and arrangement sectioning valve information, gathered and uploaded the sectioning valve information of whole brachium pontis and control protection information to the circulation control unit.
Described bridge arm voltage balanced algorithm is that the average voltage to whole each segmentation of brachium pontis carries out macro-control, and each segmentation submodule average voltage is consistent as much as possible; Obtain the information that each brachium pontis segmentation control unit current period need to be modulated by the bridge arm voltage balanced algorithm, send to respectively each brachium pontis segmentation control unit.
Per cycle of current control unit (100 microseconds or still less) gathers control unit to brachium pontis and sends modulation intelligence and other relevant informations, among the figure from t1 constantly, the balance of voltage strategy that brachium pontis gathers control unit then to be needed to carry out whole brachium pontis is realized, reach the work such as control information processing, afterwards the switching decision-making is sent to each brachium pontis segmentation control unit, then, received the information feedback of the brachium pontis segmentation control unit transmission in a upper cycle; Afterwards, in next cycle, namely t3 is constantly among the figure, the balance of voltage strategy that brachium pontis gathers control unit then to be needed to carry out whole brachium pontis is realized, and the work such as control information processing, the processing of sorting of the voltage that will collect afterwards is the t3~t4 time period among the figure during this period of time; Like this, finished respectively process to gather and computing at binary cycle, thereby avoided both to coexist in the one-period, it is excessive that the formed processing time accounts for cycle proportion, maybe can't finish the work, and reduces the correlated performances such as System Error-tolerance Property and reliability.
Should be noted that at last: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit, although with reference to above-described embodiment the present invention is had been described in detail, those of ordinary skill in the field are to be understood that: still can make amendment or be equal to replacement the specific embodiment of the present invention, and do not break away from any modification of spirit and scope of the invention or be equal to replacement, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (7)

  1. A binary cycle information gathering with process the time sequence design method of carrying out in turn, it is characterized in that: said method comprising the steps of:
    Step 1: gather the sectioning valve information of sending on the brachium pontis segmentation control unit in the T1 cycle;
    Step 2: in the cycle sectioning valve information that gathers is processed with integrated ordered at T2.
  2. Binary cycle information gathering according to claim 1 with process the time sequence design method of carrying out in turn, it is characterized in that: described sectioning valve information comprise these all submodules of segmentation voltage and, bypass count, operation information and error protection information.
  3. Binary cycle information gathering according to claim 1 with process the time sequence design method of carrying out in turn, it is characterized in that: the described T1 cycle is divided into t1~t2 time period and t2~t3 time period; The described T2 cycle is divided into t3~t4 time period and t4~t5 time period.
  4. Binary cycle information gathering according to claim 1 with process the time sequence design method of carrying out in turn, it is characterized in that: described step 1 may further comprise the steps:
    Step 1-1:t1~t2 is in the time period, and the modulation intelligence according to the circulation control unit issues adopts the bridge arm voltage balanced algorithm, forms the modulation voltage information that each brachium pontis segmentation control unit needs, and sends to each brachium pontis segmentation control unit;
    Step 1-2:t2~t3 is in the time period, and brachium pontis gathers control unit and gathers respectively the sectioning valve information of sending on each brachium pontis segmentation control unit, guarantees all to gather complete; Arrangement sectioning valve information gathers and uploads the sectioning valve information of whole brachium pontis and control protection information to the circulation control unit.
  5. Binary cycle information gathering according to claim 4 with process the time sequence design method of carrying out in turn, it is characterized in that: brachium pontis gathers control unit by the mode of poll and flag bit mark, gather the sectioning valve information of sending on each brachium pontis segmentation control unit, guarantee to receive the information that has gathered and do not repeat to receive, do not accept and believe breath and do not miss.
  6. Binary cycle information gathering according to claim 1 with process the time sequence design method of carrying out in turn, it is characterized in that: described step 2 may further comprise the steps:
    Step 2-1:t3~t4 is in the time period, and the modulation intelligence according to the circulation control unit issues adopts the bridge arm voltage balanced algorithm, forms the modulation voltage information that each segmentation control unit of brachium pontis needs, and sends to each brachium pontis segmentation control unit;
    Step 2-2:t4~t5 sorted by the average voltage of bubbling method to each brachium pontis segmentation control unit in the time period, and arrangement sectioning valve information, gathered and uploaded the sectioning valve information of whole brachium pontis and control protection information to the circulation control unit.
  7. According to claim 4 or 6 described binary cycle information gatherings with process the time sequence design method of carrying out in turn, it is characterized in that: described bridge arm voltage balanced algorithm is that the average voltage to whole each segmentation of brachium pontis carries out macro-control, and each segmentation submodule average voltage is consistent as much as possible; Obtain the information that each brachium pontis segmentation control unit current period need to be modulated by the bridge arm voltage balanced algorithm, send to respectively each brachium pontis segmentation control unit.
CN201210535506.3A 2012-12-12 2012-12-12 Timing sequence design method of dicycle information acquisition and processing execution in turns Active CN103036404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210535506.3A CN103036404B (en) 2012-12-12 2012-12-12 Timing sequence design method of dicycle information acquisition and processing execution in turns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210535506.3A CN103036404B (en) 2012-12-12 2012-12-12 Timing sequence design method of dicycle information acquisition and processing execution in turns

Publications (2)

Publication Number Publication Date
CN103036404A true CN103036404A (en) 2013-04-10
CN103036404B CN103036404B (en) 2015-07-08

Family

ID=48022980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210535506.3A Active CN103036404B (en) 2012-12-12 2012-12-12 Timing sequence design method of dicycle information acquisition and processing execution in turns

Country Status (1)

Country Link
CN (1) CN103036404B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116526638A (en) * 2023-07-04 2023-08-01 宁德时代新能源科技股份有限公司 Modulation method and modulation device of cascade energy storage system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101726640A (en) * 2009-12-23 2010-06-09 中国电力科学研究院 Control and protection system of converter valve operating test device
CN102170123A (en) * 2011-03-16 2011-08-31 中国电力科学研究院 Valve base control equipment sequential method of modularization multilevel flexible DC transmission system
CN102222901A (en) * 2011-06-16 2011-10-19 中国电力科学研究院 Sequence control process for modular multi-level flexible direct-current transmission system control equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101726640A (en) * 2009-12-23 2010-06-09 中国电力科学研究院 Control and protection system of converter valve operating test device
CN102170123A (en) * 2011-03-16 2011-08-31 中国电力科学研究院 Valve base control equipment sequential method of modularization multilevel flexible DC transmission system
CN102222901A (en) * 2011-06-16 2011-10-19 中国电力科学研究院 Sequence control process for modular multi-level flexible direct-current transmission system control equipment

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴亚楠等: "模块化多电平VSC-HVDC换流阀的运行试验方法", 《中国电机工程学报》, vol. 32, no. 30, 25 October 2012 (2012-10-25) *
董文杰等: "模块化多电平变流器均压策略研究", 《电力电子技术》, vol. 46, no. 2, 29 February 2012 (2012-02-29) *
赵岩等: "模块化多电平变流器HVDC输电系统控制策略", 《中国电机工程学报》, vol. 31, no. 25, 5 September 2011 (2011-09-05) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116526638A (en) * 2023-07-04 2023-08-01 宁德时代新能源科技股份有限公司 Modulation method and modulation device of cascade energy storage system
CN116526638B (en) * 2023-07-04 2023-11-21 宁德时代新能源科技股份有限公司 Modulation method and modulation device of cascade energy storage system

Also Published As

Publication number Publication date
CN103036404B (en) 2015-07-08

Similar Documents

Publication Publication Date Title
CN104009666B (en) Method and apparatus for producing three-phase current
CN103560687B (en) Modular multi-level converter system, and control system and control method
CN103078400B (en) Bridge arm collecting protection system suitable for high-capacity MMC (Multi Media Controller) flexible direct-current power transmission system
CN101820230B (en) High-frequency isolation type grid-connected inverter
CN103066805B (en) Capacitor voltage balance control method based on bundling type switching of multiple sub modules
CN102035402B (en) Integrated gate-commutated thyristor (IGCT)-based hybrid cascaded H-bridge multi-level high-voltage inverter
CN102013691A (en) Battery energy storage topology structure without transformer based on MMC modularized multi-level inverter
CN104052026A (en) Submodule topology for modular multi-level transverter and application of modular multi-level transverter
CN201608660U (en) High-frequency isolation grid-connected inverter
CN105811771B (en) A kind of determination method based on the loss of MMC isolated form DC/DC converter switches
CN103904926A (en) Improved modular multilevel transverter submodule topology
CN104617803A (en) Multi-level converter submodule as well as inverter circuit and MMC topology both manufactured from such submodule
CN104914746A (en) MMC converter valve control device based on flexible DC power transmission and control method
CN102013690A (en) MMC (multimedia controller)-based modular multi-level transformerless inductive energy storage topological structure
CN204103794U (en) Power subelement, three-phase MMC topological structure and converter
CN102025166A (en) Power-generating interconnected topological structure of transformerless water-turbine generator
CN103066567B (en) Hierarchical sectional capacity balance control method based on switching number
CN103457468A (en) High voltage direct current-direct current transformer
CN103036210B (en) Layering sectional type capacitive balance control method based on look-up table
CN202406038U (en) IGBT (insulated gate bipolar transistor) module with double-transistor parallel connection unit of wind power converter
CN106329927A (en) Modular multilevel converter-based quasi-zero-current switch DC/DC converter
CN103036404B (en) Timing sequence design method of dicycle information acquisition and processing execution in turns
CN201774263U (en) Non-transformer battery energy storage topological structure based on MMC modular multi-level inverter
CN202563019U (en) Experimental system for testing characteristics of offshore wind electric flexible direct current transmission converter
CN205104918U (en) Big power convertor principal and subordinate control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 102211 Beijing city Changping District Xiaotangshan town big East Village Road No. 270 (future technology city)

Co-patentee after: CHINA-EPRI ELECTRIC POWER ENGINEERING Co.,Ltd.

Patentee after: STATE GRID SMART GRID Research Institute

Co-patentee after: DALIAN POWER SUPPLY COMPANY, STATE GRID LIAONING ELECTRIC POWER Co.,Ltd.

Co-patentee after: State Grid Corporation of China

Address before: 102211 Beijing city Changping District Xiaotangshan town big East Village Road No. 270 (future technology city)

Co-patentee before: CHINA-EPRI ELECTRIC POWER ENGINEERING Co.,Ltd.

Patentee before: STATE GRID SMART GRID Research Institute

Co-patentee before: DALIAN POWER SUPPLY COMPANY OF LIAONING ELECTRIC POWER Co.,Ltd.

Co-patentee before: State Grid Corporation of China

TR01 Transfer of patent right

Effective date of registration: 20170531

Address after: 102211 Beijing city Changping District Xiaotangshan town big East Village Road No. 270 (future technology city)

Co-patentee after: DALIAN POWER SUPPLY COMPANY, STATE GRID LIAONING ELECTRIC POWER Co.,Ltd.

Patentee after: STATE GRID SMART GRID Research Institute

Co-patentee after: State Grid Corporation of China

Address before: 102211 Beijing city Changping District Xiaotangshan town big East Village Road No. 270 (future technology city)

Co-patentee before: CHINA-EPRI ELECTRIC POWER ENGINEERING Co.,Ltd.

Patentee before: STATE GRID SMART GRID Research Institute

Co-patentee before: DALIAN POWER SUPPLY COMPANY, STATE GRID LIAONING ELECTRIC POWER Co.,Ltd.

Co-patentee before: State Grid Corporation of China

CI01 Publication of corrected invention patent application

Correction item: Patentee|Address|Patentee

Correct: China-EPRI Electric Power Engineering Co., Ltd.|102200 Beijing city Changping District South Shao Zhen Nan Road No. 16|Dalian Power Supply Company, State Grid Liaoning Electric Power Co., Ltd.|State Grid Corporation of China

False: State Grid Smart Grid Institute|102211 Beijing city Changping District Xiaotangshan town big East Village Road No. 270 (future technology city)|Dalian Power Supply Company, State Grid Liaoning Electric Power Co., Ltd.|State Grid Corporation of China

Number: 24-02

Volume: 33